Permit Information
Permit NumberBLD02-03022
StatusExpired
Name ST. PAUL BAPTIST CHURCH
Site Address 306 N 14TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(ST. PAULS BAPTIST CHURCH) This building is NOT fire sprinklered. To structurally retrofit existing roof trusses above the Sanctuary within an existing church building. Work is to include tension cables, collar ties, chord repairs, and wall anchors. The analysis of this building under this permit is limited to structural repairs only. A Certificate of Occupancy for this building was issued on October 3, 1994 and is on file. Occupancy of the sanctuary is not allowed until the work proposed under this permit is inspected and approved by the Engineer of Record. AFTER THE WALLS ARE REALIGNED AND MODIFICATIONS ARE COMPLETED, THE ENGINEER OF RECORD SHALL ADDRESS THE ADEQUACY OF THE STRUCTURAL SYSTEMS (WALLS AND TRUSSES) INCLUDING FIELD OBSERVATIONS IN A WRITTEN REPORT TO THE BUILDING DEPARTMENT. THIS REPORT IS REQUIRED BEFORE OCCUPANCY WILL BE ALLOWED. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired4/8/20044/8/20044/8/2004APASS
DetailsDave Hannah
Expired by inspector at 4/8/2004 9:38:38 AM
BLD-Aging Inspection4/7/20044/7/20044/7/2004 PASS
DetailsDave Hannah
FIRE-Final Inspection3/11/20033/12/20033/12/2003APASS
DetailsRick Jackson
###-#### call first to meet there all strcutural work 3/12/2003 10:18:40 AM
Letter of compliance  3/12/2003 DONE
Letter of Compliance #22833 issued 3-12-03.
BLD-Final3/10/20033/11/20033/11/2003APART
DetailsTom Arcoraci
HAROLD PLEASE CALL FIRST SO HE CAN LET YOU IN; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for perm when fire signs letter from eng on file 3/11/2003 11:30:01 AM
BLD-Framing/Rough-in2/26/20032/27/20032/27/2003APART
DetailsJim Sly
###-#### Insp of HD2B's and epoxy anchored bolts at floor joist/found wall. OK pending insp by special insp agency and Eng. of record........and their approval. 2/27/2003 11:36:28 AM
BLD-Framing/Rough-in2/19/20032/19/20032/19/2003PPART
DetailsCarl Dependahl
cable insp -harold ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...insp for repair & "replumb" of walls; under eng's supervision per plan & conversation w/Keith Jones, Eng'r. 2/20/2003 11:21:59 AM
BLD-Conference2/5/20032/7/20032/7/2003APASS
DetailsCarl Dependahl
PAT BIRD, eng'r...10:30, 3230199...at ahj 4800 Fairview....met at site work to commence under eng's observation, report to follow...slight change to use of stressing strands & appropriate jacks for cable/ ties...recommend roof/wall connection be addressed in future. 2/7/2003 11:42:52 AM
Issue PAID IN FULL permit  2/3/2003 DONE
Plan assigned to (CJW)12/23/2002 1/29/2003 PASS
DetailsCarl Westfall
1/29/2003 13:52:38 CJW - activity updated through activity BLDA022 from case BLD02-03022.
Routing - PLAN CHECK1/21/2003 1/29/2003 PASS
Drawings approved after review of January 27, 2003 resubmittal.
PLANS/APPL TAKEN TO FRONT DESK  1/29/2003 PASS
Inspection Record Card- Bld  1/29/2003 DONE
Telephone call  1/29/2003 DONE
permit ready and fees due
Plan resubmittals received  1/27/2003 DONE
Received one copy of resubmittal sheet S3.0 with cover letter. Routed to Carl Westfall.
Plan resubmittals received  1/21/2003 DONE
Received two copies of revised sheet S3.0, supplemental structural calculations and one copy or feview comment responses. Routed to Carl W. kmm
Routing - FIRE1/17/2003 1/21/2003 PASS
Plan Review Completed(1st rev)  1/21/2003 DONE
Routing - PLAN CHECK12/31/2002 1/17/2003  
Failed first UBC review. UBC plan review started January 16, 2002 and finished the next day. A response from the Engineer was required. See the conditions list.
Routing Off Site - STRUCTURAL1/6/2003 1/16/2003  
Failed first review by Consultant Engineer. Contacted PDQ to take to outside eng. kmm
Additional plans submitted  1/6/2003 DONE
Received one copy of sheets S1.0, S2.0 and structural claculations. routed to Carl W. kmm
Routing - PLANNING12/30/2002 12/31/2002 PASS
Approved per building plans and as noted on sheet S1.0, which states that new exterior materials and new exterior roofing, where occurs, shall match existing colors.
Routing - PUBLIC WORKS12/23/2002 12/30/2002 PASS
Plans ACCEPTED BY PLAN TECH  12/18/2002 DONE
Received two sets of plans with (2) sets of structural calculations and permit application.
First Notice12/17/200212/17/200212/17/2002 DONE
Application received  12/17/2002  
Recd Pcfee & Taken To Pln CK  12/17/2002  
Routing Off Site - STRUCTURAL1/22/2003    
Contacted PDQ to take revised plans of 1/21/03 to outside eng. kmm