Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD02-02863
StatusFinaled
Name BOISE HOSPITALITY GROUP LLC
Site Address 2906 S VISTA AVE
Project NameComfort Suites
Customer Number 
ePlanReviewNo
Description
To construct a new, 51,500 sq.ft., three-story, 83 rooms hotel, with confrence room, covered Porte Cochere and area for future indoor swimming pool. NOTE: This building is fully fire sprinklered for area increase. All construction per the approved plans and attached comment. This permit does not include the construction of the indoor swimming pool and spa. PC#745-02 DRH02-00146 CUP02-00098
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  5/23/2016 DONE
Fee Review-notes11/21/200211/21/20028/10/2004 DONE
First Notice 9/30/20039/30/2003 DONE
Permanent occupancy  9/30/2003 DONE
Perm. Occ. Cert. #9825 issued 9-30-03 to the Comfort Suites.
Permanent Occupancy 9/29/20039/29/2003 DONE
Details
BLD-Final9/26/20039/29/20039/29/2003APASS
DetailsJim Storey
harvey; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for co. 9/29/2003 9:26:31 AM
FIRE-Final Inspection9/17/20039/17/20039/17/2003PPASS
DetailsRick Jackson
BLD-Final8/27/20038/28/20038/28/2003APART
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Marc Lileks ok pending fire. 8/28/2003 2:31:45 PM
BLD-Final8/27/20038/28/20038/28/2003ACANC
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Final8/27/20038/28/20038/28/2003APART
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Marc Lileks ok pending fire. 8/28/2003 2:31:45 PM
BLD-Final8/27/20038/28/20038/28/2003APART
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Marc Lileks ok pending fire. 8/28/2003 2:31:45 PM
FIRE-Final Inspection8/27/20038/28/20038/28/2003APART
DetailsRick Jackson
temp occupancy is approved per Dave Miller for fire/life safety pending Simplex providing fire alarm as builts and map of initiating devices 8/28/2003 9:00:21 AM
BLD-Final8/27/20038/28/20038/28/2003ACANC
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Final8/27/20038/28/20038/28/2003ACANC
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
Case Summary (BLD)  8/28/2003  
Temporary occupancy  8/28/2003 DONE
Temp. Occ. Cert. #4990 issued 8-28-03 to VComfort Suites.
BLD-Final8/26/20038/27/20038/27/2003PNR
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
FIRE-Final Inspection8/19/20038/22/20038/22/2003PNR
DetailsRick Jackson
julio; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per telecon with Julio and Mark of Simplex this will be rescheduled when the 100 % alarm testing is completede and they are ready for a walk through 8/22/2003 3:04:50 PM
BLD-Final8/20/20038/22/20038/22/2003PNR
DetailsJim Storey
JULIO FOR TEMP OCC; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Final8/19/20038/21/20038/21/2003PNR
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in8/20/20038/21/20038/21/2003PPASS
DetailsJim Storey
JULIO CEILING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Code Occupancy Approval8/20/20038/20/20038/20/2003PPASS
DetailsWm. Michael Meloy
Compliance met. 8/20/2003 5:06:03 PM
BLD-Other8/19/20038/20/20038/20/2003AFAIL
DetailsJim Storey
fire stop all floors 8/20/2003 3:14:39 PM
PubWorks Occupancy Approval8/19/20038/19/20038/19/2003 DONE
Drainage project complete, signed permanent occupancy 8/19/03. S.Landaluce
BLD-Framing/Rough-in8/19/20038/19/20038/19/2003PNR
DetailsJim Storey
JULIO CELING INSPECTION; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Final8/19/20038/19/20038/19/2003PNR
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Conference8/18/20038/18/20038/18/2003PPART
DetailsRick Jackson
met with Julio about requirements for the final inspection; saw smoke damper on 3rd floor not closed all the way; elevator won't have state sign off until Friday; fire alarm panel wasn't ready and the room sounder bases aren't temporal tone per Mark of Simplex; mag locks on doors aren't tied into fire alarm; exit sign weren't installed on first floor 8/18/2003 3:22:09 PM
BLD-Conference8/14/20038/15/20038/15/2003APART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip 1st floor 8/15/2003 9:04:33 AM
BLD-Conference8/13/20038/14/20038/14/2003ACANC
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie out of time 8/14/2003 5:25:24 PM
BLD-Framing/Rough-in8/7/20038/8/20038/8/2003APASS
DetailsTom Arcoraci
julio ceiling inspection; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference7/29/20037/30/20037/30/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/29/2003 at 5:23:36 PM. Contact: ###-####.third floor ceilling ok. 7/30/2003 4:03:34 PM
BLD-Framing/Rough-in7/22/20037/23/20037/23/2003APART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Annette Moore conf. ok 7/23/2003 9:59:50 AM
BLD-Framing/Rough-in7/21/20037/21/20037/21/2003PPART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fur dsowns ok.lobby ceilling ok. 7/21/2003 4:28:48 PM
BLD-Wall cover7/14/20037/14/20037/14/2003APASS
DetailsJim Storey
rooms first floor bathroom hard ceillings ok for cover.
