Fee Review-notes | 5/9/2003 | 5/9/2003 | 8/10/2004 | | DONE |
|
|
|
plm values really low,,,,,
|
First Notice | | 3/4/2004 | 3/4/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/4/2004 | | DONE |
|
|
|
Perm. Occ. cert. # 10021 issued 3-4-04 to Our lady of the Rosary.
|
Permanent Occupancy | | 3/3/2004 | 3/3/2004 | | DONE |
|
|
|
|
BLD-Final | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/2/2004 at 11:51:36 AM. Contact: ###-####.
|
BLD-Aging Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 | | NR |
Jim Storey
|
|
|
pending counter top listed for fire shudder. 2/18/2004 9:43:31 AM
|
FIRE-Final Inspection | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/17/2003 at 3:47:17 PM. Contact: ###-####. air balance final report received - okay 12/18/2003 11:37:21 AM
|
BLD-Final | 12/15/2003 | 12/16/2003 | 12/16/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/15/2003 at 3:35:44 PM. Contact: ###-####. temp occ ok pending others sign off and reinsp. of listed counter top at kitchen passthrough at fire shutter to complet opening protection. 12/16/2003 4:20:34 PM
|
Temporary occupancy | | | 12/16/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #5042 issued 12-16-03 to Our Lady of the Rosaary.
|
FIRE-Alarm Testing | 12/11/2003 | 12/12/2003 | 12/12/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/11/2003 at 2:38:13 PM. Contact: ###-####.
|
Code Occupancy Approval | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PASS |
Wm. Michael Meloy
|
|
|
compliance met. 12/12/2003 4:15:37 PM
|
BLD-Final | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | FAIL |
Jim Storey
|
|
|
arch. to submit listed counter top for fire shudder per ubc chapter 7 under nfpa 80 sec 12-3.1/ also handrail to meet code on stair to stage / letter of acceptance of field review of all ada compliance.
|
FIRE-Final Inspection | 12/10/2003 | 12/10/2003 | 12/10/2003 | A | FAIL |
Rick Jackson
|
|
|
door hardware on door to vestibule and door from classrooms; fire stop penetrations at stage wall; smoke seals on rated doors; FDC sign needed at FDC; need to test kitchen system; need updated alarm map; tampers and low air to be supervisory 12/10/2003 11:25:53 AM
|
BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | NR |
Jim Storey
|
|
|
dan- ###-#### pending door hardware isues/ fire shuder counter listing requirments/fire testing to proceed 12/10 am. 12/9/2003 4:23:05 PM
|
PubWorks Occupancy Approval | 12/3/2003 | 12/3/2003 | 12/3/2003 | | DONE |
|
|
|
Drainage complete, signed permanent occupancy 12/03/03. D.Erskine
|
BLD-Final | 12/2/2003 | 12/2/2003 | 12/2/2003 | P | NR |
Tom Arcoraci
|
|
|
Dan Updyke; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/20/2003 at 3:28:09 PM. Contact: ###-####.
|
BLD-Other | 11/21/2003 | 11/21/2003 | 11/21/2003 | P | PART |
Jim Storey
|
|
|
fire proofing patchs ok 11/21/2003 3:50:37 PM
|
BLD-Framing/Rough-in | 11/17/2003 | 11/18/2003 | 11/18/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 3:40:24 PM. Contact: ###-####. fire proffing patches/fire stopping occ and lid. 11/18/2003 3:02:31 PM
|
BLD-Framing/Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 4:03:09 PM. Contact: ###-####.mlb juatified. 9/16/2003 1:04:32 PM
|
BLD-Framing/Rough-in | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 2:53:40 PM. Contact: ###-####. truss web breacing/ 3 ply mlb support/ two ply truss over stage justify not done that way. 9/2/2003 11:24:31 AM
|
BLD-Conference | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 9:51:53 AM. Contact: ###-####. 900 am apointment.w/dan. 8/25/2003 2:58:56 PM occ septration for kitchen not drawn on aproved plan tomeet code ubc 97 pending resolve to build. 8/26/2003 10:16:28 AM
|
BLD-Framing/Rough-in | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 10:23:50 AM. Roof nailing @ 6 & 12....OK CMST12 and CS16 staps installed over roof sheathing per detail....OK to roof. 8/12/2003 10:23:30 AM
|
BLD-Other | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 3:44:32 PM. Contact: ###-####.top out of massanary walls ok to grout. 7/11/2003 9:17:49 AM
|
BLD-Other | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/8/2003 at 12:25:25 PM. Contact: ###-####.first 48 " grout pour ok 7/9/2003 11:33:43 AM
|
BLD-Other | 7/8/2003 | 7/9/2003 | 7/9/2003 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/8/2003 at 12:26:06 PM. Contact: ###-####.
