BLD-Final | 2/24/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Troy James
|
|
|
dan -- ###-#### cell
|
BLD-Grading Inspection | 2/25/2005 | 2/25/2005 | 2/25/2005 | | DONE |
|
|
|
Final grading and drainage approved
|
DOC - Permit Finaled | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 2/25/2005 2:06:08 PM
|
BLD-Framing/Rough-in | 4/3/2003 | 4/3/2003 | 4/3/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 8:55:27 AM.
|
BLD-Framing/Rough-in | 3/30/2003 | 4/1/2003 | 4/1/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/30/2003 at 9:20:22 PM. c/n items note complete 4/1/2003 2:00:37 PM
|
BLD-Energy code compliance | 3/30/2003 | 4/1/2003 | 4/1/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/30/2003 at 9:21:02 PM.
|
BLD-Framing/Rough-in | 3/27/2003 | 3/28/2003 | 3/28/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 2:25:21 PM. c/n on site ok to insulate 3/28/2003 11:27:22 AM
|
BLD-Wall cover | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/10/2003 at 12:35:55 PM. 3/10/2003 3:45:30 PM shear ok to cover ext walls need to check two retro fit hold downs at frame one on each side of windows by double doors sw corner of house 3/11/2003 11:04:29 AM
|
BLD-Wall cover | 3/7/2003 | 3/10/2003 | 3/10/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 11:46:25 AM. need a full and legible set of city approved plans on site at time of inspection do not cover ext 3/10/2003 10:11:31 AM
|
BLD-Foundation | 1/21/2003 | 1/22/2003 | 1/22/2003 | A | PASS |
Dave Hannah
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 1/15/2003 | 1/16/2003 | 1/16/2003 | A | PASS |
Dave Hannah
|
|
|
rick cell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 1/3/2003 | 1/6/2003 | 1/6/2003 | P | FAIL |
Tony Young
|
|
|
dustin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need Terry Records sign off 1st, not ready due to the hole is off 1/6/2003 1:03:44 PM
|
BLD-Grading Inspection | 1/6/2003 | 1/6/2003 | 1/6/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade was inspected by the geotechnical engineer on January 3, 2003. If subsequent excavation has been done since that time a re-inspection may be necessary.
|
Issue PAID IN FULL permit | | | 12/19/2002 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 12/17/2002 | 12/17/2002 | 12/17/2002 | | PASS |
Dan Overy
|
|
|
12/17/2002 14:22:07 DJO - activity updated through activity BLDA022 from case BLD02-02949.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/17/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 12/17/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/17/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/17/2002 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plans ACCEPTED BY PLAN CHECK | | | 12/17/2002 | | |
|
|
|
|
Routing - FIRE | 12/11/2002 | | 12/12/2002 | | DONE |
|
|
|
No fire sprinklers required (Nativa Terrace Block 3)
|
Routing - PLANNING | 12/9/2002 | | 12/11/2002 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 12/11/2002 | | 12/11/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS GRADING | 12/6/2002 | | 12/9/2002 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to plans and this case.
|
Routing - PUBLIC WORKS | 12/9/2002 | | 12/9/2002 | | PASS |
|
|
|
|
Application received | | | 12/6/2002 | | |
|
|
|
|
Pending Assignment by DJO | 12/6/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/12/2002 | | | | |
|
|
|
|