Fee Review-notes | 10/25/2002 | 10/25/2002 | 8/10/2004 | | DONE |
|
|
|
|
First Notice | | 9/10/2003 | 9/10/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/18/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9766 issued 8-18-03 to the Ada County Highway District.
|
Permanent Occupancy | | 8/15/2003 | 8/15/2003 | | DONE |
|
|
|
|
BLD-Final | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 9:02:03 AM. Contact: ###-####.ok perm oc. 8/14/2003 2:43:45 PM
|
BLD-Final | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 9:15:31 AM. Contact: ###-####. need special inspection for a-325 bolts need special inspection final letter, need x brace at line 5 , west end need accessable entrance to grade at one location of man doors. no temp oc left a c/n. 8/8/2003 11:33:52 AM
|
FIRE-Final Inspection | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 8/8/2003 8:35:25 AM
|
FIRE-Final Inspection | 7/23/2003 | 7/24/2003 | 7/24/2003 | P | FAIL |
Troy Cobbley
|
|
|
fire hydrant is not installed per plans and the one fire hydrant that is on Cloverdale Road appears to exceed 150' (see ufc 903). Provide water supply infor per review comment #2 of fire review notes 7/24/2003 3:46:50 PM
|
Code Occupancy Approval | 7/25/2003 | 7/24/2003 | 7/24/2003 | A | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF. 7/25/2003 10:35:15 AM
|
PubWorks Occupancy Approval | | | 7/24/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 7/24/03. G.Fitts
|
Print Occupancy Form | | | 7/23/2003 | | DONE |
|
|
|
|
BLD-Foundation | 3/6/2003 | 3/7/2003 | 3/7/2003 | A | PART |
Russ Owen
|
|
|
###-#### rebar for foundation wall. Work in progress, will be inspected by special inspector when complete. 3/7/2003 12:10:19 PM
|
BLD-Framing/Rough-in | 2/28/2003 | 3/3/2003 | 3/3/2003 | P | CANC |
Russ Owen
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
(F) Reprint permit | | | 2/18/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/14/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/14/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/28/2002 | | 2/11/2003 | | PASS |
Mike Otto
|
|
|
2/11/2003 09:58:13 MLO - activity updated through activity BLDA022 from case BLD02-02629.
|
Routing Off Site - STRUCTURAL | 1/21/2003 | | 2/11/2003 | | PASS |
|
|
|
Will send to outside eng. when metal building plans received. kmm
Contacted PDQ to take plans to outside eng. kmm
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/11/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/11/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/11/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plan Modification Accepted | | | 2/6/2003 | | DONE |
|
|
|
Approved 2/4/03 letter request from ACHD to delay hydrant installation until late Feb/early March and also agreed to allow installation of the fire hydrant on west side of Coverdale directly opposite the proposed hydrant location shown on plans.
|
Routing - PUBLIC WORKS | 1/29/2003 | | 1/31/2003 | | PASS |
|
|
|
|
Routing - FIRE | 1/31/2003 | | 1/31/2003 | | PASS |
|
|
|
|
Routing - FIRE | 1/28/2003 | | 1/28/2003 | | FAIL |
|
|
|
still need water supply quote
|
Routing - PUBLIC WORKS | 1/22/2003 | | 1/28/2003 | | FAIL |
|
|
|
Requires Drainage Plan
|
Telephone call | | | 1/22/2003 | | DONE |
|
|
|
Telcon from Gilbert Tunning ACHD. Architect indicates hydts are spaced at approx. 600' intervals on Coverdale. They are willing to install a hydrant near the proposed bldg, have discussed with UW but haven't finalized anything yet; but need to get the bldg permit approved. I told him to submit written evidence they are contracting with UW to install the additional hydrant and will have it installed before the bldg is finaled for occupancy and we will accept that to approve the hydt requirement for the bldg permit.
|
Routing - PLAN CHECK | 1/17/2003 | | 1/22/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/15/2003 | | DONE |
|
|
|
Received two copies of metal building anchor bolt plans with engineers seal, revised sheets S1.0, A3.0, sets of sealed structual engineer calculations for footings and foundations. Routed to Mike O. kmm
|
Routing - FIRE | 1/10/2003 | | 1/13/2003 | | FAIL |
|
|
|
still need water supply quote.
|
Routing - PLAN CHECK | 12/19/2002 | | 12/26/2002 | | FAIL |
|
|
|
need foundation plan and calculations architect contacted
|
Plan resubmittals received | | | 12/18/2002 | | DONE |
|
|
|
Received three sets of resubmittal drawings for the metal building C1 OF 1, ES1 OF 1, F1 OF 1, E1 OF 4, E2 OF 4, E3 OF 4, E4 OF 4, S-1, S-2, S-3, W-1, (2) sets of calculations, and cover letter. Routed to Mike Otto.
|
Plan Review Completed(1st rev) | | | 12/10/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 12/6/2002 | | 12/10/2002 | | FAIL |
|
|
|
hydrant location & flow
|
Routing - PLAN CHECK | 12/6/2002 | | 12/6/2002 | | FAIL |
|
|
|
corrections sent to architect. Plans still incomplete
|
Plan resubmittals requested | | | 12/6/2002 | | DONE |
|
|
|
UBC corrections
|
Plan resubmittals received | | | 12/4/2002 | | DONE |
|
|
|
Received two copies of structural calculations for the metal building. Routed to Mike O. kmm
|
Routing - PLUMBING | 11/12/2002 | | 11/12/2002 | | PASS |
|
|
|
Several corrections on cwv system vents, co's and oil interceptor vent and labeling of non-potable water.
|
Routing - PLANNING | 11/4/2002 | | 11/8/2002 | | PASS |
|
|
|
Approved per DRH02-66.
|
Routing - Erosion and Sediment | 11/1/2002 | | 11/4/2002 | | PASS |
|
|
|
Waiver request approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 10/30/2002 | | 11/1/2002 | | FAIL |
|
|
|
Requires revision to site plan. Interior floor drain can not go to stormwater system. Per Brian Murphy
|
Routing - PLANNING Land Div | 10/29/2002 | | 10/30/2002 | | PASS |
|
|
|
Parcel over 5 acres in size.
|
Plans ACCEPTED BY PLAN TECH | | | 10/29/2002 | | PEND |
|
|
|
Requires 3 copies of metal building plans and calculations. Contacted Duane Hays at ###-####. kmm
|
Plan routing begun/NEW & ADDTN | | | 10/29/2002 | | |
|
|
|
|
Application received | | | 10/25/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/25/2002 | | DONE |
|
|
|
|