Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-02768
StatusExpired
Name WEST COAST PAPER
Site Address 1050 W RIVER ST
Project NameWEST COAST PAPER
Customer Number 
ePlanReviewNo
Description
(WEST COAST PAPER) To install automatic smoke and heat vents and draft curtains in accordance to fire code for high piled storage, Article 81; section 906 1997 UBC and UBC Standard 15-7; per manufacture's listing and installation details; engineering and approved plans to include attached plan review comments / conditions. Note: This building is fully sprinklered under FIR02-00102 per submitting architect.A "Letter of Completion / Compliance" is required as a condition of this permit. PC#02-722/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/31/20043/31/20043/31/2004 PASS
DetailsDave Hannah
DOC - Permit Expired3/31/20043/31/20043/31/2004APASS
DetailsDave Hannah
Expired by inspector at 3/31/2004 8:12:18 AM
Letter of compliance  10/8/2003 DONE
Letter of Compliance # 24128 issued 10-8-03.
BLD-Final9/17/20039/18/20039/18/2003APASS
DetailsJim Storey
###-#### sid......please note the parcel hold says not to final this without finaling bld00-03496 c/o ok 9/18/2003 10:47:57 AM
Override - Parcel Holds  9/17/2003  
Override - Parcel Holds  9/17/2003  
FIRE-Final Inspection9/8/20039/9/20039/9/2003APASS
DetailsRick Jackson
8 with Sid
FIRE-Final Inspection9/8/20039/8/20039/8/2003PCANC
DetailsRick Jackson
###-#### sid rescheduled for 9/9 9/8/2003 4:08:16 PM
Override - Parcel Holds  9/8/2003  
FIRE-Final Inspection7/10/20037/11/20037/11/2003AFAIL
DetailsRick Jackson
###-#### sid curtain board not draft tight; it isn't installed north to south as shown on plans - installed west to east but still divides the space okay; will leave up to structural inspector if it is okay 7/11/2003 12:53:23 PM
Override - Parcel Holds  7/10/2003  
BLD-Final4/28/20034/28/20034/28/2003PNR
DetailsCarl Dependahl
needs to be finaled at same time as bld00-03496 (###-#### Chris)
Override - Parcel Holds  4/28/2003  
Plan Reviewer's activity  4/11/2003 PASS
Received plan for modification back from Sam Rogers with a revised date on another copy of the original fire code analyst review. I faxed a copy back to the architect and put a copy in the file. I put a copy in the fire and structural inspectors notification box.
Routing - FIRE4/10/2003 4/10/2003 PASS
Routed back to Dan Stuart with copy of original fire code analyst plan review and a new revised date of 4/10/03.
Plan Modification Accepted  4/10/2003 PASS
DetailsSam Rogers
Plans approved with conditions
Additional plans submitted  4/10/2003 DONE
Plans sheet submitted by Glen Walker, Larson Architects, requesting approval of modification changing draft curtain required by fire code for high piled storage from running east / west to running north / south. The areas of each side will remain approximately the same and the heat & smoke vent numbers per side will remain the same. Forwarded to Sam Rogers for review and approval.
BLD-Conference1/15/20031/16/20031/16/2003APASS
DetailsCarl Dependahl
...prior permit WIP...vents not begun. Sundance Co. hasn't called for either insp. 1/16/2003 9:11:33 AM
BLD-Conference1/14/20031/15/20031/15/2003PCANC
DetailsCarl Dependahl
Override - Parcel Holds  1/7/2003  
Issue PAID IN FULL permit  1/7/2003 DONE
(F) Reprint permit  1/7/2003 DONE
Plan assigned to (DRS)11/20/2002 12/31/2002 PASS
DetailsDan Stuart
12/31/2002 12:40:08 DRS - activity updated through activity BLDA022 from case BLD02-02768.
Routing - FIRE12/30/2002 12/31/2002 PASS
Routing - PLAN CHECK12/31/2002 12/31/2002 PASS
Approved as noted and attached plan review comments & conditions.
PLANS/APPL TAKEN TO FRONT DESK  12/31/2002 PASS
To permit desk to issue.
Override - Parcel Holds  12/31/2002  
Inspection Record Card- Bld  12/31/2002 DONE
Telephone call  12/31/2002 DONE
CALLED 12-31-02
Routing - PLAN CHECK12/18/2002 12/30/2002 PEND
Resubmittals inserted into plans. Routing back to fire code analyst for review.
Plan resubmittals received  12/26/2002 DONE
Received two copies of revised sheets A-1, A-2, one copy of cover letter, letter from Pinnacle Eng. and cut sheet from smoke and heat vent manufacture. Routed to Dan S. kmm
Plan Review Completed(1st rev)  12/18/2002 FAIL
Routing - FIRE12/13/2002 12/18/2002 FAIL
fusible link
Plan resubmittals requested  12/13/2002 FAIL
Copy of plan deficiencies faxed and mailed to the architect.
Override - Parcel Holds  12/13/2002  
To obtain copy of permit and case summary for purpose of routing plans to fire code analyst.
Print Pending Permit.LaserJet4  12/13/2002  
Case Summary (BLD)  12/13/2002  
Routing - PLAN CHECK11/20/2002 12/13/2002 FAIL
Plans submitted for review and building permit were incomplete to the point further review could not be done. A copy of the deficiencies were faxed and mailed to the architect, Cornel Larson, for response. The plans are being routed to fire code analyst to complete first initial routing for review process.
Plans ACCEPTED BY PLAN TECH  11/13/2002 DONE
Application received  11/12/2002  
Recd Pcfee & Taken To Pln CK  11/12/2002 DONE
Fee Review-notes11/12/200211/12/2002