BLD-Framing/Rough-in7/11/20037/11/20037/11/2003PFAIL
DetailsJim Storey
###-#### julio
BLD-Framing/Rough-in7/9/20037/10/20037/10/2003AFAIL
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/7/20037/8/20037/8/2003ANR
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in7/1/20037/2/20037/2/2003PPART
DetailsTom Arcoraci
###-#### ok to cover 2nd floor corr hard lid ok to cover entry at drive thru 7/2/2003 2:02:45 PM
BLD-Framing/Rough-in6/18/20036/19/20036/19/2003ANR
DetailsJim Storey
###-####
BLD-Framing/Rough-in6/10/20036/11/20036/11/2003APASS
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2nd floor ok rooms 6/11/2003 8:33:41 AM
BLD-Framing/Rough-in6/4/20036/5/20036/5/2003PPART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore drop ceillings east end 2 nd floor. ok 6/5/2003 3:08:23 PM
BLD-Framing/Rough-in6/3/20036/4/20036/4/2003APART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore east end of 2 nd floor fire chalhing and pre rock ok pending trap patch for rated ceilling to be addressed at fur down framing insp.. 6/4/2003 9:08:28 AM
BLD-Framing/Rough-in5/29/20035/30/20035/30/2003APART
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Annette Moore fire stopping on first floor bath room plum and chases ok. 5/30/2003 10:08:34 AM
BLD-Framing/Rough-in5/27/20035/28/20035/28/2003APART
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 3 RD AND 2 ND OK 5/28/2003 12:06:42 PM
BLD-Framing/Rough-in5/21/20035/22/20035/22/2003PNR
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in5/20/20035/21/20035/21/2003APART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Annette Moore west 3 rd floor 1/2 ok. 5/21/2003 11:09:28 AM
BLD-Framing/Rough-in5/19/20035/20/20035/20/2003PPART
DetailsJim Storey
###-#### julio ###-#### julio framing c/n made ok pending letter from truss designer for shaft truss cut outs. 5/20/2003 3:43:27 PM need plumbing firestopping at floors and top plates. 5/20/2003 3:44:28 PM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003APART
DetailsJim Storey
JUILIO; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip 3 rd floor. 5/19/2003 12:13:44 PM
BLD-Framing/Rough-in5/14/20035/15/20035/15/2003PFAIL
DetailsJim Sly
julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N Trusses only..... Lat bracing misc trusses, hanger nailing, Need eng for truss fix (several), missing eng........5/15/2003 3:59:46 PM 5/15/2003 4:09:10 PM
BLD-Framing/Rough-in5/9/20035/12/20035/12/2003APART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore truss clips ok 3 rd floor. 5/12/2003 10:45:02 AM
BLD-Framing/Rough-in5/7/20035/8/20035/8/2003AFAIL
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Darla Downs engineer to supply glb calc. to justify change in span at entry as well as defltion for stuco finsh/ roof trussess can not penatrate shafts at roof ceilling assembly/ can light boxes must maintane 2 layer ceilling protection./ provide fire place venting listing for horizontal venting distance . 5/8/2003 10:45:55 AM
BLD-Framing/Rough-in4/30/20035/1/20035/1/2003APART
DetailsJim Storey
Julio; Phone #: ###-#### Internet Inspection Request from: Barbara Moore conf on stairs. 5/1/2003 12:10:57 PM
BLD-Framing/Rough-in4/29/20034/30/20034/30/2003APART
DetailsJim Storey
###-#### ###-#### 2nd floor coridor ok for lid gyp. 4/30/2003 9:25:36 AM
BLD-Framing/Rough-in4/28/20034/29/20034/29/2003ACANC
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in4/22/20034/23/20034/23/2003PPART
