Fee Review-notes | 10/21/2002 | 10/21/2002 | 8/10/2004 | | DONE |
|
|
|
|
BLD-Final | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PASS |
Russ Owen
|
|
|
Buck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Ok perm oc letters from engineer and specilal inspector on file. 11/13/2003 10:27:36 PM
|
Letter of compliance | | | 11/14/2003 | | DONE |
|
|
|
Letter of Compliance # 24332 issued 11-14-03.
|
Code Occupancy Approval | | | 11/3/2003 | | PASS |
|
|
|
FINAL SIGNED OFF,
|
BLD-Final | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | NR |
Tom Arcoraci
|
|
|
Buck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Final Inspection | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | PASS |
Troy Cobbley
|
|
|
fire alarm, fire sprinkler and fire life safety finaled 10/31/2003 8:21:07 AM
|
FIRE-Sprinkler Rough-in | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | PASS |
Troy Cobbley
|
|
|
fire alarm, fire sprinkler and fire life safety finaled 10/31/2003 8:20:47 AM
|
Code Occupancy Approval Temp | 10/24/2003 | 10/23/2003 | 10/23/2003 | P | DONE |
Scott M.Brown
|
|
|
TEMP FOR OLD PARKING AREA AND FOR NEW GARAGE, ANOTHER PERMIT AND DR IS FOR ENTRY, TEMP SIGNED OFF. 10/24/2003 12:57:23 PM
|
FIRE-Final Inspection | 9/10/2003 | 9/11/2003 | 9/11/2003 | A | FAIL |
Rick Jackson
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore alarms not interconnected to main hospital; standpipe connections higher than 48 inches 9/11/2003 9:51:27 AM
|
FIRE-Final Inspection | 9/9/2003 | 9/9/2003 | 9/9/2003 | P | CANC |
Troy Cobbley
|
|
|
MIKE; Phone #: ###-#### Cancelled by the general contractor. Will be called in for thursday. 9/9/2003 4:00:16 PM
|
Print permit w/o conditions | | | 9/4/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | PASS |
Tom Arcoraci
|
|
|
mike ###-####
|
Plan resubmittals received | | | 3/26/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets PF-1L1B and PP-1L1B, (1) letter from HDR, (1) detail of #67, (1) copy of correction notice, (1) packet from Bob Inselman, with transmittal. Routed to John Menard.
|
BLD-Concrete | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PASS |
Tom Arcoraci
|
|
|
mti 3/7/2003 4:00:26 PM
|
BLD-Conference | 2/26/2003 | 2/27/2003 | 2/27/2003 | A | PASS |
Tom Arcoraci
|
|
|
mti on site; Phone #: ###-#### Internet Inspection Request from: mike shain
|
BLD-Conference | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | PART |
Tom Arcoraci
|
|
|
mti on site; Phone #: ###-#### Internet Inspection Request from: mike shain
|
BLD-Conference | 2/12/2003 | 2/14/2003 | 2/14/2003 | A | PART |
Tom Arcoraci
|
|
|
Walls MTI on site; Phone #: ###-#### Internet Inspection Request from: mike shain
|
BLD-Conference | 2/12/2003 | 2/13/2003 | 2/13/2003 | A | PART |
Tom Arcoraci
|
|
|
Walls MTI on site; Phone #: ###-#### Internet Inspection Request from: mike shain
|
BLD-Conference | 2/6/2003 | 2/10/2003 | 2/10/2003 | A | PART |
Tom Arcoraci
|
|
|
footing special inspector onsite; Phone #: ###-#### Internet Inspection Request from: mike shain
|
BLD-Conference | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | PART |
Russ Owen
|
|
|
footing special inspector onsite; Phone #: ###-#### Internet Inspection Request from: mike shain, ok pending special inspectio. 2/7/2003 1:19:45 PM
|
BLD-Conference | 1/27/2003 | 1/29/2003 | 1/29/2003 | A | PART |
Tom Arcoraci
|
|
|
mti on site for special inspection; Phone #: ###-#### Internet Inspection Request from: mike shain
|
BLD-Conference | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | PART |
Tom Arcoraci
|
|
|
footing mti for special insp.; Phone #: ###-#### Internet Inspection Request from: mike shain
|
BLD-Conference | 1/20/2003 | 1/22/2003 | 1/22/2003 | A | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: mike shain wip 1/22/2003 1:35:32 PM
|
BLD-Foundation | 1/22/2003 | 1/22/2003 | 1/22/2003 | P | PART |
Tom Arcoraci
|
|
|
wip 1/22/2003 1:07:20 PM
|
BLD-Foundation | 1/14/2003 | 1/14/2003 | 1/14/2003 | P | PART |
Tom Arcoraci
|
|
|
###-#### mike
|
BLD-Footing | 1/8/2003 | 1/9/2003 | 1/9/2003 | P | PART |
Russ Owen
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla DownsWork subject to special inspection. 1/9/2003 2:38:18 PM
|
BLD-Footing | 1/7/2003 | 1/8/2003 | 1/8/2003 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Footing | 12/31/2002 | 1/2/2003 | 1/2/2003 | A | PART |
Tom Arcoraci
|
|
|
###-#### MIKE pending spec insp 1/2/2003 11:08:17 AM
|
(F) Reprint permit | | | 12/20/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/19/2002 | | DONE |
|
|
|
|
BLD-Footing | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### OR ###-#### mti on site 12/18/2002 9:37:01 AM
|
Inspection Record Card- Bld | | | 12/18/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/18/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/18/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2002 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 10/22/2002 | | 12/17/2002 | | PASS |
John Menard
|
|
|
12/17/2002 16:48:20 JCM - activity updated through activity BLDA022 from case BLD02-02583.
