Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-02641
StatusFinaled
Name RUWE CONSTRUCTION
Site Address 2023 N CLAREMONT DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"12/04/2002 THIS PERMIT IS UPDATED TO INCLUDE THE REMOVAL OF ALL INTERIOR FINISHES, CHANGE OUT PLUMBING SYSTEMS, UPGRADING MECHANICAL AS NEEDED AND ALL ELECTRICAL FROM THE PANEL BOX IN. THIS WORK WILL ADD $135000 TO THE PROJECT VALUE AND FEES ARE TO BE ADJUSTED TO REFLECT SAME.12/04/2002 pep" This project is for the addition of 276s.f. to an existing 4000s.f. single family dwelling and the construction of a 576s.f. detached garage. hillside ok per terry records. R-1B ok per ajb. Seperate electrical, plumbing, mechanicaal and ESC permits are required. All per the approved plans as marked and attached. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled3/7/20043/7/20043/7/2004PPASS
DetailsDave Hannah
Finaled by inspector at 3/7/2004 6:10:49 PM
BLD-Final3/4/20043/5/20043/5/2004PPASS
DetailsDave Hannah
###-#### trenton please call 1st
PostCard Mailed  11/5/2003 SENT
PostCard has been mailed requesting inspection.
BLD-Final4/18/20034/18/20034/18/2003PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2003 at 6:57:20 AM. Contact: ###-####. post address load selfcolsing hinges on garage door pave drive way to new garage 4/18/2003 1:17:50 PM
BLD-Energy code compliance1/7/20031/7/20031/7/2003PPASS
DetailsCarl Dependahl
trenton; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/7/20031/7/20031/7/2003PPASS
DetailsCarl Dependahl
c/n ok
BLD-Framing/Rough-in1/2/20031/2/20031/2/2003PFAIL
DetailsCarl Dependahl
TENTON; Phone #: ###-#### Internet Inspection Request from: Darla Downs, c/n, fireblocks, verify connections, submit eng'g for beam added, show gar. truss calcs, ok to insul. 1/2/2003 4:48:28 PM
BLD-Energy code compliance1/2/20031/2/20031/2/2003PNR
DetailsCarl Dependahl
TENTON; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing12/27/200212/30/200212/30/2002APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/27/2002 at 07:58:47. Contact: ###-####.pad in ext garage 12/30/2002 10:12:26 AM
Inspection Record Card- Bld  12/4/2002 DONE
(F) Reprint permit  12/4/2002 DONE
BLD-Conference11/29/200211/29/200211/29/2002APASS
DetailsCarl Dependahl
W/ Perry re eng'g, roof frame & scope of work...see prior note w/ SWO. 11/29/2002 9:47:25 AM
Plan Reviewer's activity  11/29/2002  
Spoke with contractor on what will be required in order to complete this project as stop work order was issued 11/14/2002 for work progressing beyond the original scope of work. Engineering details were supplied without calculations which must be submitted along with a complete narative on the new scope of work. After new review and approval of the submittals to be received the permit may be amended and stop work notice lifted with the approval of the structural division who issued same. pep 11/29/2002
BLD-Conference11/14/200211/14/200211/14/2002APASS
DetailsCarl Dependahl
SWO issued w/ c/n...need eng's design for roof, describe actual work accurately 11/14/02 12:37:02 PM
BLD-Foundation10/31/200211/4/200211/4/2002PPART
DetailsSteven Webb
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung work in progress 11/4/2002 2:44:34 PM
BLD-Footing10/31/200211/1/200211/1/2002APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung work in progress 11/1/2002 10:35:48 AM
BLD-Footing10/30/200210/31/200210/31/2002ANR
DetailsTony Young
###-####
(F) Reprint permit  10/31/2002  
Inspection Record Card- Bld  10/30/2002 DONE
Telephone call  10/30/2002 DONE
permit ready and fees due
Issue PAID IN FULL permit  10/30/2002 DONE
Plan assigned to (PEP)10/28/2002 10/29/2002 PASS
DetailsPerry Paine
10/29/2002 16:43:17 PEP - activity updated through activity BLDA022 from case BLD02-02641.
Routing - Erosion and Sediment10/28/2002 10/29/2002 PASS
ESC waiver approved with conditions attached to plans.
Print Pending Permit.LaserJet4  10/29/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/29/2002 DONE
Application received  10/28/2002