BLD-Final | 5/6/2003 | 5/7/2003 | 5/7/2003 | P | PASS |
Jim Storey
|
|
|
ready at 2pm ###-####
|
DOC - Permit Finaled | 5/7/2003 | 5/7/2003 | 5/7/2003 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 5/7/2003 4:54:30 PM
|
BLD-Energy code compliance | 2/26/2003 | 2/27/2003 | 2/27/2003 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Framing/Rough-in | 2/26/2003 | 2/27/2003 | 2/27/2003 | A | PASS |
Jim Storey
|
|
|
Internet Inspection Request from: Rita DeYoung
|
BLD-Framing/Rough-in | 2/26/2003 | 2/26/2003 | 2/26/2003 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Inspection cancelled from web by: Rita DeYoung
|
BLD-Framing/Rough-in | 2/25/2003 | 2/25/2003 | 2/25/2003 | A | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 1/28/2003 | 1/29/2003 | 1/29/2003 | A | PART |
Jim Storey
|
|
|
###-#### ###-#### exterior ok for cover. 1/29/2003 8:44:17 AM
|
BLD-Foundation | 1/2/2003 | 1/2/2003 | 1/2/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 07:43:16. Contact: ###-####.
|
BLD-Foundation | 1/2/2003 | 1/2/2003 | 1/2/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 07:43:16. Contact: ###-####.
|
BLD-Footing | 12/30/2002 | 12/30/2002 | 12/30/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/30/2002 at 07:25:11. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 12/24/2002 | | |
|
|
|
|
Plan assigned to (DJO) | 12/23/2002 | 12/23/2002 | 12/23/2002 | | PASS |
Dan Overy
|
|
|
12/23/2002 14:11:14 DJO - activity updated through activity BLDA022 from case BLD02-02983.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2002 | | |
|
|
|
|
Case Summary (BLD) | | | 12/23/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 12/23/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 12/23/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plans ACCEPTED BY PLAN CHECK | | | 12/23/2002 | | |
|
|
|
|
Routing - FIRE | 12/20/2002 | | 12/20/2002 | | PASS |
|
|
|
Plans approved subject to red-lined FD requirements written on plans by Dave Miller 12/20/2002.
|
Routing - FIRE | 12/17/2002 | | 12/17/2002 | | FAIL |
|
|
|
plans routed to Sam Rogers due to excessive length of driveway. 217/02- SLR:Failed. Proposed driveway is of inadequate width; 20' required, 14' shown. Need to widen or get FD approval for non-standard width. Also, the furthest accessible point of vehicle access is the point of the right angle turn, due to inadequate radius and lack of turnaround at the end of driveway. The most remote area of house is within 150' along two direct lines from the furthest point of FD vehicle access. Need the architect to verify in writing that the terrain, fencing and landscaping will allow FD personnel access from the vehicle to the most reomote area of the house, along this direct route.
|
Routing - PLAN CHECK | 12/13/2002 | | 12/17/2002 | | |
|
|
|
|
Routing - PLANNING | 12/12/2002 | | 12/13/2002 | | PASS |
|
|
|
Driveway must be paved. AKT
|
Routing - PUBLIC WORKS | 12/13/2002 | | 12/13/2002 | | PASS |
|
|
|
|
Application received | | | 12/12/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 12/12/2002 | | 12/12/2002 | | PASS |
|
|
|
Lot split approved by ROS 5943.
|
Pending Assignment by DJO | 12/12/2002 | | | | |
Dan Overy
|
|
|
|