Permit Information
Permit NumberBLD02-02853
StatusFinaled
Name GIVENS PURSLEY LLP
Site Address 601 W BANNOCK ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(GIVENS PURSLEY LLP) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To remodel all 3 levels of an existing 34,500 square foot 3 story office building. Work is to include 6 restrooms accessible to the disabled, interior nonbearing walls, floor infills, wall infills, and suspended ceilings all per approved drawings, engineering, and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes11/20/200211/20/20028/10/2004 DONE
First Notice 2/10/20042/10/2004 DONE
Permanent occupancy  2/9/2004 DONE
Perm. Occ. Cert. # 9983 issued 2-9-04 to Givens Pursley, LLP.
Permanent Occupancy 2/6/20042/6/2004 DONE
Details
BLD-Final2/6/20042/6/20042/6/2004PPASS
DetailsDave Hannah
kevin; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for prem occ 2/6/2004 2:16:13 PM
FIRE-Final Inspection1/29/20041/30/20041/30/2004PPASS
DetailsRick Jackson
kevin; Phone #: ###-#### Internet Inspection Request from: Annette Moore fire/life safety okay 1/30/2004 9:37:36 AM
FIRE-Supply Line Hydro1/29/20041/30/20041/30/2004PPASS
DetailsRick Jackson
kevin; Phone #: ###-#### Internet Inspection Request from: Annette Moore final okay 1/30/2004 9:31:40 AM
BLD-Final1/30/20041/30/20041/30/2004PCANC
DetailsDave Hannah
kevin ; Phone #: ###-#### Internet Inspection Request from: Annette Moore--not ready yet
FIRE-Final Inspection1/23/20041/23/20041/23/2004AFAIL
DetailsRick Jackson
need exit signs as shown on plans for second floor; repair exit sign on second floor at SW exit stair (needs battery backup); need occupant load sign in room 139; lever hardware on stair/exit doors; clear stairs of materials; smoke seals on stair doors;eed fire extinguishers throughout; need signs on riser room and FACP room doors 1/23/2004 9:03:19 AM
BLD-Final12/22/200312/22/200312/22/2003PPART
DetailsDave Hannah
partial occ- larry ###-#### 3rd floor north half ok to move into 12/22/2003 3:39:35 PM
FIRE-Final Inspection12/22/200312/22/200312/22/2003PNR
DetailsRick Jackson
will need to verify emergency lighting to occupy the north half of the 3rd floor as part of phasing this project 12/22/2003 2:59:55 PM
FIRE-Final Inspection12/8/200312/8/200312/8/2003PPART
DetailsRick Jackson
###-#### larry phased project: okay to occupy the second floor on the north side 12/8/2003 2:48:48 PM
FIRE-Conference12/5/200312/5/200312/5/2003APART
DetailsRick Jackson
met with Larry and the need for emergency lights on the second floor north side 12/5/2003 10:53:30 AM
BLD-Conference11/25/200311/26/200311/26/2003ADONE
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference11/11/200311/12/200311/12/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/11/2003 at 10:54:01 AM. Contact: ###-####.
BLD-Conference11/12/200311/12/200311/12/2003PDONE
DetailsDave Hannah
###-#### larry talked about location of smoke curtions and stair risers 11/12/2003 2:16:49 PM
BLD-Wall cover11/6/200311/7/200311/6/2003PCANC
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final10/31/200311/3/200311/3/2003ANR
DetailsDave Hannah
Larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Conference11/3/200311/3/200311/3/2003APART
DetailsDave Hannah
draft stops between sec and third floor not needed becouse of being fully fire sprinklerd
BLD-Conference10/28/200310/29/200310/29/2003APART
DetailsDave Hannah
Larry//after 8:30; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes temp glass for smoke sheilds 10/29/2003 1:21:46 AM
FIRE-Conference10/16/200310/17/200310/17/2003PPART
DetailsRick Jackson
colyn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore phased project and okay to occupy the north side of the first floor; stairways to remain clear of debris, etc 10/17/2003 4:02:21 PM
BLD-Framing/Rough-in10/9/200310/9/200310/9/2003PPART
DetailsDave Hannah
larry celing; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to drop in pannels 10/9/2003 2:27:44 PM
