Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-02761
StatusFinaled
Name FITNESS 19
Site Address 3361 N COLE RD
Project NameCOLE VILLAGE
Customer Number 
ePlanReviewNo
Description
(FITNESS 19)(COLE VILLAGE SHOPPING CENTER) Remodel to a 7,932 sq.ft. space and changing occupancy from retail to an assembly fitness studio per approved plans on file. Work to include miscellaneous interior demolition work, one-hour rated tenant demising wall infill, exterior wall infill, new interior walls, new interior doors and windows, relocating entrance doors, interior finish, new accessible restrooms, new suspended ceiling, fire sprinkler work, plumbing work, mechanical work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. (PC#0716-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/27/2011 DONE
Fee Review-notes11/8/200211/8/20028/10/2004 DONE
First Notice 10/10/200310/10/2003 DONE
Permanent occupancy  10/10/2003 DONE
Perm. Occ. Cert. #9836 issued 10-9-03 to Fitness 19 in Cole Village.
Permanent Occupancy 9/30/20039/30/2003 DONE
Details
BLD-Final9/30/20039/30/20039/30/2003PPASS
DetailsJim Sly
fn - ###-####- doug 9/30/2003 2:46:10 PM OK for Perm occ. 9/30/2003 2:46:53 PM
BLD-Final9/26/20039/29/20039/29/2003ANR
DetailsRuss Owen
Cathy has occ. req. card - please call if approved! Thanks ~ : ) There are no approved plans. talked with tennant will getthem and recall 9/29/2003 7:11:56 PM
FIRE-Final Inspection8/15/20038/15/20038/15/2003PPASS
DetailsTroy Cobbley
Fire alarm system has been finaled. Permanent occupancy is ok for Fitness 19
Additional plans submitted  4/9/2003 PASS
FA plans reviewed and approved under FIR03-00117.
FIRE-Conference3/11/20033/12/20033/12/2003ADONE
DetailsTroy Cobbley
pendant in front of space is still overspaced and the fire alarm plans are still an issue 3/12/2003 9:17:39 AM
FIRE-Conference3/12/20033/12/20033/12/2003PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave millers permission until the fire alarm plans have been approved and the changes made and inspected 3/12/2003 3:49:32 PM
Temporary occupancy  3/12/2003 DONE
Temp. Occ. Cert. #4933 issued 3-12-03 to Fitness 19 in the Cole Village Shopping Center.
Meeting  3/12/2003 DONE
meeting with architect, Joseph Lemay and Peak Alaerm, Steve Larson, to quick preliminary review of plans per Dave Miller's request. Plans do not include all duct detectors and a few other changes necessary but are acceptable for submittal and acceptable for DM to give TOC approval.
BLD-Final3/7/20033/7/20033/7/2003PNR
DetailsTom Arcoraci
PER JIM SLY OKAY FOR FINAL ###-#### needs fire ok 3/7/2003 4:08:04 PM
BLD-Framing/Rough-in3/6/20033/7/20033/7/2003APASS
DetailsJim Sly
###-#### ceiling Ceiling OK. 3/7/2003 10:33:54 AM
FIRE-Final Inspection3/7/20033/7/20033/7/2003PFAIL
DetailsTroy Cobbley
provide EQ bracing and hanger per code in the new tenant space, provide annual inspection for the fire sprinkler system, provide one additional sprinkler pendant near the front exit, provide approved fire alarm plans showing the two new duct smoke detectors supervised by the existing fire alarm system 3/7/2003 4:05:30 PM
Routing - PLAN CHECK3/7/2003 3/7/2003 PASS
Plan Modification approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  3/7/2003 PASS
Receive PAYMENT IN FULL PRINT  3/7/2003 DONE
CHANGE STATUS TO (ISS)  3/7/2003 DONE
ALREADY ISSUED /WAS A PLAN MODIFICATION
Override - Parcel Holds  3/7/2003  
Routing - FIRE3/4/2003 3/7/2003 PASS
Plan Modification 02/14/03.
Plan assigned to (JCB)2/18/2003 3/7/2003 PASS
DetailsJason Blais
3/7/2003 13:18:27 JCB - activity updated through activity BLDA022 from case BLD02-02761.
Override - Parcel Holds  3/7/2003  
Override - Parcel Holds  3/6/2003  
Routing - PLAN CHECK2/25/2003 3/4/2003 FAIL
Plan Modification review sent and faxed to architect. One item needs to be addressed concerning details of new exterior wall infill at former double door openings in West exterior wall. Called architect rep. and he said he would address on a small addendum sheet to attach to plans. Plans routed to Fire Dept. for review. Plan Modification received 02/14/03.
Routing - PLUMBING2/18/2003 2/25/2003 PASS
Plan Modification 02/14/03. WILL REQUIRE PREMISE BACKFLOW PROTECTION AND THERMAL EXPANSION PROTECTION.
Routing - PUBLIC WORKS2/18/2003 2/18/2003 PASS
Plan Modification 02/14/03.
Plan Modification Accepted  2/18/2003  
Plan Modification excepted for the Fitness 19 at Cole Village for the redesign of mirror of the entire project due to plumbing constraints. No additional square footage is added, no exits change, and no additional exterior work.dkl
Application received  2/14/2003 DONE
plan modification
BLD-Framing/Rough-in2/10/20032/10/20032/10/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/10/2003 at 7:06:42 AM. Contact: ###-####.
BLD-Conference2/7/20032/7/20032/7/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/7/2003 at 7:06:35 AM. Contact: ###-####. Talked about change on plans. 2/7/2003 11:07:33 AM
Issue PAID IN FULL permit  1/21/2003 DONE
Plan assigned to (JCB)11/14/2002 12/5/2002 PASS
DetailsJason Blais
12/5/2002 09:14:18 JCB - activity updated through activity BLDA022 from case BLD02-02761.
Routing - PLAN CHECK11/27/2002 12/5/2002 PASS
Plans and permit approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  12/5/2002 PASS
Inspection Record Card- Bld  12/5/2002 DONE
Print Occupancy Form  12/5/2002 DONE
Telephone call  12/5/2002 DONE
permit ready and fees due
Plan resubmittals received  12/4/2002 DONE
Received two copies of revised sheets A-1and A-2. One copy of response letter and one copy of mixed occupancy ratio calc. Routed to Jason B. kmm
Plan Review Completed(1st rev)  11/27/2002 FAIL
Routing - FIRE11/26/2002 11/27/2002 PASS
Plan resubmittals requested  11/26/2002  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK11/18/2002 11/26/2002 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans routed to Fire Dept. for review.
Routing - PUBLIC WORKS11/14/2002 11/18/2002 PASS
Plans ACCEPTED BY PLAN TECH  11/12/2002 DONE
Application received  11/8/2002  
Recd Pcfee & Taken To Pln CK  11/8/2002 DONE