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Annette Moore stairs resub mital for lobby aproved. vent shaft proto type ok to proceed. 4/23/2003 3:50:57 PM
BLD-Other4/17/20034/18/20034/18/2003APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Annette Moore 1 floor coridor ok for pre rock. 4/18/2003 11:06:56 AM
BLD-Framing/Rough-in4/9/20034/10/20034/10/2003APART
DetailsJim Storey
###-#### conf. 4/10/2003 3:37:56 PM
BLD-Framing/Rough-in4/2/20034/2/20034/2/2003PPART
DetailsJim Storey
julio--shear--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie lower sheer ok 4/2/2003 3:59:14 PM
BLD-Framing/Rough-in3/31/20033/31/20033/31/2003PFAIL
DetailsJim Storey
julio; Phone #: ###-#### Internet Inspection Request from: Annette Moore nailling not complet. 3/31/2003 4:41:25 PM
BLD-Framing/Rough-in3/18/20033/19/20033/19/2003ANR
DetailsJim Storey
JULIO; Phone #: ###-#### Internet Inspection Request from: Darla Downs conf only for shaft and plm configruation. 3/19/2003 9:09:56 AM
BLD-Framing/Rough-in3/14/20033/14/20033/14/2003PPART
DetailsJim Storey
hulio; Phone #: ###-#### Internet Inspection Request from: Annette Moore sheer nailling ok fo 1st and 2nd floors east 1/3 of bldg. interior sil plates ab not instaled at this time. 3/14/2003 2:14:11 PM
BLD-Framing/Rough-in3/12/20033/12/20033/12/2003PFAIL
DetailsJim Storey
JULIO SHEAR WALL; Phone #: ###-#### Internet Inspection Request from: Darla Downs nailling not complet. 3/12/2003 3:43:48 PM
BLD-Conference3/6/20033/7/20033/7/2003APASS
DetailsJim Storey
hulio; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing2/18/20032/19/20032/19/2003PPART
DetailsJim Storey
###-#### placed with si 2/19/2003 4:35:50 PM
BLD-Footing1/30/20032/5/20032/5/2003PPART
DetailsJim Storey
###-#### placed with special insp. 2/5/2003 4:06:48 PM
BLD-Footing1/30/20032/4/20032/4/2003PPART
DetailsJim Storey
###-#### ###-#### wip special insp pending. 2/4/2003 2:31:33 PM
BLD-Footing1/30/20032/3/20032/3/2003PPART
DetailsJim Storey
###-#### ###-#### placed with special insp. 2/3/2003 5:12:07 PM
BLD-Footing1/30/20031/31/20031/31/2003PPART
DetailsJim Storey
###-#### ###-####placed with special insp. pending report. 1/31/2003 4:27:07 PM
BLD-Footing1/29/20031/30/20031/30/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/29/2003 at 12:23:46. Contact: ###-####.placed with s/i mti report pending. 1/30/2003 5:05:42 PM
BLD-Footing1/28/20031/29/20031/29/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/28/2003 at 12:18:21. Contact: .placed with special insp. mit. 1/29/2003 3:54:51 PM
(F) Reprint permit  1/17/2003  
Routing - PLAN CHECK1/15/2003 1/16/2003 PASS
Plan Reviewer's activity  1/16/2003 DONE
Parcel tag removed for illegal subdivision. Parcel created prior to 1965
PLANS/APPL TAKEN TO FRONT DESK  1/16/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/16/2003 DONE
Print Pending Permit.LaserJet4  1/16/2003 DONE
Case Summary (BLD)  1/16/2003 DONE
Case Summary (BLD)  1/16/2003 DONE
Print permit w/o conditions  1/16/2003  
Inspection Record Card- Bld  1/16/2003 DONE
Print Occupancy Form  1/16/2003 DONE
Issue PAID IN FULL permit  1/16/2003 DONE
Plan assigned to (M_P)11/25/2002 1/16/2003 PASS
DetailsMike Phillips
1/16/2003 13:38:41 M_P - activity updated through activity BLDA022 from case BLD02-02863.
Routing - FIRE1/13/2003 1/15/2003 PASS
Plan resubmittals received  1/15/2003 DONE
Received two copies of revised sheets A1.1, A1.2, A1.3, A1.4, M1-1, M1-2, M1-3, M1-4, M2-1, M2-2, M3-1, M3-2, P1, P2, P3, P4, P5, P6, P7.1, P7.2. Routed to Mike P.
Routing - PLAN CHECK1/10/2003 1/13/2003  
Routing to Fire.
