Fee Review-notes | 11/5/2002 | 11/5/2002 | 8/10/2004 | | DONE |
|
|
|
|
First Notice | | 7/11/2003 | 7/11/2003 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 7/11/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9714 issued 7-11-03 to the Crescent Bar and Grill.
|
Permanent Occupancy | | 6/26/2003 | 6/26/2003 | | DONE |
|
|
|
|
BLD-Final | 6/26/2003 | 6/26/2003 | 6/26/2003 | P | PASS |
Tom Arcoraci
|
|
|
MICHELLE ###-#### ok for perm 6/26/2003 1:15:43 PM
|
Code Occupancy Approval | | | 6/25/2003 | | PASS |
|
|
|
ALL CONDITIONS MET FINAL SIGNED OFF AND RELEASE OF BOND.
|
FIRE-Final Inspection | 6/4/2003 | 6/5/2003 | 6/5/2003 | P | PASS |
Troy Cobbley
|
|
|
###-#### kent Fire life safety finaled. No fire alarm and no sprinklers 6/5/2003 11:50:44 AM
|
BLD-Final | 6/5/2003 | 6/5/2003 | 6/5/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm when others sign perm 6/5/2003 2:26:55 PM
|
Temporary occupancy | | | 6/5/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4962 issued 6-5-03 to the Crescent Bar and Grill.
|
Code Occupancy Approval Temp | 6/5/2003 | 6/4/2003 | 6/4/2003 | A | DONE |
Scott M.Brown
|
|
|
MOST LANDSCAPE NOT IN AND DUMPSTER DOORS, FENCE AND PARKING MARKING, TO BOND FOR A TOTAL OF $18750.00 6/5/2003 9:15:45 AM
|
BLD-Framing/Rough-in | 5/22/2003 | 5/23/2003 | 5/23/2003 | P | PART |
Jim Sly
|
|
|
###-#### kent ceiling grid Grid OK SC 5/23/2003 3:05:57 PM
|
BLD-Framing/Rough-in | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | PART |
Jim Sly
|
|
|
###-#### kent ceiling grid Grid OK SC 5/23/2003 3:05:26 PM
|
Override - Condition Holds | | | 5/23/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 5/23/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 5/22/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 11:34:56 AM. ok to cover walls will call for alcove and soffiet feaming
4/2/2003 8:12:44 AM
|
BLD-Footing | 1/10/2003 | 1/13/2003 | 1/13/2003 | A | PART |
Tom Arcoraci
|
|
|
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 12/9/2002 | 12/10/2002 | 12/10/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok pending spec insp 12/9/2002 3:59:07 PM
|
(F) Reprint permit | | | 12/10/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/9/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/9/2002 | | DONE |
|
|
|
|
Telephone call | | | 12/9/2002 | | DONE |
|
|
|
permit ready and fees due...Parcel hold lifted per tom arcoraci 3/03/03
|
Issue PAID IN FULL permit | | | 12/9/2002 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 11/5/2002 | 11/5/2002 | 12/6/2002 | | PASS |
John Menard
|
|
|
12/6/2002 16:25:58 JCM - activity updated through activity BLDA022 from case BLD02-02709.
|
Routing Off Site - STRUCTURAL | 11/22/2002 | | 12/6/2002 | | PASS |
|
|
|
Routed reviesed plans of 11/22/02 to outside eng. kmm Received letter from consulting structural engineer approving structural resubmittals with request for additional plan revisions to be added to the approved plans. JCM
|
Routing - PLAN CHECK | 12/4/2002 | | 12/6/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/4/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 12/2/2002 | | 12/4/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 11/27/2002 | | 12/2/2002 | | PASS |
|
|
|
Approved per DRH02-00068 and per letter dated July 11, 2002.
|
Plan resubmittals requested | | | 11/27/2002 | | |
|
|
|
Architect of record picked up a copy of the plan review comment list requesting revisions. JCM
|
Plan resubmittals received | | | 11/27/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets SD2, L1, A1.3, A1.4, with transmittal. Routed to John Menard.
|
Routing - PLAN CHECK | 11/19/2002 | | 11/27/2002 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 11/22/2002 | | DONE |
|
|
|
Received three copies of revised sheets S1.1, S2.1, S2.2, S3.1, S3.2, S3.3, S3.4, and Supplemental structural calculations. Routed two copies to John M. and routed other copy to outside eng. kmm
|
Plan resubmittals requested | | | 11/20/2002 | | |
|
|
|
Faxed the architect or record a copy of the plan review comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 11/5/2002 | | 11/20/2002 | | FAIL |
|
|
|
called pdq to to take to outside engineering. dkl Received a comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 11/12/2002 | | 11/19/2002 | | PASS |
|
|
|
approved per plan and 2000 UPC
|
Routing - PLANNING | 11/8/2002 | | 11/8/2002 | | FAIL |
|
|
|
Applicant will be bringing in a revised elevation sheet. When that arrives please re-route the plans back to me for approval.
|
Plan resubmittals received | | | 11/8/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets A1, A4, A7.5. Routed to John Menard.
|
Routing - PUBLIC WORKS | 11/6/2002 | | 11/8/2002 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 11/8/2002 | | 11/8/2002 | | PASS |
|
|
|
ESC under ESC02-00462
Grading permit Bld02-02276
ESC previously approved.
|
Routing - PLANNING Land Div | 11/5/2002 | | 11/6/2002 | | PASS |
|
|
|
Approved, deed recorded prior to October 30, 1965.
|
Plans ACCEPTED BY PLAN TECH | | | 11/5/2002 | | DONE |
|
|
|
|
Application received | | | 11/5/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/5/2002 | | DONE |
|
|
|
|