Permit Information
Permit NumberBLD02-03048
StatusExpired
Name IDAHO STATE LIQUOR DISPENSORY
Site Address 5180 W OVERLAND RD
Project NameHILLCREST SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(IDAHO STATE LIQUOR DISPENSORY) This building is fire sprinklered for building area increase. To remodel an existing 4,806 square foot tenant space for an existing tenant. This tenant space is located in a 288,657 square foot, one story, retail sales strip mall shopping center. Work is to include a restroom accessible to the disabled, a new landing at the main entrance doors (South wall), new doors in an existing opening in the North wall, a new landing at the new doors, and new lay-in ceiling tile all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 10/23/20034/26/2005 DONE
BLD-Aging Inspection1/15/20041/15/20041/15/2004 PASS
DetailsTom Arcoraci
DOC - Permit Expired1/15/20041/15/20041/15/2004APASS
DetailsTom Arcoraci
Expired by inspector at 1/15/2004 9:25:30 AM
BLD-Final10/22/200310/23/200310/23/2003APASS
DetailsTom Arcoraci
Letter of compliance  10/23/2003 DONE
Leter of Compliance #24311 issued 10-23-03.
FIRE-Final Inspection10/22/200310/22/200310/22/2003APASS
DetailsTroy Cobbley
Fire sprinklers, fire alarm and fire life safety OK
BLD-Aging Inspection9/8/20039/8/20039/8/2003 NR
DetailsTom Arcoraci
needs fire 9/8/2003 9:03:33 AM
BLD-Final4/29/20034/30/20034/30/2003PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/29/2003 at 12:53:49 PM. Contact: ###-####.
FIRE-Final Inspection3/13/20033/14/20033/14/2003AFAIL
DetailsTroy Cobbley
###-####. Provide testing and sign off of the fire alarm permit, provide sign off of fire sprinkler permit, fire extinguishers are mounted too high and one is due for reinspection, remove thumbturns on all doors, per general notes on front page of approved drawings all door hardware is to be retrofitted for ADA compliance, repair or replace exit sign at front exit/entry 3/14/2003 12:59:25 PM 3/14/2003 1:00:00 PM
BLD-Final3/13/20033/14/20033/14/2003PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/13/2003 at 4:49:29 PM. Contact: ###-####.
BLD-Framing/Rough-in2/13/20032/14/20032/14/2003PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/13/2003 at 11:18:13 AM. Contact: ###-####.
BLD-Conference2/3/20032/4/20032/4/2003ADONE
DetailsRuss Owen
Scheduled by a contractor via Hello! on 2/3/2003 at 4:28:14 PM. Contact: ###-####.Needsd to call for a framing inspection of rest room when r-i are done no new work on grid ceiling just replacement of grid, plans show adding ramp at entry for hight door for access contractor does not want to do this told him need to check with proje architect and plan review. 2/4/2003 12:53:15 PM
Print Occupancy Form  2/3/2003 DONE
Issue PAID IN FULL permit  1/24/2003 DONE
Print Occupancy Form  1/24/2003 DONE
Routing - PLAN CHECK1/8/2003 1/22/2003 PASS
(1-21-03) Rejected resubmittal because it was not to scale and some notes were incorrect. Called the architects rep. and asked for resubmittals. (1-22-03) The drawings were approved, with conditions, after the resubmittal review.
Plan resubmittals received  1/22/2003 DONE
received two copies of revised sheet A-1.1 Routed to Carl W. kmm
PLANS/APPL TAKEN TO FRONT DESK  1/22/2003 PASS
Inspection Record Card- Bld  1/22/2003 DONE
Telephone call  1/22/2003 DONE
CALLED 1-22-03
Plan assigned to (CJW)12/24/2002 1/22/2003 PASS
DetailsCarl Westfall
1/22/2003 16:21:42 CJW - activity updated through activity BLDA022 from case BLD02-03048.
Plan resubmittals received  1/21/2003 DONE
Received copy of arch/eng. record form. Put one with file and routed copy to Carl
W. One copy of response letter. Two copies of revised sheet A-11. Routed to Carl W. kmm
Routing - FIRE1/3/2003 1/7/2003 PASS
Plan Review Completed(1st rev)  1/7/2003 DONE
Routing - PLAN CHECK12/30/2002 1/3/2003  
Failed first UBC review. UBC plan review started December 31, 2002 and finished January 3, 2003. A response from the architect was required. See the conditions list.
Routing - PUBLIC WORKS12/24/2002 12/30/2002 PASS
Application received  12/23/2002  
Recd Pcfee & Taken To Pln CK  12/23/2002 DONE
Plans ACCEPTED BY PLAN TECH  12/23/2002 PEND
Requires arch/eng record form. Faxed one to Cricket L. kmm
Fee Review-notes12/23/200212/23/2002