Permit Information
Permit NumberBLD02-03001
StatusFinaled
Name CENTURION LEASING, INC.
Site Address 1480 S KIMBALL WAY
Project NameBlackeagle Lot 4
Customer Number 
ePlanReviewNo
Description
Blackeagle Lot 4 Shell Building - To construct a new 12,500 square foot, one story, steel structural frame with metal stud exterior walls office shell building and related site improvements. This is a shell permit only and occupany is approved under this permit. Separate tenant improvement permits are required to finish this building for occupany. This building is fully fire sprinklered. All construction per the approved plans and attached comment list. DRH02-00186/PC#786-02/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/22/2016 DONE
DOC - Permit Finaled  3/3/2006 DONE
BLD-Final7/28/20037/29/20037/29/2003APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 7/28/2003 at 4:01:01 PM. Contact: ###-####. Ok shell complete done. 7/29/2003 2:35:55 PM 7/29/2003 2:36:17 PM
FIRE-Final Inspection7/29/20037/29/20037/29/2003APASS
DetailsTroy Cobbley
fire alarm, fire sprinkler and fire life safety finaled
Letter of compliance  7/29/2003 DONE
Letter of Compliance #22975 issued 7-29-03.
BLD-Final7/28/20037/28/20037/28/2003PNR
DetailsRuss Owen
ed; Phone #: ###-#### Internet Inspection Request from: Annette Moore. NEEDS FIRE LIFE SAFETY. 7/28/2003 4:52:49 PM
PubWorks Occupancy Approval  7/24/2003 DONE
Drainage project complete, signed permanent occupancy 7/24/03. G.Fitts
FIRE-Final Inspection7/21/20037/23/20037/23/2003ACANC
DetailsTroy Cobbley
ED; Phone #: ###-#### Per the contractor the phone lines are not in 7/23/2003 10:40:41 AM
Code Occupancy Approval  7/23/2003 PASS
all conditions have been met final signed off.
Print Occupancy Form  7/22/2003 DONE
BLD-Framing/Rough-in7/16/20037/17/20037/17/2003APART
DetailsRuss Owen
ed; Phone #: ###-#### Internet Inspection Request from: Med; Phone #: ###-#### Internet Inspection Request from: Marsha Smylied; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, needs special inspection letter of completion and engineers letter./17/2003 2:12:14 PM 7/17/2003 2:13:02 PM
BLD-Framing/Rough-in7/2/20037/2/20037/2/2003PPART
DetailsRuss Owen
Ok pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:33 PMOk pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:49 PM
BLD-Framing/Rough-in7/1/20037/1/20037/1/2003ACANC
DetailsRuss Owen
I called contractor and he said the project engineer will be out on 7/2/03 he was unable to make it this day. 7/1/2003 5:33:40 PM
BLD-Framing/Rough-in6/27/20036/30/20036/30/2003PCANC
DetailsRuss Owen
###-####called builder will have engineer out prior to inspection 7/1/2003 11:38:07 AM
BLD-Framing/Rough-in6/12/20036/13/20036/13/2003PPART
DetailsRuss Owen
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:39 PMed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:50 PM
BLD-Framing/Rough-in5/19/20035/20/20035/20/2003ANR
DetailsRuss Owen
ed partial shear ; Phone #: ###-#### Internet Inspection Request from: Barbara MooreNeed to nail at all studs with hds. no c/n contractor on site. 5/20/2003 11:58:44 AM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003ANR
DetailsRuss Owen
No plans on site did go over some typicall requirements wth builder. 5/19/2003 5:13:20 PM
BLD-Framing/Rough-in5/16/20035/16/20035/16/2003PCANC
DetailsDave Hannah
ed shear wall & blocking; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation4/25/20034/25/20034/25/2003PPART
DetailsRuss Owen
ED; Phone #: ###-#### Internet Inspection Request from: Darla DownsOn site visit will recall for shear when ready. 4/28/2003 2:19:41 PM 4/28/2003 2:20:03 PM
BLD-Footing3/17/20033/17/20033/17/2003PPART
DetailsRuss Owen
ed; Phone #: ###-#### Internet Inspection Request from: Annette MooreMTI will be performing inspections. 3/18/2003 12:26:35 PM
(F) Reprint permit  2/12/2003  
Issue PAID IN FULL permit  2/11/2003  
Inspection Record Card- Bld  2/7/2003 DONE
Telephone call  2/7/2003 DONE
permit ready and fees due
Routing - PUBLIC WORKS2/5/2003 2/6/2003 PASS
Routing - PLAN CHECK2/6/2003 2/6/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/6/2003 PASS
Plan assigned to (JCM)12/16/2002 2/6/2003 PASS
DetailsJohn Menard
2/6/2003 15:51:34 JCM - activity updated through activity BLDA022 from case BLD02-03001.
Routing - PLAN CHECK1/15/2003 2/5/2003  
Routing - FIRE1/15/2003 1/15/2003 PASS
Routing - PLAN CHECK1/7/2003 1/15/2003  
Telephone call  1/10/2003 DONE
Received by fax a new Warranty Deed for Parcel Owner is now Centurion Leasing Inc. Put in file. kmm
Plan resubmittals received  1/10/2003 DONE
Sheet SP-1 and a letter with fire resumittal items received from architect and forwarded to John M.
Routing Off Site - STRUCTURAL1/7/2003 1/9/2003 PASS
Contacted PDQ to take revised plans of 1/6/03 to outside eng. kmm Received fax from consulting structural engineer approving resubmittals. JCM
Plan Review Completed(1st rev)  1/7/2003 FAIL
Plan resubmittals received  1/7/2003 DONE
Received three copies of cover letter rsponse to structural comments from Pinnacle Eng. and three copies of sheets S-0 & S-2 for lot 4. Routed to John M. kmm
Routing - FIRE1/3/2003 1/7/2003 FAIL
access issues
Routing - PLAN CHECK12/26/2002 1/3/2003 PASS
Plan Reviewer's activity  1/3/2003 PASS
Plans reviewed and approved as submitted with attached comment list. JCM
Plan resubmittals requested  1/2/2003  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING12/23/2002 12/26/2002 PASS
per plans and 2000 upc * roof drains C-2, 1% min.
Routing Off Site - STRUCTURAL12/16/2002 12/24/2002 FAIL
Contacted PDQ to take to outside eng. kmm Received comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING12/20/2002 12/23/2002 PASS
Approved per DRH02-186.
Routing - Erosion and Sediment12/19/2002 12/20/2002 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS12/17/2002 12/19/2002 FAIL
Requires drainage plan-Geotech failed.
Plans ACCEPTED BY PLAN TECH  12/17/2002 DONE
Routing - PLANNING Land Div12/16/2002 12/16/2002 PASS
Lot 4, Block 1, Blackeagle Subdivision.
Plans ACCEPTED BY PLAN TECH  12/16/2002 PEND
Requires two copies of ESC plan with application and three extra Civil sheets. Contacted Cornel Larson. kmm
Plan routing begun/NEW & ADDTN  12/16/2002  
Application received  12/13/2002  
Override - Parcel Holds  12/13/2002  
Recd Pcfee & Taken To Pln CK  12/13/2002 DONE
Override - Parcel Holds  12/13/2002  
Fee Review-notes12/13/200212/13/2002