Telephone call | | | 8/13/2003 | | |
|
|
|
08/13/03 Called Rory at 1:26 p.m. with Hammersmark Building requesting Final Certs. He told me he would get it right over.
(Total initial project value $24,000 with no ele, plm, mech. However valuation on electrical permit for $34,500 and final cert for mech for $11,339 totaling $45,839. $45,839-$24,000=$21,839)
|
First Notice | | 6/25/2003 | 6/25/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/25/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9707 issued 6-25-03 to Tablerock Printing Co.
|
BLD-Final | 6/24/2003 | 6/24/2003 | 6/24/2003 | P | PASS |
Carl Dependahl
|
|
|
rory; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | FAIL |
Carl Dependahl
|
|
|
rory; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, need firestops installed per c/n 6/18/2003 12:13:53 PM
|
BLD-Final | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | FAIL |
Carl Dependahl
|
|
|
###-#### rory...firestop 2hr wall penetrations, protect hvac ducts at ramp side of 2hr wall 6/16/2003 4:25:42 PM
|
BLD-Final | 6/13/2003 | 6/13/2003 | 6/16/2003 | P | CANC |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | CANC |
Tom Arcoraci
|
|
|
###-#### rory 6/13/2003 8:01:16 AM needs fire 6/13/2003 8:01:26 AM
|
FIRE-Final Inspection | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | PASS |
Rick Jackson
|
|
|
|
Print Occupancy Form | | | 6/13/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/13/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | FAIL |
Rick Jackson
|
|
|
RORY; Phone #: ###-#### Internet Inspection Request from: Darla Downs need alarm plans as duct detectors were installed without plans by Peak 3/13/2003 10:15:18 AM
|
FIRE-Final Inspection | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | FAIL |
Rick Jackson
|
|
|
RICK; Phone #: ###-#### Internet Inspection Request from: Darla Downs need exit sign above new corridor for second exit; need hazmat/flammable liquid list; hardwire all equipment currently using extension cords; need alarm plans submitted for duct detectors; "Door to remain...." sign at main exit 2/5/2003 4:08:36 PM
|
FIRE-Conference | 1/31/2003 | 1/31/2003 | 1/31/2003 | A | DONE |
Troy Cobbley
|
|
|
I spoke with the contractor, Rick, and told him that the sprinkler riser needs to have its annual inspection as well as the fire sprinkler monitoring system. Also there are new duct smoke detectors on the new hvac system and that they would need to be connected to the existing fire alarm panel and that this work would require approved drawings and permits
|
Plan assigned to (R_H) | 11/21/2002 | | 1/27/2003 | | DONE |
|
|
|
< $25,000
|
Case Summary (BLD) | | | 1/13/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 1/8/2003 | 1/8/2003 | 1/8/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### rory, c/n issued, clarify or install corridor & occ. separation wall to deck, get sprinkler r/i. OK to cover unaffected int partitions. 1/8/2003 5:33:43 PM
|
Inspection Record Card- Bld | | | 1/6/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/6/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/6/2003 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Issue PAID IN FULL permit | | | 1/6/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/3/2003 | | DONE |
|
|
|
Received two copies of revised sheets A001 of 2, A101 of 2 and one copy of letter. Routed to Ron Hill. kmm
|
Routing - FIRE | 12/17/2002 | | 12/19/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/19/2002 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/19/2002 | | 12/19/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/22/2002 | | 12/17/2002 | | FAIL |
|
|
|
Faxed requirements to the architect on 12/17/02 Routed plans to the fire department for review on 12/17/02, .
|
Routing - PUBLIC WORKS | 11/21/2002 | | 11/22/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/19/2002 | | DONE |
|
|
|
|
Application received | | | 11/18/2002 | | |
|
|
|
|