Fee Review-notes | 1/28/2003 | 1/28/2003 | 8/10/2004 | | DONE |
|
|
|
|
First Notice | | 1/22/2004 | 1/22/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/22/2004 | | DONE |
|
|
|
Perm. Occ. Cert. #9941 issued 1-22-04 to Treasure Valley Steel.
|
Permanent Occupancy | | 1/14/2004 | 1/14/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | 1/14/2004 | 1/14/2004 | 1/14/2004 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF 1/14/2004 4:26:21 PM
|
BLD-Aging Inspection | 1/13/2004 | 1/13/2004 | 1/13/2004 | | PASS |
Jim Storey
|
|
|
|
Inspection Record Card- Bld | | | 1/13/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/13/2004 | | DONE |
|
|
|
|
BLD-Final | 10/9/2003 | 10/10/2003 | 10/10/2003 | A | PASS |
Rick Jackson
|
|
|
I have the co card call me. 301
|
FIRE-Final Inspection | 10/10/2003 | 10/10/2003 | 10/10/2003 | A | PASS |
Rick Jackson
|
|
|
|
BLD-Aging Inspection | 10/7/2003 | 10/7/2003 | 10/7/2003 | | PASS |
Jim Storey
|
|
|
final ok 10/10/2003 10:05:37 AM
|
PubWorks Occupancy Approval | | | 8/5/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 8/5/03. S.Landaluce
|
BLD-Final | 8/4/2003 | 8/4/2003 | 8/4/2003 | P | CANC |
Tom Arcoraci
|
|
|
###-#### roni---they are closed 12-1
|
BLD-Aging Inspection | 7/28/2003 | 7/28/2003 | 7/28/2003 | | PART |
Jim Storey
|
|
|
strucraul final ok need achd and public wooks sign off. card on site. 7/28/2003 11:21:25 AM
|
BLD-Final | 5/23/2003 | 5/27/2003 | 5/27/2003 | A | NR |
Jim Storey
|
|
|
###-#### ###-#### need sign offs. 5/27/2003 10:36:12 AM
|
BLD-Final | 4/23/2003 | 4/24/2003 | 4/24/2003 | A | NR |
Jim Storey
|
|
|
KIRK PLEASE CALL FIRST; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 4/10/2003 | 4/11/2003 | 4/11/2003 | A | PART |
Jim Storey
|
|
|
curt-- ###-#### curt-- ###-#### supply justifcation of 2 df 2x12 in lou of 2 9 1/2 mlb as per plan. ok to cover all other areas. 4/11/2003 9:12:05 AM
|
BLD-Framing/Rough-in | 4/7/2003 | 4/8/2003 | 4/8/2003 | A | FAIL |
Jim Storey
|
|
|
###-#### kirt top plate splices no king studs/ girder trusses nailling/support at bearing /sheathing at ridge/ headerd check on plans to be on site at reinsp. 4/8/2003 10:30:01 AM
|
BLD-Foundation | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung walls ok. 2/24/2003 10:01:46 AM
|
BLD-Footing | 2/14/2003 | 2/18/2003 | 2/18/2003 | A | PASS |
Jim Storey
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie rebar and ft ok. 2/18/2003 10:34:57 AM
|
(F) Reprint permit | | | 1/31/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/30/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2003 | | DONE |
|
|
|
permit ready and fees due
|
Print Occupancy Form | | | 1/28/2003 | | |
|
|
|
|
Routing - FIRE | 1/24/2003 | | 1/28/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/20/2002 | | 1/28/2003 | | PASS |
Mike Otto
|
|
|
1/28/2003 14:13:16 MLO - activity updated through activity BLDA022 from case BLD02-02962.
|
Routing - PLUMBING | 1/23/2003 | | 1/24/2003 | | PASS |
|
|
|
see letter from engineer with corrections.
|
Routing - PUBLIC WORKS | 1/16/2003 | | 1/22/2003 | | PASS |
|
|
|
|
Routing - PLUMBING | 1/22/2003 | | 1/22/2003 | | FAIL |
|
|
|
indicate pumping system on plan a-1. bldg sewer must be 4 inch with a clean out 2 feet outside of bldg. 3. pressure ssewer line size not indicated 4. is a septic tank and a pumping chamber being used? the drawings do not indicate. a cut sheet for both was sent back.
|
Routing - PLAN CHECK | 1/15/2003 | | 1/16/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/14/2003 | | DONE |
|
|
|
Received two copies of revised sheets ME, A1, 1/1. Routed to Mike O. kmm
|
Plan Review Completed(1st rev) | | | 12/31/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 12/30/2002 | | 12/31/2002 | | FAIL |
|
|
|
hydrant location &flow, and access thru gates
|
Plan resubmittals requested | | | 12/30/2002 | | DONE |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 12/26/2002 | | 12/30/2002 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Routing - PLUMBING | 12/20/2002 | | 12/26/2002 | | FAIL |
|
|
|
need more info on plans, including design detail on septic/graywater pump station
|
Routing Off Site - STRUCTURAL | 12/10/2002 | | 12/23/2002 | | PASS |
|
|
|
Contacted PDQ to take plans to outside eng. KMM
|
Routing - PLANNING | 12/17/2002 | | 12/20/2002 | | PASS |
|
|
|
Approved per DRH02-177 and as noted on sheet A-1, which states that plant material which was omitted from the Design Review plan at the trash enclosure shall be added back to the streetscape area.
Also note that crushed asphalt paving is okay at storage yard areas, unless prohibited by other agencies, such as the fire dept. etc.
|
Routing - Erosion and Sediment | 12/17/2002 | | 12/17/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 12/10/2002 | | 12/13/2002 | | FAIL |
|
|
|
an entry error has been made on the approval .. Plans were rejected by Brian Murphy on 12-13-02. Brian contacted Ron Baldwin regarding the corrections on 12-13-02. Status is changed to fail. MLO
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/10/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 12/10/2002 | | 12/10/2002 | | PASS |
|
|
|
Lot 12, Block 3 of Boise Industrial Foundation Subdivision No. 5
|
Application received | | | 12/9/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/9/2002 | | DONE |
|
|
|
|