Permit Information
Permit NumberBLD02-02645
StatusFinaled
Name TOUCHSTONE CONSTRUTION
Site Address 1106 E WASHINGTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 700s.f. second level addition to an existing 1800s.f. 2-story single family dwelling. This addition going to be over an existing 400s.f. garage. All work is to be per the approved plans as marked and attached. R-1C ok per ajb pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/19/20033/20/20033/20/2003PPASS
DetailsDave Hannah
###-####
DOC - Permit Finaled3/20/20033/20/20033/20/2003PPASS
DetailsDave Hannah
Finaled by inspector at 3/20/2003 3:23:07 PM
BLD-Final2/18/20032/19/20032/19/2003PFAIL
DetailsDave Hannah
call first ###-#### so Bret can meet you there. needs two smoke detectors in down stairs bedrooms needs 1 inch clearance and ring around b-vent garage ceiling also needs fire caulk around duct work on garage ceil in garage 2/19/2003 3:19:23 PM
BLD-Final2/10/20032/11/20032/11/2003PNH
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/10/2003 at 12:48:24 PM. Contact: ###-####.
BLD-Framing/Rough-in12/23/200212/23/200212/23/2002APASS
DetailsDave Hannah
all framing c/n items complete but for stais need to check stairs at final 12/23/2002 10:39:59 AM
BLD-Framing/Rough-in12/19/200212/20/200212/20/2002PNH
DetailsTony Young
Scheduled by a contractor via Hello! on 12/19/2002 at 12:16:55. Contact: ###-####.
BLD-Framing/Rough-in12/18/200212/19/200212/19/2002AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/18/2002 at 10:50:11. Contact: ###-####. c/n on site ok to insulate after plm r/i sign off 12/19/2002 9:52:40 AM
BLD-Framing/Rough-in11/19/200211/20/200211/20/2002AFAIL
DetailsDave Hannah
###-#### Sam Howell call first to meet there need to have mec finish duct work above frunace also need to check point loads for micro lam beams and header size over window that beam lands on 11/20/2002 10:06:25 AM
BLD-Framing/Rough-in11/20/200211/20/200211/20/2002PPART
DetailsDave Hannah
sam; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to put floor sheeting on second floor 11/20/2002 2:33:17 PM
Issue PAID IN FULL permit  11/6/2002 DONE
Application received  10/29/2002  
Plan assigned to (PEP)10/29/2002 10/29/2002 PASS
DetailsPerry Paine
10/29/2002 08:53:54 PEP - activity updated through activity BLDA022 from case BLD02-02645.
Plan Review Report  10/29/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/29/2002 DONE
Inspection Record Card- Bld  10/29/2002 DONE
Telephone call  10/29/2002 DONE
PERMIT READY AND FEES DUE