Fee Review-notes | 12/20/2002 | 12/20/2002 | 8/10/2004 | | DONE |
|
|
|
|
First Notice | | 10/22/2003 | 10/22/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/22/2003 | | DONE |
|
|
|
Perm. Occ. Cert. # 9848 issued 10-22-03 to Lithia Auto Body.
|
Permanent Occupancy | | 10/21/2003 | 10/21/2003 | | DONE |
|
|
|
|
BLD-Final | 10/20/2003 | 10/21/2003 | 10/21/2003 | A | PASS |
Russ Owen
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Ok perm oc. 10/20/2003 6:00:07 PM
|
BLD-Final | 10/8/2003 | 10/8/2003 | 10/8/2003 | P | FAIL |
Russ Owen
|
|
|
Dennis, ###-#### - please call 1st so he can meet you there stil has not completed prior c/n. 10/8/2003 5:00:51 PM
|
Code Occupancy Approval | 10/3/2003 | 10/3/2003 | 10/3/2003 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met/ 10/3/2003 12:22:06 PM
|
Temporary occupancy | | | 7/21/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4972 issued 7-21-03 to Lithia Real Estate, Inc.
|
BLD-Final | 7/17/2003 | 7/18/2003 | 7/18/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 5:04:10 PM. . would be ok for a temp oc if fire/lifesafety approved , c/n posted by me for other item.. 7/18/2003 5:38:19 PM 7/18/2003 5:39:39 PM
|
FIRE-Final Inspection | 7/18/2003 | 7/18/2003 | 7/18/2003 | P | PASS |
Rick Jackson
|
|
|
don -- ###-####
|
BLD-Framing/Rough-in | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PASS |
Russ Owen
|
|
|
martin grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Grid ok,I have a detail for 1 hr fire wall at deck also from architect.. 7/8/2003 11:35:24 AM
|
BLD-Framing/Rough-in | 6/26/2003 | 6/26/2003 | 6/26/2003 | P | PART |
Russ Owen
|
|
|
new detail for entry way droped soffit support. 6/27/2003 12:42:48 PM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | PART |
Russ Owen
|
|
|
there is a soffit hanging down at the entry aea that needs detailing, I posted a c/n. also recived a letter from architect about the 1 hr wall termination they will stop at the ceiling assembly as can not be done as typical detail shows on plans.. 6/18/2003 1:54:23 PM 6/18/2003 1:54:52 PM 6/18/2003 1:55:13 PM
|
BLD-Conference | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | PART |
Russ Owen
|
|
|
Stoped by to check progress, talked with framer he has supplied letter of intent for fire wall to stop at roof assembly and addressed the continuity of the 1 hr wall at the north side that was not detailed on plans,which will be a shaft wall, also there is a droped soffit hard lid that needs to be addressed at the waiting room and east end small exterior side building need roof froming detail, will be back at an am inspection to go over these items in detal and leave a request for info. 6/16/2003 5:38:45 PM
|
BLD-Framing/Rough-in | 6/3/2003 | 6/3/2003 | 6/3/2003 | P | FAIL |
Russ Owen
|
|
|
george; Phone #: ###-#### Internet Inspection Request from: Annette Moore. c/n posted/fire wall. 6/3/2003 5:29:17 PM
|
BLD-Framing/Rough-in | 5/29/2003 | 5/29/2003 | 5/29/2003 | P | PART |
Russ Owen
|
|
|
george; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Went over general requirements did tell them to get details for fire wall continuity, and also needs alltrades signed off prior to a frame inspection. 5/29/2003 5:50:03 PM
|
BLD-Framing/Rough-in | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/20/2003 at 2:10:48 PM. Contact: ###-####.Front entry ok for canopy brakets. 5/21/2003 2:38:26 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | FAIL |
Russ Owen
|
|
|
Posted a c/n also talked with engineer about front canopy he will field verify. 5/19/2003 11:49:40 AM
|
BLD-Framing/Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | FAIL |
Jim Sly
|
|
|
martin store front only; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walked the whole jobsite incl lithia motors and can't find any supers............. 5/16/2003 9:27:24 AM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 9:36:19 AM. Contact: ###-####. out of time 5/16/2003 4:44:00 PM
|
BLD-Framing/Rough-in | 5/7/2003 | 5/7/2003 | 5/7/2003 | P | PART |
Russ Owen
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore Roof area ok will get an insulation so as to comply with energy code.5/8/2003 9:48:14 AM 5/8/2003 9:49:05 AM
|
BLD-Other | 4/4/2003 | 4/7/2003 | 4/7/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/4/2003 at 1:39:15 PM. Went over occupancy at front reception. 4/7/2003 4:16:12 PM
|
BLD-Footing | 3/18/2003 | 3/18/2003 | 3/18/2003 | P | PART |
Russ Owen
|
|
|
Work requires special inspection. 3/18/2003 4:30:33 PM
|
(F) Reprint permit | | | 3/13/2003 | | |
|
|
|
|
BLD-Footing | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PART |
Jim Storey
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore south and west end of ft and grade beams rebar ok special insp approved. 3/12/2003 9:27:37 AM
|
Issue PAID IN FULL permit | | | 3/11/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 2/28/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/28/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/28/2003 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PLAN CHECK | 2/27/2003 | | 2/28/2003 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 12/23/2002 | | 2/28/2003 | | PASS |
John Menard
|
|
|
2/28/2003 08:53:33 JCM - activity updated through activity BLDA022 from case BLD02-03042.
