Fee Review-notes | 8/13/2003 | 8/13/2003 | 8/13/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent occupancy | | | 3/26/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9606 issued 3-26-03 to Anytime Bail Bonds.
|
BLD-Final | 3/25/2003 | 3/25/2003 | 3/25/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ok pending mech final for perm occ 3/25/2003 12:56:08 PM 3/25/2003 12:56:43 PM
|
Permanent Occupancy | | 3/25/2003 | 3/25/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/24/2003 | 3/24/2003 | 3/24/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 3/24/2003 6:47:42 PM
|
BLD-Framing/Rough-in | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | PASS |
Dave Hannah
|
|
|
ok to cover after elec r/i
|
Issue PAID IN FULL permit | | | 2/3/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/8/2003 | | 1/31/2003 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 12/10/2002 | | 1/31/2003 | | PASS |
|
|
|
1/31/2003 11:49:52 RMH - activity updated through activity BLDA022 from case BLD02-02959.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/31/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/31/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/31/2003 | | DONE |
|
|
|
called 1-31-03
|
Plan resubmittals received | | | 1/28/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets T1.0, A1.0, A2.0, A2.1, A3.0, A4.0, with cover letter. Routed to Ron Hill.
|
Plan Review Completed(1st rev) | | | 1/7/2003 | | FAIL |
|
|
|
|
Routing - FIRE | 1/3/2003 | | 1/7/2003 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 1/3/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/12/2002 | | 1/3/2003 | | FAIL |
|
|
|
Plans failed in building department review, Faxed and Mailed requirements to the architect on 1/3/02, Routed plans to the fire department same day.
|
Routing - PLANNING | 12/11/2002 | | 12/12/2002 | | FAIL |
|
|
|
T.I. plans indicate work at other areas of the building that do not comply with Design Review file DRH02-216. Design Review application did not indicate phasing. Options for the proposed T.I. are to submit a separate zoning certificate for the T.I.; or submit a DR modification application to separate the proposed T.I. from the other work in a phasing plan; or comply with all requirements as outlined in DRH02-216.
|
Routing - PUBLIC WORKS | 12/10/2002 | | 12/11/2002 | | PASS |
|
|
|
|
First Notice | 12/9/2002 | 12/9/2002 | 12/9/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/9/2002 | | DONE |
|
|
|
|
Application received | | | 12/9/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 12/9/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 12/9/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/9/2002 | | DONE |
|
|
|
|