BLD-Framing/Rough-in9/26/20039/26/20039/26/2003PPART
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Darla Downs under floor space bathroom filled solid with insulation 9/26/2003 2:19:07 PM
BLD-Conference9/19/20039/19/20039/19/2003PDONE
DetailsDave Hannah
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Wall cover8/21/20038/22/20038/22/2003APASS
DetailsTom Arcoraci
larry; Phone #: ###-#### Internet Inspection Request from: Marc Lileks discussed some hand rail issues ok for short ext at some locations 8/22/2003 10:03:07 AM
BLD-Framing/Rough-in8/20/20038/21/20038/21/2003APART
DetailsCarl Dependahl
larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover 1st fl, dampers installed at shaft. 8/21/2003 2:37:45 PM
BLD-Framing/Rough-in8/1/20038/4/20038/4/2003APART
DetailsCarl Dependahl
###-####...panel box at rest room ok, if ok w/ elec insp....existing wall....file storage floor ok to cover 8/4/2003 11:16:03 AM
BLD-Conference7/30/20037/31/20037/31/2003APASS
DetailsCarl Dependahl
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore..install draft curtains, 18' or to 7' a.f.f. 7/31/2003 5:54:02 PM
BLD-Conference7/29/20037/30/20037/30/2003APASS
DetailsCarl Dependahl
###-#### kirby ...need fire dampers at floor lines at chase; install per listing. 7/30/2003 2:45:31 PM
BLD-Footing7/15/20037/15/20037/15/2003PPART
DetailsCarl Dependahl
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore isolated col ftgs at north 1/2 & strip ftgs at south 1/2 ok... 7/15/2003 3:53:25 PM
BLD-Conference7/15/20037/15/20037/15/2003PPASS
DetailsCarl Dependahl
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...need spec insp for welds; clarify smoke curtains... 7/15/2003 3:54:22 PM
Inspection Record Card- Bld  7/11/2003  
Print Occupancy Form  7/11/2003 DONE
Telephone call  7/11/2003 DONE
left mess that permit is ready
Issue PAID IN FULL permit  7/11/2003 DONE
Plan assigned to (CJW)11/22/2002 7/8/2003 PASS
DetailsCarl Westfall
7/8/2003 08:48:50 CJW - activity updated through activity BLDA022 from case BLD02-02853.
PLANS/APPL TAKEN TO FRONT DESK  7/8/2003 PASS
Routing - PLAN CHECK12/16/2002 7/7/2003 PASS
(1-17-03) Did the resubmittal review. Was lacking some information. Called Richard Smith to let him know what was needed. (5-15-03) Reviewed April 23, 2003 resubmittal. It was not complete. Sent an E-mail to Michael (Mick) McCullough asking for additional information. (7-7-03) Drawings approved after resubmittal review.
Plan resubmittals received  6/26/2003 DONE
Two copies of response letter with a request for change of address, two copies of 1S-1.0, 2S-1.0, 3S-1.0, 4S-1.0, S-2.0, S-2.1, O1P-2.0, O1P-3.0, M-1, M-2, M-3, M-4, E-3.0, E-3.2, E-3.3, E3.4, E-5.0, and taken to Carl
Plan resubmittals received  6/3/2003 DONE
Received two copies of stamped originals of sheet A-6.4, one cover letter and two copies of response letter. Routed to Carl W. kmm
Plan resubmittals received  4/23/2003 DONE
Received two copies of revised sheet 01A-1.1, 01A-3.1, 02A-0.1, 02A-1.1, 02A-2.1, 02A-3.1, 02A-4.1, 03A-0.1, 03A-1.1, 03A-2.1, 03A-3.1, 03A-4.1, A-6.1, A-6.2, A-7.4, A-7.5, A-8.2. Routed to Carl W. kmm
Plan resubmittals received  1/14/2003 DONE
Received one copy of revised sheets 02A-1.1, A-6.1, A-6.3, A-6.4, A-7.3, response letter. Routed to Carl W. kmm
Routing - FIRE12/13/2002 12/16/2002 PASS
Routing - PLUMBING12/16/2002 12/16/2002 PASS
1. may require premise backflow protecdtion and expansion protection. 2. ice makers may require backflow protection.
Plan Review Completed(1st rev)  12/16/2002 DONE
Routing - PLAN CHECK12/3/2002 12/13/2002  
Failed first plan review. UBC plan review started December 9, 2002 and finished December 13, 2002. A response from the architect was required. See the conditions list.
Routing - PLANNING12/2/2002 12/3/2002 PASS
Approved.
Routing - PUBLIC WORKS11/22/2002 12/2/2002 PASS
Plans ACCEPTED BY PLAN TECH  11/21/2002 DONE
Application received  11/20/2002  
Recd Pcfee & Taken To Pln CK  11/20/2002 DONE