Permit NumberBLD02-02669
StatusFinaled
Name RAFANELLI & NAHAS
Site Address 404 E PARKCENTER BLVD 150
Project NameRIVER QUARRY BLDG A
Customer Number 
ePlanReviewNo
Description
(VANILLA FINISH-NO TENANT)(RIVER QUARRY BLDG A-SUITE #150) To prepare two separate areas for future tenants. The area on the north will be 1470 sq ft. The area to the south will be 2775 sq ft. The area in between the to spaces will remain an exit-access hallway for the existing tenant areas that require two exits. Work will include, construction of two new accessible restrooms and three new dressing rooms, incasing columns, adding a NEW door to the exit-access core area hallway, adding new exit door to tenant space on the north, Electrical, Mechanical & plumbing work, NO OCCUPANCY ALLOWED UNDER THIS PERMIT. Separate permits will be required to Occupy these spaces, NOTE: This building is not fire sprinklered. (pc#701-02) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - L/C Approved  1/28/2003 DONE
lc issued #15255 vanilla finish for River Quarry Building A- Suite 150
BLD-Final1/10/20031/10/20031/10/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/10/2003 at 10:02:17. Contact: ###-####.
BLD-Final1/2/20031/3/20031/3/2003AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2003 at 14:05:32. Contact: ###-####.need approved plan to do insp. 1/3/2003 11:46:22 AM
FIRE-Final Inspection1/2/20031/2/20031/2/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/02/2003 at 08:58:56. Contact: ###-####.
FIRE-Final Inspection1/2/20031/2/20031/2/2003PPASS
DetailsRick Jackson
FIRE-Final Inspection12/30/200212/31/200212/31/2002APASS
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 12/30/2002 at 12:58:04. Contact: ###-####.
BLD-Final12/30/200212/31/200212/31/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/30/2002 at 12:58:51. Contact: ###-####.ok for perm 12/31/2002 4:48:22 PM
BLD-Final12/31/200212/31/200212/31/2002PPASS
DetailsRuss Owen
4.:45:42 PM 12/31/2002 4:46:18 PM 12/31/2002 4:48:40 PM
Print Occupancy Form  12/27/2002 DONE
BLD-Framing/Rough-in12/10/200212/10/200212/10/2002PPASS
DetailsJim Storey
###-####- brian ###-####- brian framing ok mech to be check at ceilling / no ducts off of bathroom fans at this time. 12/10/2002 3:22:10 PM
Override - Parcel Holds  12/10/2002  
Plan assigned to (R_H)11/4/2002 11/27/2002 PASS
Details
11/27/2002 11:49:00 MYS - activity updated through activity BLDA022 from case BLD02-02669.
PLANS/APPL TAKEN TO FRONT DESK  11/27/2002 DONE
Issue PAID IN FULL permit  11/27/2002 DONE
Plan resubmittals received  11/26/2002 DONE
Received two copies of resubmittal sheets S2.1 with Trus Joist letter and calculations. Routed to Ron Hill.
Inspection Record Card- Bld  11/26/2002 DONE
Routing - PLAN CHECK11/18/2002 11/26/2002 PASS
Plan resubmittals received  11/25/2002 DONE
Received two copies of resubmittal sheet A1.0 with response letter. Routed to Ron Hill.
Plan Reviewer's activity  11/20/2002 FAIL
Reviewed resubmitted plans dated 11/19/02, need more information, faxed and mailed requirements to the architect on 11/20/02.
Plan resubmittals received  11/19/2002 DONE
Received two sets of resubmittal sheets A1.0, A2.0, with Trus Joist information and cover letter. Routed to Ron Hill.
Routing - FIRE11/13/2002 11/18/2002 PASS
Plan Reviewer's activity  11/13/2002 FAIL
DetailsRon Hill
plans failed in building department review, Faxed and Mailed requirements to the architect on 11/13/02, routed plans to the fire department on 11/13/02.
Routing - PLAN CHECK11/6/2002 11/13/2002 FAIL
DetailsRon Hill
Routing - PUBLIC WORKS11/4/2002 11/6/2002 PASS
Plans ACCEPTED BY PLAN TECH  10/31/2002 DONE
First Notice10/30/200210/30/200210/30/2002 DONE
Application received  10/30/2002  
Recd Pcfee & Taken To Pln CK  10/30/2002 DONE