Case Summary (BLD) | | | 9/15/2003 | | |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/5/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9575 issued 3-5-03 to the Wicklund Consulting Group, Inc.
|
BLD-Final | 3/6/2003 | 3/4/2003 | 3/4/2003 | P | PASS |
Russ Owen
|
|
|
ok for a perm oc, added this in on 3/6/03, my pc is down for repairs. 3/6/2003 1:26:31 PM
|
Permanent Occupancy | | 3/4/2003 | 3/4/2003 | | DONE |
|
|
|
|
BLD-Final | 3/3/2003 | 3/3/2003 | 3/3/2003 | P | NR |
Russ Owen
|
|
|
###-#### randy . Still working , called contractor will recall when ready. 3/3/2003 5:29:57 PM
|
BLD-Final | 2/27/2003 | 2/28/2003 | 2/28/2003 | P | FAIL |
Russ Owen
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. I called and left message with Randy, He called me back and I told him that at the time they paid the sewer fees, that same person was given information on the work area that was required to be accessible, as was indicated on permit writing. He said he will lower the cabinets to 34". NOTE: originally the sink had been crossed out on the floor plan, and apperently they elected not to put it in, and pulled a permit after plans were issued.Sewer fee have now been paid. 2/28/2003 4:01:07 PM
|
Meeting | | | 2/18/2003 | | DONE |
|
|
|
Contractor came in to review accessibility requirements for counters with outlets, swithches, controls, etc. and reach ranges needed for accessibility. A sink had been installed in a counter area after the permit was issued with the sink installation crossed off by the applicant. It was also noted by the structural inspector, Russ Owen, that outlets, etc. located at the back of the base cabinets are questionable or access based onn the height of the base cabinets exceeding 34" above finish floor. I reviewed this with the contractor, gave him a copy of the reach range's from Boise City Accessibility Guide book and obtained sewer use fee's from Louise Waldorf, PW, and gave same to contractor. Contractor paid fee's to Rita at permit desk. Contractor to call for reinspection when modifications completed in base cabinet areas.
|
BLD-Final | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | FAIL |
Russ Owen
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n. 2/13/2003 4:59:24 PM
|
BLD-Final | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | CANC |
Russ Owen
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. This inspection was phoned in by the electrical contractor he wanted an electrical final not a building final. 2/12/2003 1:31:40 PM
|
BLD-Framing/Rough-in | 1/21/2003 | 1/22/2003 | 1/22/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/21/2003 at 12:58:53. Contact: ###-####. ok per plan. 1/22/2003 10:41:59 AM
|
Issue PAID IN FULL permit | | | 1/14/2003 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 12/24/2002 | | 1/9/2003 | | PASS |
Dan Stuart
|
|
|
1/9/2003 14:00:22 DRS - activity updated through activity BLDA022 from case BLD02-03043.
|
Routing - PLAN CHECK | 12/26/2002 | | 1/9/2003 | | PASS |
|
|
|
Approved as noted and attached.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/9/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/9/2003 | | |
|
|
|
|
Telephone call | | | 1/9/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/2002 | | DONE |
|
|
|
Accepted per Dan S. kmm
|
First Notice | 12/20/2002 | 12/20/2002 | 12/20/2002 | | DONE |
|
|
|
|
Application received | | | 12/20/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2002 | | DONE |
|
|
|
|