Plan resubmittals received  1/13/2003 DONE
Received two copies of revised sheets C1-0, C1-1, C1-3, C1-4, C1-5, C1-6, C1-7, C1-8, C1-9, ,C1-10. Routed to Mike P. kmm
Routing - FIRE1/9/2003 1/10/2003 FAIL
NO RESPONSE TO FIRE ISSUES
Plan resubmittals received  1/10/2003 DONE
Plan sheets C1-3, C1-4, C1-5. C1-7, a letter from CDH dated 1/8/2003, a letter from ACHD dated 1/10/2003, copy of ACHD impact fee receipt dated 1/10/2003 received and forwarded to Mike Phillips.
Routing - PLAN CHECK1/7/2003 1/9/2003  
Routing to Fire.
Routing - PLANNING1/8/2003 1/8/2003 PASS
approved by SMS / KG
Routing - PLANNING1/3/2003 1/7/2003 FAIL
Still working on site plan details with the applicant. Trying to remove compact parking stalls from the entry and awaiting and Avigation Easement.
Plan resubmittals received  1/7/2003 DONE
Received two copies of revised sheets E1.0, E2.1, E2.2, E2.3, E3.1, E3.2, E3.3, E3.4, E4.1, E4.2, E4.3, E5.1, E5.2, E5.3, E6.1, E6.2, E6.3, E7.1, LS1.1, A1.1, A1.2, A1.3, A3.1, A3.2, A4.1, A4.2, A5.1, A5.2, A5.4, A6.2, A6.7, A7.1, A7.2, A7.3, A7.4, A7.6, A7.7, FIVE COPIES OF S1.1, S1.2, S1.3, S2.1, S2.2, S2.3, S2.4, S2.5. Cover letters, response letters, cleaning chemical letters, EIFS letters. Routed to Mike P. kmm
Override - Parcel Holds  1/3/2003  
Routing - PLANNING Land Div1/3/2003 1/3/2003 PASS
Parcel created prior to 10/30/65.
Routing - PUBLIC WORKS12/27/2002 12/30/2002 PASS
Plan Review Completed(1st rev)  12/27/2002 FAIL
Routing - FIRE12/26/2002 12/27/2002 FAIL
discussed issues with architect--12/27
Routing - PLAN CHECK12/16/2002 12/26/2002 FAIL
Plan review completed, sent correction report to architect requesting additional information for further review.
Override - Parcel Holds  12/26/2002  
Print permit w/o conditions  12/26/2002  
Plan resubmittals received  12/23/2002 DONE
Received two copies of revised LS1.1, deed of trust and one copy of C1-8. Routed to Mike P. kmm
Routing - PLUMBING12/13/2002 12/16/2002 PASS
Plan resubmittals received  12/16/2002 DONE
Received revised certificate of Value. Routed to Mike Phillips.
Routing - PLANNING12/9/2002 12/12/2002 FAIL
5 items/changes required. Sarah Schafer - DRH02-146, Karen Gallagher CUP02-98
Routing Off Site - STRUCTURAL11/22/2002 12/11/2002 PASS
Comment required no further review needed.
Routing - Erosion and Sediment12/5/2002 12/9/2002 PASS
ESC approved with conditions attached to plans.
Plan resubmittals received  12/5/2002 FAIL
Received one copy of C1-8 sheet. Two copies are required. contacted Design Resources of this need. kmm
Routing - PUBLIC WORKS11/26/2002 12/5/2002 FAIL
Requires street light plan per Bill Colson. kmm
Routing - PLANNING Land Div11/22/2002 11/26/2002 FAIL
Need to provide proof of legal land division.
Pending Assignment by JCM11/22/2002 11/25/2002 DONE
DetailsJohn Menard
11/25/2002 08:24:16 JCM - activity updated through activity BLDA170 from case BLD02-02863.
Additional plans submitted  11/22/2002 DONE
1. Received ESC Prepared Plans
2. Received ESC Narrative
3. Received (3) extra sets of Civil Plans with Grading and Drainage Plans.
4. Received (3) sets of replacement sheets P1, P2, P3, P4, P5, P6, P7.1, P7.2 to replace sheets that was submitted originally.
5. Received ESC Permit Application.
6. Received Architect/Engineer Declaration Form.
Attached with plans.
Plans ACCEPTED BY PLAN TECH  11/22/2002 DONE
All items submitted.
Plans ACCEPTED BY PLAN TECH  11/22/2002 PEND
1. Informed applicant that (1) more set of plans are required, (2) ESC Plan Narrative, the certification number for the Plan Designer is required on the ESC Plans, (1) ESC Permit Application, and Sheet P4 requires the engineers signature. Also need (3) extra civil plans with grading and drainage and the Architect/Engineer Declaration Form.
Application received  11/21/2002  
Recd Pcfee & Taken To Pln CK  11/21/2002  
First Notice 6/2/2016