(F) Reprint permit | | | 1/14/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/14/2005 | | DONE |
|
|
|
|
BLD-Other | 10/7/2004 | 10/8/2004 | 10/8/2004 | A | PASS |
Lane Manuel
|
|
|
hand rail-; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 10/8/2004 | 10/8/2004 | 10/8/2004 | A | PASS |
Lane Manuel
|
|
|
Finaled by inspector at 10/8/2004 10:26:00 AM
|
BLD-Final | 8/11/2004 | 8/11/2004 | 8/11/2004 | P | FAIL |
Lane Manuel
|
|
|
Juanita; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
left c'n to install handrail 8/11/2004 4:04:26 PM
|
PostCard Mailed | | | 8/4/2004 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
(F) Reprint permit | | | 7/16/2004 | | |
|
|
|
|
BLD-Final | 12/30/2003 | 12/31/2003 | 12/31/2003 | A | FAIL |
Troy James
|
|
|
owner already living in it. --call 1st before insp- juanita- ###-#### contractor has not complied with previous c/n. No electrical permit for garage. No rough framing been inspected. 12/31/2003 12:08:47 PM
|
PostCard Mailed | | | 12/10/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Conference | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | FAIL |
Russ Owen
|
|
|
out of time,,, see prior note . i posted a c/n on window and called contractor (Eric) reads no electrical permit aor plumbing or mechanical,alos no c of c . He said he would check things out also called linda. 5/19/2003 11:57:14 AM
|
BLD-Other | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | CANC |
Tony Young
|
|
|
could you check on this. There is no Ele. or plm permits pulled on this. So wondering if it may be done with out these permits. George said to just send ya the inspection. Would you please let me know what you find out.... thanks Linda ###-####
out of time,, can wait 5/16/2003 12:01:15 PM
|
BLD-Foundation | 1/28/2003 | 1/29/2003 | 1/29/2003 | A | PART |
Russ Owen
|
|
|
wip. 1/29/2003 10:03:45 AM
|
BLD-Footing | 1/27/2003 | 1/28/2003 | 1/28/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/27/2003 at 10:13:29. Contact: ###-####.
|
BLD-Footing | 12/31/2002 | 1/2/2003 | 1/2/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/31/2002 at 12:39:15. Contact: ###-####.
|
Inspection Record Card- Bld | | | 12/31/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/31/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/24/2002 | | |
|
|
|
|
Telephone call | | | 12/24/2002 | | DONE |
|
|
|
permit ready
|
Plan assigned to (DJO) | 12/23/2002 | 12/23/2002 | 12/23/2002 | | PASS |
Dan Overy
|
|
|
12/23/2002 10:46:44 DJO - activity updated through activity BLDA022 from case BLD02-02975.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/23/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 12/23/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/23/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 12/16/2002 | | 12/16/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 12/16/2002 | | 12/16/2002 | | PASS |
|
|
|
|
Application received | | | 12/11/2002 | | |
|
|
|
|
Pending Assignment by DJO | 12/11/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/16/2002 | | | | |
|
|
|
|
Routing - PLANNING | 12/11/2002 | | | | FAIL |
|
|
|
Waiting for call back to verify with Eric King if the porch shown on floor plan is proposed or not. Setback ok if porch not being built. Porch would encroach into setback.
|