|
Routing - PLANNING | 12/16/2002 | | 12/17/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/17/2002 | | 12/17/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 12/13/2002 | | 12/16/2002 | | FAIL |
|
|
|
Landscape plan does not incorporate BRian Jorgenson's comments of November 8, 2002. Applicant has been notified.
|
Routing - PLAN CHECK | 12/16/2002 | | 12/16/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/16/2002 | | DONE |
|
|
|
Received three copies of revised sheetL-101. Routed to John M. kmm
|
Routing - PLANNING | 12/12/2002 | | 12/13/2002 | | PASS |
|
|
|
Plans reviewed for compliance with CUP02-109. Conditions include relocated bus stop to Emerald St and marking a new handicap stall next to the building.
|
Routing - FIRE | 12/13/2002 | | 12/13/2002 | | PASS |
|
|
|
Send to fire asap.
|
Routing - PLAN CHECK | 12/10/2002 | | 12/12/2002 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/10/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 12/5/2002 | | 12/10/2002 | | FAIL |
|
|
|
WATER SUPPLY & LEADIN TO STANDPIPE
|
Routing - PLUMBING | 12/2/2002 | | 12/5/2002 | | PASS |
|
|
|
Approved per plan review #2374 and engineers letter of 12/5/02.
|
Plan Reviewer's activity | | | 12/2/2002 | | PASS |
|
|
|
Plans reviewed and approved, as submitted, with attached plan review comment list. JCM
|
Plan resubmittals received | | | 12/2/2002 | | DONE |
|
|
|
Received three copies of revised sheets PF-1L1B, PP-1L1B. Routed to John M. kmm
|
Routing - PLAN CHECK | 11/22/2002 | | 12/2/2002 | | PASS |
|
|
|
|
Routing - PLUMBING | 11/18/2002 | | 11/22/2002 | | FAIL |
|
|
|
Need more info on ad-1's, sewage ejector design and flammable liquids/sand interceptor.
|
Routing Off Site - STRUCTURAL | 11/12/2002 | | 11/19/2002 | | PASS |
|
|
|
Called pdq to take resubmittals to outside engineering. dkl Received a letter from hte consulting structural engineer indicating that all items had been adequately addressed. JCM
|
Routing - PLANNING | 11/14/2002 | | 11/18/2002 | | FAIL |
|
|
|
Sarah Schafer
Karen Gallagher- Have not met 2 conditions of CUP02-109 regarding handicap stalls and relocation of bus shelter.
|
Routing - PUBLIC WORKS | 11/8/2002 | | 11/14/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/12/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets S-01, S-102B, S-503, (3) comment letters with structural calculations attached. Routed to John Menard.
|
Plan resubmittals received | | | 11/8/2002 | | DONE |
|
|
|
Received five sets of resubmittal sheets C-101, C-102, C-103, L-101, (1) set of calculations and cover letter. Routed to John Menard.
|
Plan resubmittals received | | | 11/8/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets for Addendum #1 to include: GS-101, C-101, C-102, C-103, L-101, S-101A, S-101B, S-102A, S-102B, S-302, S-501, S-503, S-601, A-1L1, A-1L1A, A-1L1B, A-101, A-101A, A-101B, A-102, A-201, A-202, A-301, A-401, A-402, A-501, A-502, A-601, PF-1L1B, PF-1L1B, PP-1L1B, PP-101B, E-0001, E-SP001, EL-101A, EL-101B, EL-10LA, EL-101B, (1) set of specifications, (1) set of sketches/details, with transmittal. Routed to John Menard.
|
Received Certificate of Value | | | 11/7/2002 | | DONE |
|
|
|
Received revised cert. of value that reflects the demolition/excavation permit. Revised project value $3,372.000.
|
Plan resubmittals requested | | | 11/5/2002 | | |
|
|
|
Faxed the architect of record a copy of the plan review comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 11/1/2002 | | 11/5/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing Off Site - STRUCTURAL | 10/22/2002 | | 11/4/2002 | | FAIL |
|
|
|
called pdq to take to outside engineering. dkl Received a comment list from the consulting structural engieer requesting revisions and additional calculations. JCM
|
Routing - PUBLIC WORKS | 10/25/2002 | | 11/1/2002 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian Murphy.
|
Plan resubmittals received | | | 10/30/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets GD-101 and GS-101with (1) copy of O&M narrative and drainage calculations. Routed to Brian Murphy.
|
Routing - PLANNING Land Div | 10/22/2002 | | 10/25/2002 | | PASS |
|
|
|
Parcel is over 5 acres in size.
|
Additional plans submitted | | | 10/22/2002 | | DONE |
|
|
|
Received three additional sets of Site Grading and Drainage Plans for Public Works. Added to plans.
|
Pending Assignment by JCM | 10/22/2002 | | 10/22/2002 | | DONE |
John Menard
|
|
|
10/22/2002 14:31:49 JCM - activity updated through activity BLDA166 from case BLD02-02583.
|
Plans ACCEPTED BY PLAN TECH | | | 10/21/2002 | | DONE |
|
|
|
1. Informed applicant that one more set of plans was required with (3) sets of site grading and drainage plans, O&M, and drainage calcs.
|
Application received | | | 10/21/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/21/2002 | | DONE |
|
|
|
|