Case Summary (BLD) | | | 1/22/2009 | | |
|
|
|
|
Case Summary (BLD) | | | 1/22/2009 | | |
|
|
|
|
DOC - Permit Expired | 8/19/2003 | 8/19/2003 | 8/19/2003 | A | PASS |
Carl Dependahl
|
|
|
Expired by inspector at 8/19/2003 8:24:19 AM
|
DOC-Permit Expired | 8/18/2003 | 8/18/2003 | 8/18/2003 | | DONE |
Carl Dependahl
|
|
|
Permit expired by limitations.
|
BLD-Conference | 5/19/2003 | 5/19/2003 | 5/19/2003 | P | PASS |
Carl Dependahl
|
|
|
Work is ongoing, initial grading/excavation is done... 5/19/2003 2:23:40 PM
|
BLD-Footing | 1/22/2003 | 1/22/2003 | 1/22/2003 | P | PART |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung....grade beams for shore braces, steel/compaction ok, pending MTI report. 1/22/2003 2:13:50 PM
|
BLD-Conference | 1/7/2003 | 1/8/2003 | 1/8/2003 | P | PASS |
Carl Dependahl
|
|
|
Erstad arch's ...rec'd eng's letter re shoring...is considered temporary and will waive spec. insp. for shoring piles. Resubmittals for foundation/shoring are apparently approved. . 1/8/2003 2:17:18 PM
|
Routing Off Site - STRUCTURAL | 12/10/2002 | | 12/17/2002 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 12/10/02 and calcs. to outside eng. kmm
Approved with comments. Faxing comments to architect and engineer of record.
|
Plan resubmittals received | | | 12/10/2002 | | DONE |
|
|
|
Received three copies of revised S2.1 sheets, calculations and cover and response letters. Routed two copies to mike phillips and one copy to outside eng. kmm
|
Routing Off Site - STRUCTURAL | 12/4/2002 | | 12/4/2002 | | FAIL |
|
|
|
Faxed comments for shoring and foundation to engineer. Waiting for responce.
|
BLD-Conference | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | PASS |
Carl Dependahl
|
|
|
WIP...observed "H" piles for temp shoring design, awaiting official approval of resubmittal to change piles/shoring... 12/2/2002 2:43:55 PM
|
Case Summary (BLD) | | | 11/19/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/29/2002 | | 10/31/2002 | | PASS |
|
|
|
|
Plan assigned to (M_P) | 10/28/2002 | | 10/31/2002 | | PASS |
Mike Phillips
|
|
|
10/31/2002 09:08:23 M_P - activity updated through activity BLDA022 from case BLD02-02575.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/31/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/31/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2002 | | DONE |
|
|
|
|
Telephone call | | | 10/31/2002 | | DONE |
|
|
|
permit ready
|
Telephone call | | | 10/31/2002 | | DONE |
|
|
|
permit ready
|
Issue PAID IN FULL permit | | | 10/31/2002 | | DONE |
|
|
|
|
Plan Review Completed(1st rev) | | | 10/29/2002 | | DONE |
|
|
|
|
Routing - PLANNING | 10/28/2002 | | 10/29/2002 | | PASS |
|
|
|
Please not that the handicap drive aisle is not to be used for deliveries.
Approved by TKW on 10-29-02
|
Routing - FIRE | 10/29/2002 | | 10/29/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - Erosion and Sediment | 10/25/2002 | | 10/28/2002 | | PASS |
|
|
|
ESC Permit Application submitted under ESC02-00403 (Bld02-02126)
ESC approved with conditions attached to plans.
|
Plan resubmittals received | | | 10/28/2002 | | DONE |
|
|
|
Received three copies of revised sheets S2.1 and three copies of struct. calcs for the Veltex Shoring. Put with plans. kmm
|
Routing - PUBLIC WORKS | 10/23/2002 | | 10/25/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/21/2002 | | 10/22/2002 | | PASS |
|
|
|
Recorded deed #102114518 on October 3, 2002.
|
Additional plans submitted | | | 10/21/2002 | | DONE |
|
|
|
Received (2) copies of the ESC Plans with narrative.
|
Override - Parcel Holds | | | 10/21/2002 | | |
|
|
|
|
Application received | | | 10/21/2002 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/21/2002 | | DONE |
|
|
|
1. Called Andy Erstad to inform him that I need (2) sets of ESC plans with narrative and revised Certificate of Value for the Building. He will bring by today.
|