Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-02979
StatusExpired
Name TESORO WEST COAST COMPANY
Site Address 321 N CURTIS RD
Project Name 
Customer Number 
ePlanReviewNo
Description
"HYDROCARBON VAPOR PROCESSING UNIT", Tesoro Petroleum * To install a VPU in order to reduce volatile organic compounds emissions. Work to include excavation and preparation for a structural reinforced slab to carry the dead load and lateral force overturn of the new 8 foot diameter by 45 foot tall Vapor Combustion Exhaust Stack. To reroute existing fuel supply lines above ground on extended existing supports to the existing fuel dispensing terminal. To install vapor removal piping from the existing bulk fuel dispensing station to the new Hydrocarbon Vapor Processing Unit and install the Thermal Oxidizing System. All per approved plans, national standards and attached engineering details. A Letter of Completion / Compliance" is required for this project. CUP02-00137 PC#775-02/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/15/20043/15/20043/15/2004 CANC
DetailsTom Arcoraci
DOC - Permit Expired3/15/20043/15/20043/15/2004APASS
DetailsTom Arcoraci
Expired by inspector at 3/15/2004 8:29:11 AM
BLD-Aging Inspection1/14/20041/14/20041/14/2004 NR
DetailsTom Arcoraci
BLD-Aging Inspection10/31/200310/31/200310/31/2003 NR
DetailsTom Arcoraci
BLD-Aging Inspection8/29/20038/29/20038/29/2003 PASS
DetailsTom Arcoraci
wip 8/29/2003 9:07:46 AM
BLD-Foundation3/20/20033/21/20033/21/2003PPASS
DetailsTom Arcoraci
russ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Issue PAID IN FULL permit  1/8/2003 DONE
Inspection Record Card- Bld  12/23/2002 DONE
Telephone call  12/23/2002 DONE
permit ready and fees due
Plan assigned to (DRS)12/12/2002 12/20/2002 PASS
DetailsDan Stuart
12/20/2002 15:51:37 MYS - activity updated through activity BLDA022 from case BLD02-02979.
Routing - FIRE12/18/2002 12/20/2002 PASS
Plan Review Completed(1st rev)  12/20/2002 PASS
Routing - PLAN CHECK12/20/2002 12/20/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/20/2002 DONE
Routing - PLANNING12/17/2002 12/18/2002 PASS
Approved per CUP02-00137, given to Design Review for review on 12/17/02.

DR Approval - Approved per CZC02-181. SMS
Routing - PLAN CHECK12/18/2002 12/18/2002 PEND
Plans approved per engineering provided and national standards reviewed with Sam Rogers, Fire Code Analyst and Dan Stuart, Plan review for structural considerations. Routing to fire code analyst for review comments.
Routing - Erosion and Sediment12/16/2002 12/17/2002 PASS
Waiver request approved with conditions attached to plans.
Routing - PUBLIC WORKS12/13/2002 12/16/2002 PASS
Routing - PLANNING Land Div12/12/2002 12/13/2002 PASS
Approved, site is over 18 acres in size.
Plan routing begun/TENANTS  12/12/2002 DONE
Override - Parcel Holds  12/12/2002  
Plans ACCEPTED BY PLAN TECH  12/12/2002 DONE
Override - Parcel Holds  12/11/2002  
Application received  12/11/2002  
Override - Parcel Holds  12/11/2002  
Recd Pcfee & Taken To Pln CK  12/11/2002 DONE
Fee Review-notes12/11/200212/11/2002