Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-02788
StatusFinaled
Name OFFICE OF AIRCRAFT SERVICES
Site Address 300 E MALLARD DR (2ND FLR)
Project NameLAKEPOINTE CENTRE 1
Customer Number 
ePlanReviewNo
Description
(OFFICE OF AIRCRAFT SERVICES - ENTIRE 2ND FLOOR) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To remodel the 2nd floor of an existing 69,000 square foot, 3 story, office building for a new tenant. The 2nd floor has a total floor area of about 21,678 square feet. This tenant will occupy the entire 2nd floor office area (about 18,800 square feet). Work is to include interior nonbearing walls, interior doors, interior windows, and repairs to the suspended ceiling system all per the approved drawings and plan review conditions of file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/14/20038/14/20038/10/2004 DONE
Permanent Occupancy 2/18/20032/18/2003 DONE
Details
BLD-Final2/17/20032/18/20032/18/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/17/2003 at 11:09:03 AM. Contact: ###-####.final ok per aproved plan. 2/18/2003 2:11:09 PM
Permanent occupancy  2/18/2003 DONE
Perm. Occ. Cert. #9560 issued 2-18-03 to the Office of Aircraft Services on the 2nd floor of the Lakpeoint Centre I bldg.
FIRE-Final Inspection2/14/20032/14/20032/14/2003PPASS
DetailsRick Jackson
BLD-Wall cover1/27/20031/28/20031/28/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/27/2003 at 14:26:13. Contact: ###-####.framing ok per plan. 1/28/2003 9:21:58 AM
Print Occupancy Form  1/9/2003 DONE
Case Summary (BLD)  1/6/2003  
BLD-Framing/Rough-in12/26/200212/27/200212/27/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2002 at 15:12:43. Contact: ###-####.
Inspection Record Card- Bld  12/23/2002 DONE
Telephone call  12/23/2002 DONE
CALLED 12-23-02
Issue PAID IN FULL permit  12/23/2002 DONE
Plan assigned to (CJW)11/20/2002 12/20/2002 PASS
DetailsCarl Westfall
12/20/2002 14:20:33 CJW - activity updated through activity BLDA022 from case BLD02-02788.
Routing - FIRE12/17/2002 12/20/2002 PASS
Plan Review Completed(1st rev)  12/20/2002 PASS
Routing - PLAN CHECK12/20/2002 12/20/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/20/2002 PASS
Routing - PLAN CHECK11/20/2002 12/17/2002 PASS
At the request of the architect, the review of this project was delayed. Another one of his projects was reviewed in this one's time frame. UBC plan review started December 13, 2002 and finished December 17, 2002. The drawings were approved with conditions. See the conditions list.
First Notice11/14/200211/14/200211/14/2002 DONE
Plans ACCEPTED BY PLAN TECH  11/14/2002  
Application received  11/14/2002  
Recd Pcfee & Taken To Pln CK  11/14/2002 DONE