Fee Review-notes | 8/13/2003 | 8/13/2003 | 8/13/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/25/2003 | 4/25/2003 | | DONE |
|
|
|
|
BLD-Conference | 4/23/2003 | 4/24/2003 | 4/24/2003 | A | PASS |
Tom Arcoraci
|
|
|
JACK PLEASE CALL BEFORE SO THAT JACK CAN MEET YOU THERE; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for perm occ 4/24/2003 9:17:59 AM
|
BLD-Final | 4/24/2003 | 4/24/2003 | 4/24/2003 | A | PASS |
Tom Arcoraci
|
|
|
ok for perm occ
|
Permanent occupancy | | | 4/24/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9633 issued 4-24-03 to the Auto Zone.
|
PubWorks Occupancy Approval | 4/23/2003 | 4/23/2003 | 4/23/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 4/23/03. M.Strasser
|
FIRE-Final Inspection | 3/28/2003 | 3/31/2003 | 3/31/2003 | A | PASS |
Troy Cobbley
|
|
|
JACK; Phone #: ###-#### Fire life safety finaled 3/31/2003 10:34:29 AM
|
BLD-Final | 3/28/2003 | 3/31/2003 | 3/31/2003 | P | PART |
Tony Young
|
|
|
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ok for temp. occ.,, need other permit for racks finished, and other trades passed 3/31/2003 2:39:35 PM
|
FIRE-Final Inspection | 3/24/2003 | 3/25/2003 | 3/25/2003 | P | FAIL |
Rick Jackson
|
|
|
jack ; Phone #: ###-#### Internet Inspection Request from: Annette Moore extinguisher tags; thumbturns of main exit 3/25/2003 4:04:55 PM
|
BLD-Conference | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | PART |
Tony Young
|
|
|
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
conf. on final 3/21/2003 1:33:07 PM
|
BLD-Framing/Rough-in | 3/7/2003 | 3/10/2003 | 3/10/2003 | A | PART |
Tony Young
|
|
|
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
store front frame, need to clarify vert. or horizontal studs, built vert., plans show horizontal, ok to cover pending arch. approval 3/10/2003 10:01:01 AM
|
BLD-Framing/Rough-in | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | CANC |
Tony Young
|
|
|
JACK; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
not ready 3/7/2003 4:33:42 PM
|
BLD-Framing/Rough-in | 2/27/2003 | 2/27/2003 | 2/27/2003 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
int. bathroom walls ok to cover 2/27/2003 4:12:34 PM
|
BLD-Framing/Rough-in | 2/27/2003 | 2/27/2003 | 2/27/2003 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
int. bathroom walls ok to cover 2/27/2003 4:12:34 PM
|
BLD-Framing/Rough-in | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | PART |
Tony Young
|
|
|
macavain const; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
bolting, pending s. i. report 2/19/2003 9:27:18 AM
|
BLD-Foundation | 2/5/2003 | 2/6/2003 | 2/6/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/05/2003 at 15:47:31. Contact: .
slab edge rebar, insulation, wire mat, hair pins, all wip,,,, pending special inspection reports, work is all about 75%+ done 2/6/2003 3:14:56 PM
|
BLD-Foundation | 1/29/2003 | 1/30/2003 | 1/30/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/29/2003 at 12:44:20. Contact: .
recvd. si cert., pending report 1/30/2003 10:23:30 AM
|
BLD-Footing | 1/24/2003 | 1/27/2003 | 1/27/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/24/2003 at 14:45:53. Contact: .
pending special inspection report on concrete, steel ok 1/27/2003 9:59:12 AM
|
BLD-Footing | 1/23/2003 | 1/24/2003 | 1/24/2003 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/23/2003 at 12:36:02. Contact: .
|
BLD-Footing | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | NR |
Tony Young
|
|
|
late pm
|
(F) Reprint permit | | | 1/23/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 1/21/2003 | 1/22/2003 | 1/22/2003 | A | NR |
Tony Young
|
|
|
|
Issue PAID IN FULL permit | | | 1/22/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/21/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/21/2003 | | DONE |
|
|
|
permit ready and feeds due
|
Print Occupancy Form | | | 1/21/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 11/4/2002 | | 1/21/2003 | | PASS |
Mike Otto
|
|
|
1/21/2003 13:24:01 MLO - activity updated through activity BLDA022 from case BLD02-02697.
