Case Summary (BLD) | | | 2/22/2016 | | DONE |
|
|
|
|
Second Notice BLD | 7/7/2006 | 7/7/2006 | 7/7/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 6/2/2006 | 6/2/2006 | 7/7/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 6/2/2006 | 6/2/2006 | 6/2/2006 | | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 3/30/2006 | 3/30/2006 | 3/30/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/30/2006 | 3/30/2006 | 3/30/2006 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 4:02:31 PM. Contact: ###-####. Ok shell complete. Done . 7/29/2003 2:35:30 PM
|
FIRE-Final Inspection | 7/29/2003 | 7/29/2003 | 7/29/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm, fire sprinkler and fire life safety finaled
|
Letter of compliance | | | 7/29/2003 | | DONE |
|
|
|
Letter of Compliance #22974 issued 7-29-03.
|
BLD-Final | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | NR |
Russ Owen
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Annette Moore. NEEDS FIRE LIFE SAFETY. 7/28/2003 4:52:30 PM
|
PubWorks Occupancy Approval | | | 7/24/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 7/24/03. G.Fitts
|
FIRE-Alarm Testing | 7/21/2003 | 7/23/2003 | 7/23/2003 | A | CANC |
Troy Cobbley
|
|
|
ED; Phone #: ###-#### Per contractor the phone lines are not in yet 7/23/2003 10:39:52 AM
|
Print Occupancy Form | | | 7/22/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 | A | PART |
Russ Owen
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Marsha Smylied; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, needs special inspection letter of completion and engineers letter.e, needs special inspection letter of completion and engineers letter. 7/17/2003 2:12:14 PM 7/17/2003 2:12:28 PM
|
Code Occupancy Approval | 7/18/2003 | 7/17/2003 | 7/17/2003 | A | PASS |
Scott M.Brown
|
|
|
ALL LANDSCAPE AND OTHER REQUIREMENTS IN PLACE FINAL SIGNED OFF. 7/18/2003 10:14:21 AM
|
BLD-Framing/Rough-in | 7/2/2003 | 7/2/2003 | 7/2/2003 | P | PART |
Russ Owen
|
|
|
Ok pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:33 PMOk pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:42 PM
|
BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 | A | CANC |
Russ Owen
|
|
|
I called contractor and he said the project engineer will be out on 7/2/03 he was unable to make it this day. 7/1/2003 5:33:32 PM
|
BLD-Framing/Rough-in | 6/27/2003 | 6/30/2003 | 6/30/2003 | P | CANC |
Russ Owen
|
|
|
###-#### called builder will have engineer 7/1/2003 11:36:03 AM back out prior to inspection 7/1/2003 11:36:17 AM
|
BLD-Conference | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | PART |
Russ Owen
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:39 PMed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:59 PM
|
BLD-Framing/Rough-in | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | PART |
Russ Owen
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore entry areas have been incapsulated in drywall. 6/4/2003 5:06:52 PM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/27/2003 at 4:56:02 PM. Contact: ###-####. I have posted a c/n engineer to address column connections at opposite hold downs called and talked with him. 5/28/2003 11:40:59 AM
|
BLD-Foundation | 4/25/2003 | 4/25/2003 | 4/25/2003 | P | PART |
Russ Owen
|
|
|
ED PLEASE CALL BEFORE SO THAT ED CAN BE THERE; Phone #: ###-#### Internet Inspection Request from: Darla Downs. On sie visit will caal for shear inspection when ready. 4/28/2003 2:15:03 PM
|
BLD-Footing | 3/17/2003 | 3/17/2003 | 3/17/2003 | P | PART |
Russ Owen
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Annette Moore MTI will be performing inspections. 3/18/2003 12:25:56 PM
|
(F) Reprint permit | | | 2/12/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/11/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/7/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/7/2003 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PUBLIC WORKS | 2/5/2003 | | 2/6/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/6/2003 | | 2/6/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2003 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 12/16/2002 | | 2/6/2003 | | PASS |
John Menard
|
|
|
2/6/2003 15:50:48 JCM - activity updated through activity BLDA022 from case BLD02-02999.
|
Routing - PLAN CHECK | 1/6/2003 | | 2/5/2003 | | |
|
|
|
|
Telephone call | | | 1/10/2003 | | DONE |
|
|
|
Received a new Warranty Deed stating new Parcel Owners are Centurion Leasing, Inc. Put in file. kmm
|
Routing Off Site - STRUCTURAL | 1/7/2003 | | 1/9/2003 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 1/6/03 to outside eng. kmm Received fax from consulting engineer approving the resubmittals. JCM
|
Plan resubmittals received | | | 1/7/2003 | | DONE |
|
|
|
Received three copies of cover letter response to structural comments -Pinnace Eng. Three copies of sheet S-0 & S-2 for lot 3. Routed to John Menard
|
Plan Reviewer's activity | | | 1/3/2003 | | PASS |
|
|
|
Plans reviewed and approved as submitted with attached comment list. JCM
|
Plan Review Completed(1st rev) | | | 1/3/2003 | | FAIL |
|
|
|
|
Routing - FIRE | 1/3/2003 | | 1/3/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/24/2002 | | 1/3/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 1/2/2003 | | |
|
|
|
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 12/16/2002 | | 12/24/2002 | | FAIL |
|
|
|
called PDQ to send to outside engineering. dkl Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 12/23/2002 | | 12/24/2002 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLANNING | 12/23/2002 | | 12/23/2002 | | PASS |
|
|
|
Approved per DRH02-185.
|
Routing - Erosion and Sediment | 12/19/2002 | | 12/23/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 12/16/2002 | | 12/19/2002 | | FAIL |
|
|
|
Requires drainage plan-Geotech failed.
|
Plans ACCEPTED BY PLAN TECH | | | 12/16/2002 | | DONE |
|
|
|
1. Received (3) sets of plans, (3) sets of the Project Manual, (3) sets of Structural calculations, (1) ESC prepared plan- 11" x 17", (1) Drainage Report/Calculations, (1) O&M Manual, (1) Geotechnical Report, (1) letter from United Water, and (1) New Commercial Permit Application.
2. Informed applicant that a minimum of 18 x 24" prepared plans are required for ESC.
3. Called Cornel Larson 12/16/02, (3) extra sets of Grading and Drainage plans are required along with the ESC Permit Application completed.
|
Additional plans submitted | | | 12/16/2002 | | DONE |
|
|
|
Received (3) extra sets of Grading and Drainage Plans, (2) ESC Prepared Plans, and (1) ESC application. Attached to plans.
|
Override - Parcel Holds | | | 12/16/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 12/16/2002 | | 12/16/2002 | | PASS |
|
|
|
Lot 3, Block 1, Blackeagle Subdivision.
|
Application received | | | 12/13/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 12/13/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/13/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/13/2002 | | |
|
|
|
|
Fee Review-notes | 12/13/2002 | 12/13/2002 | | | |
|
|
|
|