Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD02-02713
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8545 W FAIRVIEW
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
(Building 8, Type D Section 2) * A two hour area separation wall will be constructed to divide this building into two separate buildings. * To construct a new 12,270 sq.ft. two story with a basement, 12 unit apartment building. The basement is approximately 4,228 sq.ft. and the first and second floor are approximately 4,021 sq.ft each. All construction is per the approved plans and attached comment list. Work to include on site landscaping and parking lot. Refer to BLD 02-01062 for other side of area separation wall. MJP PC #275-02 DRH02-00005 CUP01-00164
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/7/20041/7/2004 DONE
Permanent occupancy  1/7/2004 DONE
Perm. Occ. Cert. # 9919 issued 1-7-04 to the Aspen Springs Apts.
BLD-Final1/6/20041/6/20041/6/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 1/6/2004 at 9:40:20 AM. Contact: ###-####. OK for Perm Occ. :) 1/6/2004 2:10:36 PM
BLD-Final12/30/200312/30/200312/30/2003PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/30/2003 at 10:57:15 AM. Contact: ###-####.
BLD-Final12/22/200312/22/200312/22/2003PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/22/2003 at 9:51:59 AM. Contact: ###-####.
BLD-Final12/12/200312/15/200312/15/2003ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/12/2003 at 3:58:57 PM. Contact: ###-####.
Code Occupancy Approval  12/15/2003 PASS
FINAL SIGNED OFF
FIRE-Final Inspection12/8/200312/8/200312/8/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/8/2003 at 10:34:50 AM. Contact: ###-####.
BLD-Energy code compliance9/19/20039/19/20039/19/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/19/2003 at 11:27:55 AM. Contact: ###-####.
BLD-Energy code compliance9/18/20039/18/20039/18/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/18/2003 at 8:38:17 AM. Contact: ###-####. check 3rd flr for firestop. 9/18/2003 3:45:03 PM
BLD-Framing/Rough-in9/15/20039/15/20039/15/2003PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/15/2003 at 9:12:53 AM. Contact: ###-####. firestopping 9/15/2003 4:31:17 PM
BLD-Framing/Rough-in8/19/20038/20/20038/20/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/19/2003 at 6:49:19 PM. Contact: ###-####.ok to side. 8/26/2003 9:59:39 AM
BLD-Framing/Rough-in8/13/20038/13/20038/13/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/13/2003 at 7:46:38 AM. Contact: ###-####.shear. 8/15/2003 1:05:00 PM
BLD-Framing/Rough-in8/12/20038/12/20038/12/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/12/2003 at 7:57:09 AM. Contact: ###-####.out of time. 8/12/2003 5:41:29 PM
Inspection Record Card- Bld  4/16/2003  
Print Occupancy Form  4/16/2003  
Inspection Record Card- Bld  4/16/2003  
Print Occupancy Form  4/16/2003  
BLD-Aging Inspection3/21/20033/21/20033/21/2003 CANC
DetailsRuss Owen
work in progress. 3/27/2003 3:17:33 PM
Issue PAID IN FULL permit  12/10/2002 DONE
Inspection Record Card- Bld  11/22/2002 DONE
Print Occupancy Form  11/22/2002 DONE
Plan assigned to (M_P)11/6/2002 11/15/2002 PASS
DetailsMike Phillips
11/15/2002 11:05:58 M_P - activity updated through activity BLDA022 from case BLD02-01062.
Routing - PLAN CHECK11/14/2002 11/15/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/15/2002 DONE
Print Pending Permit.LaserJet4  11/15/2002 DONE
Case Summary (BLD)  11/15/2002 DONE
Routing - FIRE11/14/2002 11/14/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  11/8/2002 DONE
DetailsBill Alexander
Routing - FIRE11/6/2002 11/8/2002 FAIL
DetailsBill Alexander
Hydrant locations have problems with obstructions (carports, parking) and need updated due to FD access modifications. Water supply is questionable due to the location of certificate. Fire loop is found to be 4" and minimum allowed is 6".
Routing - PLAN CHECK11/6/2002 11/6/2002 NH
Routing to fire.
Application received  11/6/2002  
BLD-Framing/Rough-in8/15/20038/15/2003 P 
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/15/2003 at 9:56:15 AM. Contact: ###-####.