VOIDED CHANGE STATUS | | | 11/7/2005 | | DONE |
|
|
|
maybe not doing job??
|
BLD-Conference | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PART |
Russ Owen
|
|
|
I'm showing this has not been paid but there has been inspections would you check this out? thanks linda also reference bld 02-02618. 12/12/2003 10:53:30 AM I called macalvain construction and was told to talk with a Tony there I called told him about the permit THAT NEEDED TO BE PICKED UP AND other perimit bld-02-2618 needed finaling. 12/12/2003 1:01:38 PM 12/12/2003 1:02:42 PM 12/12/2003 1:08:13 PM
|
FIRE-Final Inspection | 12/19/2002 | 12/19/2002 | 12/19/2002 | A | FAIL |
Troy Cobbley
|
|
|
Provide new building address for the main building and provide the correct suite number for the tenant space. There is currently storage on steel racks over 8' which per the approved plans and the fire dept. review notes is not allowed under this permit. Reduce storage hieght or submit for a racking permit
|
BLD-Conference | 12/17/2002 | 12/17/2002 | 12/17/2002 | A | FAIL |
Russ Owen
|
|
|
needs fire/lifesafety, and special inspection reports for rear door. 12/17/2002 11:10:57 AM
|
Inspection Record Card- Bld | | | 11/15/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/15/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/8/2002 | | 11/14/2002 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2002 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 10/28/2002 | | 11/14/2002 | | PASS |
Jason Blais
|
|
|
11/14/2002 11:41:27 JCB - activity updated through activity BLDA022 from case BLD02-02619.
|
Routing - FIRE | 11/4/2002 | | 11/7/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/6/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets 0, A-1, A-2, with comment letter. Routed to Jason Blais.
|
Plan resubmittals requested | | | 11/4/2002 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 10/28/2002 | | 11/4/2002 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans routed to Fire Dept. for review.
|
Routing - PUBLIC WORKS | 10/28/2002 | | 10/28/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/25/2002 | | DONE |
|
|
|
Extra set of plans in hold box.
|
Application received | | | 10/24/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2002 | | |
|
|
|
|
Fee Review-notes | 10/24/2002 | 10/24/2002 | | | |
|
|
|
|