Fee Review-notes | 10/24/2002 | 10/24/2002 | 8/10/2004 | | DONE |
|
|
|
|
BLD-Final | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Perm Occ. :) 10/9/2003 3:27:57 PM
|
First Notice | | 10/9/2003 | 10/9/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 10/9/2003 | 10/9/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/9/2003 | | DONE |
|
|
|
Perm. Occ. Cert. # 9838 issued 10-9-03 to Idaho Endodontics.
|
BLD-Final | 9/16/2003 | 9/17/2003 | 9/17/2003 | A | FAIL |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Hawker Need Plumbing final......Permit was obtained for Mech room Bsmnt change to break room. 9/18/2003 9:00:32 AM
|
Temporary occupancy | | | 8/22/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4985 issued 8-22-03 to Champman Endodontists.
|
BLD-Final | 8/15/2003 | 8/18/2003 | 8/18/2003 | A | PART |
Jim Sly
|
|
|
fn ###-#### scott-showed status fn-customer said not fn yet??? C/N.....Move handrail at ext stairway towards wall 1" Need Perm Occ status for plumbing, Not appr for final Occ until 2 previous items completed and a tenant improvement permit is issued for changing basement Mech room to a break room. 8/18/2003 10:28:14 AM
|
BLD-Final | 8/14/2003 | 8/15/2003 | 8/15/2003 | A | NR |
Carl Dependahl
|
|
|
###-#### ...need resubmittal as re 8/15/2003 4:05:27 PM quested, recall 8/15/2003 4:05:45 PM
|
CHANGE STATUS TO (ISS) | | | 8/15/2003 | | DONE |
|
|
|
not fn yet still working?????
|
FIRE-Final Inspection | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 7:40:12 AM. Contact: ###-####. per Mike Otto the basement is going to have a separate permit - occupancy is approved for the first floor only 8/14/2003 3:38:59 PM
|
BLD-Conference | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PASS |
Jim Sly
|
|
|
###-#### Scott met with Mike Otto and Jennifer and will permit change in Bsmnt Mech rm to break rm for a Tenant Improvement. Now he can final bldg with exception this area. 8/14/2003 3:07:14 PM
|
DOC - Permit Finaled | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 8/14/2003 3:52:04 PM
|
FIRE-Final Inspection | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | CANC |
Troy Cobbley
|
|
|
cancelled until the contractor has breakroom issue decided with the city 8/13/2003 11:27:47 AM
|
FIRE-Final Inspection | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | FAIL |
Troy Cobbley
|
|
|
scott; Phone #: ###-#### Remove thumbturn form main exit, provide approved hardware on the east exit, provide automatic shutdown for the hvac system per UMC 608, provide emergency light and exit sign in basement, breakroom in the basement is shown as a mech. room on the plans. This needs approve by the city 8/13/2003 11:20:35 AM
|
BLD-Final | 8/11/2003 | 8/12/2003 | 8/12/2003 | P | NR |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Code Occupancy Approval | | | 8/12/2003 | | PASS |
|
|
|
ALL IN AS REQUIRED, FINAL SIGNED OFF.
|
BLD-Framing/Rough-in | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | PASS |
Tom Arcoraci
|
|
|
ceiling grid mike -###-####
|
BLD-Framing/Rough-in | 6/13/2003 | 6/16/2003 | 6/16/2003 | P | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PART |
Russ Owen
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Plan Reviewer's activity | | | 5/8/2003 | | DONE |
|
|
|
received request from architect to use portions of the IBC to modify design. Sent letter to architect to provide plan modification and full compliance with IBC and all referenced codes therein. MLO
|
BLD-Framing/Rough-in | 5/6/2003 | 5/7/2003 | 5/7/2003 | A | PART |
Russ Owen
|
|
|
###-#### scottneeds to complete. 5/7/2003 5:07:04 PM
|
BLD-Framing/Rough-in | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | CANC |
Russ Owen
|
|
|
###-#### call first
|
BLD-Framing/Rough-in | 5/5/2003 | 5/5/2003 | 5/5/2003 | P | PART |
Russ Owen
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Darla Downs. posted c/n most prior items complete. 5/5/2003 5:43:03 PM 5/5/2003 5:43:08 PM
|
BLD-Framing/Rough-in | 5/2/2003 | 5/2/2003 | 5/2/2003 | P | PART |
Russ Owen
|
|
|
###-####. note I have done a framing inspection for this on the 10 th but I had the wrong permit number called in. And todays inspection will be done on monday when I will meet with builder. 5/2/2003 3:08:42 PM
|
BLD-Final | 3/19/2003 | 3/20/2003 | 3/20/2003 | A | CANC |
Russ Owen
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 3/20/2003 | 3/20/2003 | 3/20/2003 | A | PART |
Russ Owen
|
|
|
Ok to drywall west wall exterior and roof covering..3/20/2003 12:14:43 PM 3/20/2003 12:15:13 PM
|
BLD-Framing/Rough-in | 3/14/2003 | 3/17/2003 | 3/17/2003 | P | FAIL |
Russ Owen
|
|
|
SCOTT-NAILING INSP; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. needs fasternes throuh the exterior truss blocking contractor notified. 3/18/2003 12:28:34 PM
|
Inspection Record Card- Bld | | | 3/17/2003 | | DONE |
|
|
|
|
BLD-Foundation | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/22/2003 at 17:27:17. Contact: ###-####.
