Permit Information
Permit NumberBLD02-03049
StatusFinaled
Name CORNERSTONE INVESTORS LLC
Site Address 1745 N FIVE MILE RD
Project NameSpeedy Clean Car Wash
Customer Number 
ePlanReviewNo
Description
To construct a new 3,234 sq. ft. one story Type VN car wash with three self-serve bays and one automatic bay. Other work includes all site improvements, paving and landscaping per approved plans and attachments DRH02-00192 CUP02-00105
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  1/13/2010 DONE
DetailsTisha Gallop
occupancy certificate never issued when permit was finaled. will mail this to occupant.
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice Sent 8/4/20044/26/2005 DONE
First Notice Sent 8/4/20044/26/2005 DONE
Fee Review-notes12/23/200212/23/20028/10/2004 DONE
DOC - Permit Finaled8/4/20048/4/20048/4/2004PPASS
DetailsJim Sly
Finaled by inspector at 8/4/2004 6:02:53 PM
DOC - Permit Finaled8/4/20048/4/20048/4/2004PPASS
DetailsJim Sly
Finaled by inspector at 8/4/2004 6:02:47 PM
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsJim Sly
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsJim Sly
Letter of compliance  6/23/2003 DONE
Letter of Compliance #22952 issued 6-20-03.
PubWorks Occupancy Approval6/20/20036/20/20036/20/2003 DONE
Drainage project complete, signed permanent occupancy 6/20/03. M.Strasser
FIRE-Final Inspection6/18/20036/19/20036/19/2003APASS
DetailsTroy Cobbley
fire life safety finaled 6/19/2003 2:00:15 PM
BLD-Final6/19/20036/19/20036/19/2003PPASS
DetailsJim Sly
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Perm Occ. 6/20/2003 2:53:55 PM
BLD-Final6/18/20036/18/20036/18/2003PFAIL
DetailsJim Sly
MIKE; Phone #: ###-#### Internet Inspection Request from: Annette Moore Need all Req signatures. 6/18/2003 3:58:04 PM
BLD-Framing/Rough-in4/23/20034/23/20034/23/2003PFAIL
DetailsJim Sly
###-#### Lat bracing 4/23/2003 3:49:18 PM
Override - Parcel Holds  4/23/2003  
BLD-Framing/Rough-in4/10/20034/11/20034/11/2003APART
DetailsJim Sly
ROD ###-#### Roof diaphram nailing OK. 4/11/2003 12:35:45 PM
Override - Parcel Holds  4/10/2003  
BLD-Foundation3/13/20033/14/20033/14/2003APASS
DetailsJim Sly
rod ###-####
Override - Parcel Holds  3/13/2003  
Routing - PLUMBING3/11/2003 3/12/2003 PASS
Resubmitted plans of 3/10/03 water line to hose bib at r.v. dump station must be equipped with an r.p., post hose bib by building service enterance with a sign, 2'x2' stating "potable water. not to be used for flushing waste tanks."
BLD-Footing3/7/20033/10/20033/10/2003APASS
DetailsJim Sly
ROD; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Plan resubmittals received  3/10/2003 DONE
Recived three copies of revised sheet P-1b. Routed to PW for Walt and to plumb. Put one approved copy in records and routed two copies to Jim Sly. kmm
Routing - PUBLIC WORKS3/10/2003 3/10/2003 PASS
Resubmitted plans of 3/10-/03, When done in PW, route to plumbing. kmm
BLD-Footing3/6/20033/7/20033/7/2003PCANC
DetailsRuss Owen
ROD; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Grading Inspection3/7/20033/7/20033/7/2003PCANC
DetailsRita DeYoung
runoff for parking lot; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
(F) Reprint permit  2/25/2003  
Issue PAID IN FULL permit  2/24/2003  
Plan assigned to (MLO)12/26/200212/26/20022/6/2003 PASS
DetailsMike Otto
2/6/2003 11:47:57 MLO - activity updated through activity BLDA022 from case BLD02-03049.
Routing Off Site - STRUCTURAL1/29/2003 2/6/2003 PASS
Contacted PDQ to take revised plans of 1/29/03 to outside eng.
PLANS/APPL TAKEN TO FRONT DESK  2/6/2003 DONE
Inspection Record Card- Bld  2/6/2003 DONE
Print Occupancy Form  2/6/2003 DONE
Telephone call  2/6/2003 DONE
permit ready and fees due
Routing - PUBLIC WORKS2/3/2003 2/3/2003 PASS
Routing - PUBLIC WORKS1/30/2003 1/31/2003 PASS
Routing - PLANNING1/29/2003 1/30/2003 PASS
Approved per DRH02-192.
Routing - PLUMBING1/30/2003 1/30/2003 PASS
1. restroom water lines needs double check valve 2. need shut off valve in 2 inch prior to bathroom tie in.
Plan resubmittals received  1/29/2003 DONE
Received one copy of revised sheets A-3b, A-6b, A-7b and one copy of response to plan check. Routed to Mike O. kmm
Routing - PLAN CHECK1/28/2003 1/28/2003 PASS
Plan resubmittals received  1/28/2003 DONE
Received two sets of resubmittal sheets A-3B, A-6B, A-7B, P-1B, and (2) Structural calculations. Routed to Mike Otto. Resubmittal short one set for offsite structural review. Architect contacted. MLO
Routing - FIRE1/27/2003 1/28/2003 PASS
no corrections required
Routing Off Site - STRUCTURAL1/2/2003 1/27/2003 FAIL
Contacted PDQ to take plans to outside eng. kmm
Plan resubmittals requested  1/27/2003 DONE
UBC corrections
Routing - PLAN CHECK1/22/2003 1/27/2003 FAIL
corrections faxed and mailed to architect
Routing - PLUMBING1/15/2003 1/22/2003 FAIL
1. floor drain vents cannot combine below slab, must be 6 inches above floord level rims-sht p-1b equipment room 2. reclaim tank #1 needs vent from outlet pipe and a cleanout. 3. cross sectional area venting of building sewer is not met with 2- 2 inch vnets-one needs to be a 3 inch vent though roof. 4. building reduced pressure backflow needs air gap and drain to floor drain 5. water supply to restroom needs a seperate backflow installed prior to building backflow. 6. vent for 1500 gal interceptor must be installed between tank and 4 inch branch 7. vent for 1500 gal tank must be 5 inch. 8. outlets from sediment boxes need santee with drop leg.
Routing - PLANNING1/9/2003 1/15/2003 FAIL
Approver per CUP02-00105, sent to design review 1/13/03 MAP

Failed for DR approval. Still awaiting updated site and landscape plans required per DR approval. Architect has been notified. SMS
Routing - Erosion and Sediment1/7/2003 1/9/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS12/26/2002 1/7/2003 FAIL
Requires Drainage plan revision. kmm
Pending Assignment by MYS12/24/2002 12/26/2002 DONE
DetailsMarlene Southard
12/26/2002 09:40:58 DKL - activity updated through activity BLDA174 from case BLD02-03049.
Routing - PLANNING Land Div12/24/2002 12/26/2002 PASS
Approved, parcel has existing water treatment building with no land divisions since issuance of prior building permit.
Plans ACCEPTED BY PLAN TECH  12/24/2002 DONE
Application received  12/23/2002  
Recd Pcfee & Taken To Pln CK  12/23/2002 DONE
First Notice 1/23/2010