BLD-Final | 10/29/2003 | 10/30/2003 | 10/30/2003 | A | DONE |
Russ Owen
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes done by 425. 10/29/2003 5:09:06 PM
|
BLD-Final | 10/29/2003 | 10/30/2003 | 10/29/2003 | A | PASS |
Dave Hannah
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 10/29/2003 5:37:14 AM
|
BLD-Grading Inspection | 10/29/2003 | 10/29/2003 | 10/29/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 7/7/2003 | 7/7/2003 | 7/7/2003 | P | PASS |
Dave Hannah
|
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover 7/7/2003 2:19:09 PM
|
BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Dave Hannah
|
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to insulate 7/2/2003 8:37:01 AM
|
BLD-Framing/Rough-in | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PART |
Dave Hannah
|
|
|
###-#### sean before 3 if posssible shear all c/n items completed ok to cover ext also trusses ok 6/20/2003 6:17:24 PM
|
BLD-Framing/Rough-in | 5/28/2003 | 5/29/2003 | 5/29/2003 | A | FAIL |
Dave Hannah
|
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Annette Moore shear fail c/n on site hold downs missing 5/29/2003 11:12:41 AM
|
BLD-Foundation | 3/6/2003 | 3/7/2003 | 3/7/2003 | A | PART |
Dave Hannah
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Annette Moore rebar in forms at about 85% 3/7/2003 9:34:54 AM
|
BLD-Footing | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Dave Hannah
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Conference | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | DONE |
Steven Webb
|
|
|
Test with T. Records only. 3/5/2003 3:17:51 PM
|
BLD-Grading Inspection | 3/3/2003 | 3/3/2003 | 3/3/2003 | | DONE |
Rita DeYoung
|
|
|
Footing subgrade for main level of house is approved by the geotechnical engineer
|
BLD-Foundation | 2/7/2003 | 2/10/2003 | 2/10/2003 | A | PART |
Dave Hannah
|
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie basement walls 2/10/2003 11:36:54 AM
|
BLD-Footing | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | PART |
Dave Hannah
|
|
|
###-#### basement footing ok to pour 2/4/2003 11:11:59 AM
|
BLD-Grading Inspection | 2/4/2003 | 2/4/2003 | 2/4/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade.
|
Issue PAID IN FULL permit | | | 1/9/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 1/8/2003 | 1/8/2003 | 1/8/2003 | | PASS |
Dan Overy
|
|
|
1/8/2003 08:59:48 DJO - activity updated through activity BLDA022 from case BLD02-03031.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/8/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 1/8/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/8/2003 | | DONE |
|
|
|
permit ready
|
Plans ACCEPTED BY PLAN CHECK | | | 1/8/2003 | | |
|
|
|
|
Routing - FIRE | 12/24/2002 | | 12/27/2002 | | DONE |
|
|
|
No fire sprinklers required (Lot 12, Block 12, Nativa Terrace).
|
Routing - Erosion and Sediment | 12/23/2002 | | 12/23/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING | 12/19/2002 | | 12/20/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/19/2002 | | 12/19/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/18/2002 | | 12/19/2002 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1, CFH02-00043, with conditions of approval in letter attached to the plan.
|
Application received | | | 12/18/2002 | | |
|
|
|
|
Pending Assignment by DJO | 12/18/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/27/2002 | | | | |
|
|
|
|