Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-02951
StatusFinaled
Name LARRONDO CONSTRUCTION
Site Address 5411 N QUAIL SUMMIT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2779 sq. ft. one story single family dwelling with an attached 1033 sq. ft. three car garage and covered patio areas at front and rear of structure per approved plans, all engineering and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space will be maintained. Unless otherwise approved by the Boise City Fire Department all structures shall be fitted with a 13D modified sprinkler system including sprinkler barrier protection between garage and dwelling according to their listing requirements. The sprinkler flow alarm shall be attached to the residence smoke detection system. PC #746 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/18/20037/21/20037/21/2003PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/18/2003 at 2:45:41 PM. c.c # 23954 issued 7/21/2003 4:36:10 PM
BLD-Final7/15/20037/16/20037/16/2003PFAIL
DetailsTony Young
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n posted 7/16/2003 4:17:57 PM
FIRE-Final Inspection7/16/20037/16/20037/16/2003PPASS
DetailsRick Jackson
BLD-Final7/15/20037/15/20037/15/2003PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 7/15/2003 at 9:02:44 AM. Contact: ###-####.
BLD-Grading Inspection7/14/20037/14/20037/14/2003 PASS
DetailsRita DeYoung
Final grading and drainage complete and approved.
BLD-Framing/Rough-in4/11/20034/11/20034/11/2003PPASS
DetailsTony Young
STEVE SHEAR WALL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
int shear ok 4/11/2003 2:12:28 PM
BLD-Conference4/8/20034/9/20034/9/2003APART
DetailsTony Young
on shear wall on interior
need to call in as needed 4/9/2003 10:37:48 AM
BLD-Energy code compliance4/7/20034/8/20034/8/2003PPASS
DetailsTony Young
STEVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Conference4/4/20034/7/20034/7/2003APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 4/4/2003 at 4:55:00 PM. Contact: ###-####.
on framing,, ok to insulate, c/n posted 4/7/2003 10:42:11 AM
BLD-Framing/Rough-in4/4/20034/4/20034/4/2003PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 4/4/2003 at 10:31:18 AM.
c/n posted, ok to insulate 4/4/2003 2:32:13 PM
BLD-Framing/Rough-in4/2/20034/3/20034/3/2003AFAIL
DetailsTony Young
###-####
no plans on site 4/3/2003 10:35:55 AM
BLD-Framing/Rough-in3/6/20033/7/20033/7/2003APART
DetailsTom Arcoraci
shear; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to side 3/7/2003 10:13:25 AM
BLD-Foundation1/20/20031/21/20031/21/2003APART
DetailsTony Young
Scheduled by a contractor via Hello! on 01/20/2003 at 09:07:32. Contact: ###-####. wip 1/21/2003 10:21:31 AM
BLD-Footing1/16/20031/17/20031/17/2003APART
DetailsTony Young
clint; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
also next door hsd issue w/ property line, looks ok on 5' setback per pins and pin shot in by surveyer (south) 1/17/2003 11:17:43 AM
BLD-Grading Inspection1/15/20031/15/20031/15/2003 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer.
Issue PAID IN FULL permit  1/6/2003 DONE
Plan assigned to (DJO)1/2/20031/2/20031/2/2003 PASS
DetailsDan Overy
1/2/2003 09:31:53 DJO - activity updated through activity BLDA022 from case BLD02-02951.
PLANS/APPL TAKEN TO FRONT DESK  1/2/2003 DONE
Case Summary (BLD)  1/2/2003 DONE
Plan Review Report  1/2/2003 DONE
Inspection Record Card- Bld  1/2/2003 DONE
Print Occupancy Form  1/2/2003 DONE
Telephone call  1/2/2003 DONE
PERMIT READY AND FEES DUE
Plans ACCEPTED BY PLAN CHECK  1/2/2003  
Routing - Erosion and Sediment12/16/2002 12/17/2002 PASS
ESC approved with conditions attached to plans.
Routing - FIRE12/17/2002 12/17/2002 DONE
This house requires a 13D fire sprinkler system, except not required within closets and bathooms, and shall also include a single row of sprinklers in the garage along the wall common to the garage and the heated space, spaced sideways according to their listing requirements.
Routing - PLANNING12/11/2002 12/16/2002 PASS
Routing - PUBLIC WORKS GRADING12/9/2002 12/11/2002 PASS
DetailsRita DeYoung
Approved as Category 3 with conditions of approval in letter attached the plans and this case.
Routing - PUBLIC WORKS12/11/2002 12/11/2002 PASS
Application received  12/9/2002  
Pending Assignment by DJO12/9/2002    
DetailsDan Overy
Routing - PLAN CHECK12/17/2002