Second Notice BLD | 7/7/2006 | 7/7/2006 | 7/7/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 6/2/2006 | 6/2/2006 | 7/7/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 6/2/2006 | 6/2/2006 | 6/2/2006 | | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 3/30/2006 | 3/30/2006 | 3/30/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/30/2006 | 3/30/2006 | 3/30/2006 | P | DONE |
Mike Jordan
|
|
|
|
Permanent Occupancy | | 10/24/2003 | 10/24/2003 | | DONE |
|
|
|
|
BLD-Final | 10/24/2003 | 10/24/2003 | 10/24/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/24/2003 at 7:26:35 AM. Contact: ###-####. OK for Perm Occ. :) 10/24/2003 1:47:14 PM
|
Code Occupancy Approval | 10/24/2003 | 10/23/2003 | 10/23/2003 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF 10/24/2003 12:59:55 PM
|
FIRE-Final Inspection | 10/23/2003 | 10/23/2003 | 10/23/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled, fire alarm finaled 10/23/2003 3:17:07 PM
|
BLD-Framing/Rough-in | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/13/2003 at 7:42:33 AM. Contact: ###-####. need 1 unit complete repairs. 8/15/2003 1:06:13 PM
|
BLD-Framing/Rough-in | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 7:52:43 AM. Contact: ###-####.out of time. 8/12/2003 5:41:47 PM
|
BLD-Framing/Rough-in | 8/11/2003 | 8/11/2003 | 8/11/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 9:57:29 AM. Contact: ###-####.
|
BLD-Other | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:47:37 PM. Contact: ###-####.ok to drywall. 8/12/2003 10:27:04 AM
|
BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:48:19 PM. Contact: ###-####.ok to drywall. 8/12/2003 10:24:16 AM
|
BLD-Framing/Rough-in | 8/5/2003 | 8/6/2003 | 8/6/2003 | P | PART |
Russ Owen
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:24 PMchris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:28 PM
|
BLD-Framing/Rough-in | 8/4/2003 | 8/4/2003 | 8/4/2003 | P | FAIL |
Russ Owen
|
|
|
need prior c/n complete. 8/6/2003 12:50:52 PM
|
BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 | P | FAIL |
Russ Owen
|
|
|
morgan- ###-####morgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:15:58 PMmorgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:16:17 PM
|
BLD-Framing/Rough-in | 7/14/2003 | 7/16/2003 | 7/16/2003 | P | FAIL |
Russ Owen
|
|
|
###-#### vincent
|
Override - Parcel Holds | | | 7/16/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 7/14/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | PART |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. ok to side 6/25/2003 5:20:20 PM
|
BLD-Framing/Rough-in | 6/18/2003 | 6/19/2003 | 6/19/2003 | A | PASS |
Tom Arcoraci
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover ext of building 6/19/2003 9:14:57 AM
|
BLD-Framing/Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | CANC |
Russ Owen
|
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Annette Moore I am still requesting the presents of the structural engineer And contrator has called me and has a time of 10:30 monday.I will meet with him and George..d 6/11/2003 4:25:19 PM 6/11/2003 4:30:07 PM
|
BLD-Framing/Rough-in | 6/5/2003 | 6/6/2003 | 6/6/2003 | P | FAIL |
Russ Owen
|
|
|
darrell shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. There are some new as built details from engineer, which I do not have a copy of and a scaled down floor plan indicating some crossed out hold downs from engineer, I have now found a shear wall at the front that does not have a a means of connection, and due to the plans not indicating hold downs locations clearly enough several have been added. and the new as built details have connections which need to be made. I have posted a c/n for the project engineer to perform on site visit to also include myself and contractor so that he can verify compliance with as bult and plans. This is the 3rd time I have asked this of the contractor. 6/10/2003 12:15:55 PM
|
BLD-Framing/Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 | P | CANC |
Russ Owen
|
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 5/30/2003 | 6/2/2003 | 6/2/2003 | P | FAIL |
Russ Owen
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore. AGAIN NOT ENOUGH INFORMATION THEY HAVE SOME ADDITIONAL PAPER WORK FROM ENGINEER ABOUT ELIMINATION OF SOME HOLD DOWNS BUT SOME ITEMS THROUGH FLOORS ARE NOT POSITIVE CONNECTIONS POSTED C/N AGAIN, WANTED ENGINNER TO INSPECT BUT CONTRACTOR REFUSES. 6/5/2003 10:13:33 AM
|
BLD-Framing/Rough-in | 5/28/2003 | 5/29/2003 | 5/29/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/28/2003 at 7:03:39 PM. Contact: ###-####. canceled per morgan 5/29/03//bam
|
BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 4:49:29 PM. Contact: ###-####. Myself a nd Carl 340 went out and posted a c/n for engineer to perform site visit,as there is not adequate detailing and hold downs have been eliminated and architect had drawn plans, which was stamped by engineer but no specific detailing provided. 5/27/2003 9:55:20 AM
|
BLD-Conference | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PART |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moorewent over construction requirements at the floor area. 5/9/2003 11:19:56 AM
|
Inspection Record Card- Bld | | | 4/16/2003 | | |
|
|
|
|
Print Occupancy Form | | | 4/16/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 3/31/2003 | | |
|
|
|
|
BLD-Foundation | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/20/2003 at 1:17:57 PM. Contact: ###-####.
|
BLD-Foundation | 2/18/2003 | 2/19/2003 | 2/19/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 5:14:54 PM. Contact: ###-####.
|
BLD-Foundation | 2/18/2003 | 2/19/2003 | 2/19/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 5:14:54 PM. Contact: ###-####.
|
BLD-Footing | 2/11/2003 | 2/12/2003 | 2/12/2003 | P | NR |
Russ Owen
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 12/10/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/22/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/22/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 11/6/2002 | | 11/15/2002 | | PASS |
Mike Phillips
|
|
|
11/15/2002 13:46:41 M_P - activity updated through activity BLDA022 from case BLD02-01072.
|
Routing - PLAN CHECK | 11/14/2002 | | 11/15/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/15/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/15/2002 | | DONE |
|
|
|
|
Routing - FIRE | 11/6/2002 | | 11/8/2002 | | FAIL |
Bill Alexander
|
|
|
Hydrant locations have problems with obstructions (carports, parking) and need updated due to FD access modifications. Water supply is questionable due to the location of certificate. Fire loop is found to be 4" and minimum allowed is 6".
|
Plan Review Completed(1st rev) | | | 11/8/2002 | | DONE |
|
|
|
|
Application received | | | 11/6/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 11/6/2002 | | 11/6/2002 | | PEND |
|
|
|
Routing to fire.
|