|
BLD-Footing | 1/16/2003 | 1/17/2003 | 1/17/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/16/2003 at 17:40:05. Contact: ###-####.want pm. 1/17/2003 11:33:25 AM
|
BLD-Footing | 1/17/2003 | 1/17/2003 | 1/17/2003 | P | PASS |
Russ Owen
|
|
|
|
(F) Reprint permit | | | 1/13/2003 | | |
|
|
|
|
Routing - FIRE | 1/10/2003 | | 1/10/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/10/2003 | | DONE |
|
|
|
received three copies of plan sheets Plumbing P-1, P-3, P-5, P-6
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/10/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/10/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/25/2002 | | 1/10/2003 | | PASS |
Mike Otto
|
|
|
1/10/2003 15:58:40 MLO - activity updated through activity BLDA022 from case BLD02-02623.
|
Routing - FIRE | 1/8/2003 | | 1/9/2003 | | FAIL |
|
|
|
quantityof medical gases, interior or exterior room
|
Routing - PLAN CHECK | 1/9/2003 | | 1/9/2003 | | NR |
|
|
|
|
Routing - PLUMBING | 1/7/2003 | | 1/7/2003 | | PASS |
Lee Rice
|
|
|
re-route to plumbing when out of ESC. kmm
Approved per UPC and conditions per Quantum Engineering letter of 1/7/03 attached to plumbing review #2369B
|
Routing - Erosion and Sediment | 1/6/2003 | | 1/7/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLUMBING | 12/27/2002 | | 1/3/2003 | | FAIL |
|
|
|
Left engineer message on 12/30/02. Need several items addressed on Medical Gas Plumbing Sheets. Faxed list, 1/3/03.
|
Routing - PLAN CHECK | 12/20/2002 | | 12/26/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/19/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets A-1, A-5, A-7, A-9, S-1, M-1, M-2, M-3, P-1, P-2, P-3, P-4, P-5, P-6, E-2, (1) structural comments, (1) comment letter w/attachment. Routed to Mike Otto.
|
Plan resubmittals received | | | 11/29/2002 | | DONE |
|
|
|
Received two copies of ESC Plan/Narrative. Routed to Mike Otto.
|
Plan Review Completed(1st rev) | | | 11/27/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 11/26/2002 | | 11/27/2002 | | FAIL |
|
|
|
per conversation with architect, he will submit medical gas info
|
Routing - PLAN CHECK | 11/15/2002 | | 11/26/2002 | | FAIL |
|
|
|
corrections faxed and mailed to architect. Fax failed corrections mailed
|
Plan resubmittals requested | | | 11/26/2002 | | DONE |
|
|
|
UBC corrections
|
Routing - Erosion and Sediment | 11/13/2002 | | 11/15/2002 | | FAIL |
|
|
|
ESC plan does not include RP inspection check list. Need 2nd copy of erosion control narrative.
|
Routing - PLUMBING | 11/15/2002 | | 11/15/2002 | | FAIL |
|
|
|
Need to submit stamped medical gas and vaccuum plans and show water supplied equipment lines and add thermal expansion tank.
|
Routing - PLANNING | 11/6/2002 | | 11/13/2002 | | PASS |
|
|
|
Approve per DRH02-242
|
Routing - PLANNING Land Div | 11/1/2002 | | 11/6/2002 | | PASS |
|
|
|
Lot 9 of Times Square Subdivision.
|
Routing - PUBLIC WORKS | 10/31/2002 | | 11/1/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/28/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/28/2002 | | |
|
|
|
|
Application received | | | 10/24/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2002 | | DONE |
|
|
|
|