Permit Information
Permit NumberBLD02-03011
StatusFinaled
Name SAIGON GRILL
Site Address 8053 W EMERALD ST
Project NameBOISE TOWN PLAZA-BLDG A
Customer Number 
ePlanReviewNo
Description
(SAIGON GRILL - BLDG A) This building is fire sprinklered for area increase. To construct a 2,457 square foot restaurant tenant space within an existing 18,000 square foot, one story, building. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, interior finishes, a grease hood, and suspended ceilings all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/16/200212/16/20028/10/2004 DONE
Fee Review-notes8/13/20038/13/20038/13/2003 DONE
First Notice 8/1/20038/1/2003 DONE
Permanent occupancy  8/1/2003 DONE
Perm. Occ. Cert. #9755 issued 8-1-03 to the Saigon Grill.
BLD-Final5/29/20035/30/20035/30/2003APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/29/2003 at 3:52:37 PM. Contact: ###-####.ok for a perm oc. 5/30/2003 12:05:50 PM
Permanent Occupancy 5/30/20035/30/2003 DONE
Details
BLD-Final5/15/20035/16/20035/16/2003ACANC
DetailsJim Sly
CALL 1ST BEFORE INSP BEFORE 10 -GARY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Contr will Re-cal insp for Russ. 5/16/2003 1:07:18 PM
FIRE-Final Inspection4/24/20034/25/20034/25/2003PPASS
DetailsRick Jackson
1:00 ###-####
BLD-Final4/24/20034/25/20034/25/2003PPART
DetailsRuss Owen
###-####ok temp oc. 2 items on c/n to address. 4/25/2003 4:12:37 PM
Temporary occupancy  4/25/2003 DONE
Temp. Occ. Cert. #4947 issued 4-25-03 to the Saigon Grill
BLD-Framing/Rough-in4/7/20034/7/20034/7/2003PPART
DetailsRuss Owen
gary; Phone #: ###-#### Internet Inspection Request from: Annette MooreOk ceiling. 4/7/2003 4:14:57 PM
BLD-Framing/Rough-in4/4/20034/4/20034/4/2003PFAIL
DetailsRuss Owen
gary celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Posted c/n. 4/4/2003 2:38:28 PM
Telephone call  3/12/2003 DONE
Telcon from Shaun at Fire Sentry enquiring if a FA permit is required to re.ocate/connect duct detectors and a cooking hood extinguishing system to the existing building fire sprinkler monitoring fire alarm system. Answer is YES, same as the answer I gave to Phil Omas, of Fire Sentry, 3/10/02.
BLD-Framing/Rough-in2/20/20032/20/20032/20/2003PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 2/20/2003 at 9:59:09 AM. Contact: ###-####.
BLD-Framing/Rough-in2/11/20032/12/20032/12/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/11/2003 at 14:53:10. Contact: ###-####.Ok just need to install rear braces after drywall on the tennant demising walls. 2/12/2003 1:01:35 PM
Issue PAID IN FULL permit  1/16/2003 DONE
Plan assigned to (CJW)12/23/2002 1/15/2003 PASS
DetailsCarl Westfall
1/15/2003 13:14:09 CJW - activity updated through activity BLDA022 from case BLD02-03011.
Routing - PLUMBING1/14/2003 1/15/2003 PASS
per plans and 2000 upc
Routing - PLAN CHECK1/15/2003 1/15/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/15/2003 PASS
Inspection Record Card- Bld  1/15/2003 DONE
Print Occupancy Form  1/15/2003 DONE
Telephone call  1/15/2003 DONE
permit ready and fees due
Routing - PLAN CHECK1/14/2003 1/14/2003 PASS
Drawings approved with conditions after resubmittal review.
Plan resubmittals received  1/14/2003 DONE
Resubmittal sheet P-2 received and forwarded to Carl Westfall.
Routing - FIRE1/9/2003 1/13/2003 PASS
Plan resubmittals received  1/13/2003 DONE
Resubmittal sheets one and two received and forwarded to Carl W.
Plan Review Completed(1st rev)  1/13/2003 DONE
Routing - PLAN CHECK1/3/2003 1/9/2003  
UBC plan review started January 8, 2003 and finished the next day. A response from the architect was required. See the conditions list.
Routing - PLUMBING12/31/2002 1/3/2003  
Failed first review. 1. upc 610 main water supply and branch to the urinals is undersized 2. upc table 6-4 use table 6-4 to calculate water demand. detail E pabe p-2.
Routing - PUBLIC WORKS12/23/2002 12/31/2002 PASS
Plans ACCEPTED BY PLAN TECH  12/17/2002 DONE
1. Plans not fully dimensioned.
Application received  12/16/2002  
Recd Pcfee & Taken To Pln CK  12/16/2002 DONE