|
Routing Off Site - STRUCTURAL | 1/15/2003 | | 1/17/2003 | | PASS |
|
|
|
Contacted PDQ to take plans to outside eng. kmm
|
Routing - FIRE | 1/15/2003 | | 1/17/2003 | | FAIL |
|
|
|
Called Jimmy Hendix. Awaiting more hazmat info
|
Routing - FIRE | 1/17/2003 | | 1/17/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/13/2003 | | 1/15/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/14/2003 | | DONE |
|
|
|
Received four copies of revised sheets AO, A-1, A-2, A-3, A-4, S1, S2, D00, D01, D01A, D02, D02A, D02B, D02C, D03, D04, D04A, D05, D05A, D05C, D05D, D06, D06A, D06B, D06C & D07. One copy of Project Conditions Response, one response letter, two copies of struct. calculations and two copies of building design data. routed to Mike O. kmm
|
Routing - PUBLIC WORKS | 1/9/2003 | | 1/13/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/24/2002 | | 1/3/2003 | | FAIL |
|
|
|
Requires drainage plan.
|
Routing Off Site - STRUCTURAL | 12/20/2002 | | 12/26/2002 | | FAIL |
|
|
|
called pdq to take to outside engineering. dkl Corrections faxed to applicant
|
Plan resubmittals requested | | | 12/26/2002 | | DONE |
|
|
|
structural corrections
|
Plan Review Completed(1st rev) | | | 12/24/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 12/20/2002 | | 12/24/2002 | | FAIL |
|
|
|
haz mat issues
|
Routing - PLAN CHECK | 11/27/2002 | | 12/20/2002 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 12/17/2002 | | DONE |
|
|
|
Received three copies of resubmittal sheets D02-089940-00, D02-089940-01, D02-089940-01A, D02-089940-02, D02-089940-02A, D02-089940-02B, D02-089940-02C, D02-089940-03, D02-089940-04, D02-089940-04A, D02-089940-05, D02-089940-05A, D02-089940-05C, D02-089940-05D, D02-089940-06, D02-089940-06A, D02-089940-06B, D02-089940-06C, D02-089940-07, (3) sets of structural calculations.
|
Routing - PLUMBING | 11/25/2002 | | 11/26/2002 | | PASS |
|
|
|
dcva is required on the water service, if an r.p. is installed, install over the mop sink to recieve discharge. thermol expantion protection may be required.
|
Telephone call | | | 11/26/2002 | | DONE |
|
|
|
Jimmy Hendrix called and wanted John to look at additional plans that were submitted to us on the 21 of Nov. Jimmy would like John M. to call him back (###-####) about what extra information is needed. kmm
|
Routing - PLANNING | 11/18/2002 | | 11/25/2002 | | PASS |
|
|
|
Approved per DRH02-135 and as noted on sheet L0.1, which requires that all shrubs along the east and west walls be of a 4-6 ft. in height at maturity variety.
|
Additional plans submitted | | | 11/21/2002 | | DONE |
|
|
|
Received three sets of A&S Building Systems pre-engineered building plans with Letter of Certification and Engineering Data. On "HOLD" per client's request. A different building manufacturer might be submitted. Per telephone conversation with Jimmy Hendrix 11/21/02 14:29
|
Routing - PUBLIC WORKS | 11/7/2002 | | 11/18/2002 | | FAIL |
|
|
|
|
Routing - Erosion and Sediment | 11/18/2002 | | 11/18/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING Land Div | 11/4/2002 | | 11/7/2002 | | PASS |
|
|
|
|
First Notice | 11/4/2002 | 11/4/2002 | 11/4/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/2002 | | PEND |
|
|
|
1. Called Jimmy Hendrix, need structural calculations and full set of plans from pre-engineered building manufacturer.
|
Application received | | | 11/4/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/4/2002 | | DONE |
|
|
|
|