|
Plan Reviewer's activity | | | 2/27/2003 | | PASS |
|
|
|
Resubmittals reviewed and approved as submitted. JCM
|
Routing - PLANNING Land Div | 2/26/2003 | | 2/27/2003 | | PASS |
|
|
|
Approved. New deed describing entire parcel was recorded and new tax parcel number as assigned.
|
Routing - PLAN CHECK | 2/21/2003 | | 2/26/2003 | | |
|
|
|
|
Plan resubmittals received | | | 2/25/2003 | | DONE |
|
|
|
Received response letter to plan review comments. Routed to John M. kmm
|
Plan Review Completed(1st rev) | | | 2/21/2003 | | FAIL |
|
|
|
|
Routing - FIRE | 2/19/2003 | | 2/21/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/13/2003 | | 2/19/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 2/19/2003 | | |
|
|
|
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLUMBING | 2/6/2003 | | 2/13/2003 | | PASS |
|
|
|
water heaters located 8' above finish floor will require a ladder permanently fastened to the building, oil and flammable liquids interceptor will be 1500 gals. if an automatic soap dispensor is installed at the mop sink provide a water supply for it, additional cross connection protection may be required at the vending areas.
|
Plan resubmittals received | | | 2/10/2003 | | DONE |
|
|
|
Received license agreement. Put one copy in file and routed second copy to John Menard. KMM
|
Routing - PLANNING | 1/29/2003 | | 2/6/2003 | | PASS |
|
|
|
Marty Santoyo approved per DRH02-00107 on 2/6/03.
Mark Pecchenino, approved per CUP02-00101 on 1/30/03.
|
Routing - Erosion and Sediment | 1/28/2003 | | 1/29/2003 | | PASS |
|
|
|
ESC (ESC02-00737) under Grading permit BLD02-02791
|
Routing - PUBLIC WORKS | 12/23/2002 | | 1/28/2003 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/13/2003 | | 1/16/2003 | | PASS |
|
|
|
Contacted PDQ to take resubmitted information of 1/13/03 to outside eng. kmm Received a fax from the consulting structural engineer approving the resubmittals. JCM
|
Plan resubmittals received | | | 1/13/2003 | | DONE |
|
|
|
Received one copy of respone letter and report of geotechnical investigation. Routed to John M. kmm
|
Plan resubmittals requested | | | 1/2/2003 | | |
|
|
|
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 12/23/2002 | | 12/27/2002 | | FAIL |
|
|
|
called pdq to send to outside engineering. dkl Received a comment list from the consulting structural engineer requesting revisions. JCM
|
Additional plans submitted | | | 12/23/2002 | | DONE |
|
|
|
Received (3) copies of structural calculations for pre-engineered building. Attached with plans.
|
Override - Parcel Holds | | | 12/23/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 12/23/2002 | | 12/23/2002 | | FAIL |
|
|
|
This building is proposed over an existing parcel line. Need to record new deed describing entire parcel by metes and bounds description as one parcel. Allowed BLD02-02435 to proceed with stipulation that no Certificate of Occupancy would be issued until a deed is recorded describing the entire parcel by metes and bounds description.
2/10/03 Planning Land Division parcel tag was removed as all conditions have been met. kmm
|
Override - Parcel Holds | | | 12/20/2002 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2002 | | DONE |
|
|
|
1. Informed applicant that (3) structural calculations on the pre-engineered building will be required. They will bring in Monday 12-23-02.
Received three complete set of plans, (3) structural calculations, (2) Project Manuals, (1) letter from United Water, (1) set of parcel legal description), and (1) permit application.
|
Application received | | | 12/20/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 12/20/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2002 | | DONE |
|
|
|
|