|
BLD-Conference | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/16/2003 at 2:29:40 PM. Contact: ###-####.arch and mech engineer to review plan and define opening protection requriments of rated const. 6/17/2003 9:40:01 AM
|
BLD-Foundation | 6/2/2003 | 6/3/2003 | 6/3/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/2/2003 at 11:54:29 AM. Contact: ###-####. rebar ok pending special ins. report on concrete. 6/3/2003 9:19:43 AM
|
BLD-Conference | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PASS |
Jim Storey
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore SET UP FOR A CONF AT 9:00 AM WITH ARCH. AND DAN WITH CM CO. 5/27/2003 3:16:21 PM
|
BLD-Footing | 5/23/2003 | 5/27/2003 | 5/27/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/23/2003 at 10:29:33 AM. special insp. report pending/ north p/l needs surved to verify 20 ft fence line per arch. is not 20 ft no p/l pins can be located. 5/27/2003 10:07:16 AM
|
Inspection Record Card- Bld | | | 5/7/2003 | | |
|
|
|
|
BLD-Conference | 5/1/2003 | 5/1/2003 | 5/1/2003 | P | CANC |
Jim Storey
|
|
|
###-#### clint
|
Issue PAID IN FULL permit | | | 4/9/2003 | | |
|
|
|
|
Print Occupancy Form | | | 3/11/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/11/2003 | | DONE |
|
|
|
permit ready and need ACHD
|
Print Occupancy Form | | | 3/11/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/27/2003 | | 3/10/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2003 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/10/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/10/2003 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 12/4/2002 | | 3/10/2003 | | PASS |
Mike Phillips
|
|
|
3/10/2003 16:40:48 M_P - activity updated through activity BLDA022 from case BLD02-02919.
|
Plan resubmittals received | | | 3/5/2003 | | DONE |
|
|
|
Received two copies of revised sheet A-1.0. Routed Mike P. kmm
|
Plan resubmittals received | | | 2/28/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets M-0.1, M-1.1, M-2.1, M-3.1, M-4.1, M-4.2, M-4.3, with transmittal. Routed to Mike Phillips.
|
Routing - PLAN CHECK | 1/7/2003 | | 2/27/2003 | | FAIL |
|
|
|
2/27/03 * Need additional informaiton. Called and requested mechanical plans to reflect fire damper locations and accessible means of egress from the outside patio and canopy area to the public way.
|
Routing Off Site - STRUCTURAL | 2/7/2003 | | 2/18/2003 | | PASS |
|
|
|
Contacted PDQ to take resubmitted plans of 2/7/03 to outside eng. kmm
|
Plan resubmittals received | | | 2/7/2003 | | DONE |
|
|
|
Received three copies of struct. sheets S1.1, S5.1 and struct. calcs. Routed one copy to outside eng. the other two copies to Mike P. Received two copies of revised sheets, cover sheet, C1.3, C1.6, A-1.1, A1.2, A-1.3, A-1.4, A-2.1, A-3.1, A-3.2, A-3.3, A-3.4, A-3.5, A-4.1, A-4.2, A-5.1, E-3L, E-3S. One copy of cover letter. Routed to Mike P. kmm
|
Plan Review Completed(1st rev) | | | 1/7/2003 | | FAIL |
|
|
|
|
Routing - FIRE | 1/3/2003 | | 1/7/2003 | | PASS |
|
|
|
|
Print permit w/o conditions | | | 1/3/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 12/20/2002 | | 1/3/2003 | | FAIL |
|
|
|
Plan review completed. Sent copy of correction report to architect requesting additional informatio for further review prior to issuing permit.
|
Routing - PLUMBING | 12/17/2002 | | 12/19/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 12/16/2002 | | 12/17/2002 | | PASS |
|
|
|
Approved per CUP02-00062
|
Routing Off Site - STRUCTURAL | 12/5/2002 | | 12/17/2002 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. kmm
Second review recuired by outside engineering firm.
|
Routing - Erosion and Sediment | 12/12/2002 | | 12/13/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 12/5/2002 | | 12/12/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/5/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/5/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 12/5/2002 | | 12/5/2002 | | PASS |
|
|
|
Parcel created prior to October 30, 1965.
|
Application received | | | 12/3/2002 | | |
|
|
|
|