(LE CAFE DE PARIS) To remodel an existing 830 sq.ft. restaurant by expanding into adjacent area for a total of 1,840 sq.ft. per approved plans. Work to include, removing portion of a nonbearing wall to create a 8'6" cased opening into 391 sq ft adjacent space for new seating area, to remodel the existing kitchen area that was previously used by Quiznos, to include relocation of three compartment sinks, installation of new cooking appliances, installation of new Type-1 hood system, grease duct to be wraped with Firemaster duct wrap ER-4975 & will be installed in an existing shaft, Miscelaneous related interior finish's. A new Certification of Occupancy will be required to reflect the additional area and occupant load. NOTE: This building is fully fire sprinklered for one hour fire-resistive substitution. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (pc#736-02) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes11/18/200211/18/20028/10/2004 DONE
First Notice 1/15/20041/15/2004 DONE
BLD-Final12/22/200312/23/200312/23/2003APASS
DetailsDave Hannah
Matthew ; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for perm occ 12/23/2003 10:48:37 AM
Permanent Occupancy 12/23/200312/23/2003 DONE
Details
Permanent occupancy  12/23/2003  
Perm. Occ. Cert. # 9908 issued 12-23-03 to Le Cafe De Paris.
FIRE-Final Inspection12/16/200312/17/200312/17/2003PPASS
DetailsRick Jackson
mathew; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
(F) Reprint permit  12/4/2003 DONE
BLD-Final9/25/20039/26/20039/26/2003APART
DetailsDave Hannah
mathue; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for temp occ ok to perm occ ater fire 9/26/2003 11:06:07 AM
Temporary occupancy  9/26/2003 DONE
Temp. Occ. Cert. #5002 issued 9-26-03 to Le Cafe De Paris.
FIRE-Final Inspection9/25/20039/25/20039/25/2003PPART
DetailsRick Jackson
per approval from Dave Miller a temp occupancy is approved for fire/life safety pending approval of fire alarm plans 9/25/2003 4:09:15 PM
BLD-Framing/Rough-in9/4/20039/5/20039/5/2003APASS
DetailsDave Hannah
mathew; Phone #: ###-#### Internet Inspection Request from: Marc Lileks 9/5/2003 11:14:17 AM
BLD-Framing/Rough-in8/29/20039/1/20039/1/2003APART
DetailsDave Hannah
1hr grease duct ok to close 9/2/2003 10:11:34 AM
BLD-Framing/Rough-in8/29/20038/29/20038/29/2003PCANC
DetailsDave Hannah
###-#### mathew out of time 8/29/2003 7:12:03 PM
BLD-Conference4/23/20034/24/20034/24/2003PPASS
DetailsCarl Dependahl
al & Steve w/ Total systems; re grease duct discharge...submit request for variance, prior plans show discharge in same gen'l area...(w/i 5' of p.l...per UMC507.11) 4/24/2003 3:29:10 PM
BLD-Conference4/23/20034/23/20034/23/2003PPART
DetailsCarl Dependahl
###-#### ###-#### STEVE, reviewed UMC 507.11, will advise re location of discharge relative to prop.line ... need plan onsite. 4/23/2003 5:01:00 PM
Issue PAID IN FULL permit  4/2/2003  
Telephone call  3/27/2003 DONE
left mess that permit is ready for bruce poe
Inspection Record Card- Bld  12/13/2002 DONE
Print Occupancy Form  12/13/2002 DONE
Telephone call  12/13/2002 DONE
PERMIT READY AND FEES DUE
Plan resubmittals received  12/12/2002 DONE
Received two copies of revised sheets A1.0, M1.1, M2.1, one copy of ICBP report-4975 and one copy of through-penetration firestop system NO.W-L7041. Routed to Ron Hill. kmm
Plan Review Completed(1st rev)  12/12/2002 DONE
Routing - PLAN CHECK12/12/2002 12/12/2002 PASS
Case Summary (BLD)  12/12/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/12/2002 DONE
Plan assigned to (R_H)11/22/2002 12/12/2002 PASS
Details
12/12/2002 16:25:52 RMH - activity updated through activity BLDA022 from case BLD02-02823.
Routing - FIRE12/6/2002 12/12/2002 PASS
DetailsBill Alexander
Routing - PLAN CHECK11/27/2002 12/6/2002 FAIL
Plan Reviewer's activity  12/6/2002 FAIL
Faxed and Mailed requirements to the architect Bruce Poe, 12/05/02, Routed plans to the fire deparment same day.
Case Summary (BLD)  12/6/2002 DONE
Routing - PLANNING11/26/2002 11/27/2002 PASS
Jeff Neberman.
Routing - PLUMBING11/22/2002 11/26/2002 PASS
kitchen waste to rout to interceptor per public works review, additional cross connection protection may be required.
Routing - PUBLIC WORKS11/22/2002 11/22/2002 PASS
Application received  11/18/2002  
Recd Pcfee & Taken To Pln CK  11/18/2002 DONE