Permanent Occupancy | | | 1/13/2010 | | DONE |
Tisha Gallop
|
|
|
occupancy certificate never issued when permit was finaled. will mail this to occupant.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 8/4/2004 | 4/26/2005 | | DONE |
|
|
|
|
First Notice Sent | | 8/4/2004 | 4/26/2005 | | DONE |
|
|
|
|
Fee Review-notes | 12/23/2002 | 12/23/2002 | 8/10/2004 | | DONE |
|
|
|
|
DOC - Permit Finaled | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 8/4/2004 6:02:53 PM
|
DOC - Permit Finaled | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 8/4/2004 6:02:47 PM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Jim Sly
|
|
|
|
Letter of compliance | | | 6/23/2003 | | DONE |
|
|
|
Letter of Compliance #22952 issued 6-20-03.
|
PubWorks Occupancy Approval | 6/20/2003 | 6/20/2003 | 6/20/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 6/20/03. M.Strasser
|
FIRE-Final Inspection | 6/18/2003 | 6/19/2003 | 6/19/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 6/19/2003 2:00:15 PM
|
BLD-Final | 6/19/2003 | 6/19/2003 | 6/19/2003 | P | PASS |
Jim Sly
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Perm Occ. 6/20/2003 2:53:55 PM
|
BLD-Final | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | FAIL |
Jim Sly
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Annette Moore Need all Req signatures. 6/18/2003 3:58:04 PM
|
BLD-Framing/Rough-in | 4/23/2003 | 4/23/2003 | 4/23/2003 | P | FAIL |
Jim Sly
|
|
|
###-#### Lat bracing 4/23/2003 3:49:18 PM
|
Override - Parcel Holds | | | 4/23/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 4/10/2003 | 4/11/2003 | 4/11/2003 | A | PART |
Jim Sly
|
|
|
ROD ###-#### Roof diaphram nailing OK. 4/11/2003 12:35:45 PM
|
Override - Parcel Holds | | | 4/10/2003 | | |
|
|
|
|
BLD-Foundation | 3/13/2003 | 3/14/2003 | 3/14/2003 | A | PASS |
Jim Sly
|
|
|
rod ###-####
|
Override - Parcel Holds | | | 3/13/2003 | | |
|
|
|
|
Routing - PLUMBING | 3/11/2003 | | 3/12/2003 | | PASS |
|
|
|
Resubmitted plans of 3/10/03 water line to hose bib at r.v. dump station must be equipped with an r.p., post hose bib by building service enterance with a sign, 2'x2' stating "potable water. not to be used for flushing waste tanks."
|
BLD-Footing | 3/7/2003 | 3/10/2003 | 3/10/2003 | A | PASS |
Jim Sly
|
|
|
ROD; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Plan resubmittals received | | | 3/10/2003 | | DONE |
|
|
|
Recived three copies of revised sheet P-1b. Routed to PW for Walt and to plumb. Put one approved copy in records and routed two copies to Jim Sly. kmm
|
Routing - PUBLIC WORKS | 3/10/2003 | | 3/10/2003 | | PASS |
|
|
|
Resubmitted plans of 3/10-/03, When done in PW, route to plumbing. kmm
|
BLD-Footing | 3/6/2003 | 3/7/2003 | 3/7/2003 | P | CANC |
Russ Owen
|
|
|
ROD; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Grading Inspection | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | CANC |
Rita DeYoung
|
|
|
runoff for parking lot; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
(F) Reprint permit | | | 2/25/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/24/2003 | | |
|
|
|
|
Plan assigned to (MLO) | 12/26/2002 | 12/26/2002 | 2/6/2003 | | PASS |
Mike Otto
|
|
|
2/6/2003 11:47:57 MLO - activity updated through activity BLDA022 from case BLD02-03049.
|
Routing Off Site - STRUCTURAL | 1/29/2003 | | 2/6/2003 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 1/29/03 to outside eng.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/6/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2003 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PUBLIC WORKS | 2/3/2003 | | 2/3/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/30/2003 | | 1/31/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 1/29/2003 | | 1/30/2003 | | PASS |
|
|
|
Approved per DRH02-192.
|
Routing - PLUMBING | 1/30/2003 | | 1/30/2003 | | PASS |
|
|
|
1. restroom water lines needs double check valve 2. need shut off valve in 2 inch prior to bathroom tie in.
|
Plan resubmittals received | | | 1/29/2003 | | DONE |
|
|
|
Received one copy of revised sheets A-3b, A-6b, A-7b and one copy of response to plan check. Routed to Mike O. kmm
|
Routing - PLAN CHECK | 1/28/2003 | | 1/28/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/28/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets A-3B, A-6B, A-7B, P-1B, and (2) Structural calculations. Routed to Mike Otto. Resubmittal short one set for offsite structural review. Architect contacted. MLO
|
Routing - FIRE | 1/27/2003 | | 1/28/2003 | | PASS |
|
|
|
no corrections required
|
Routing Off Site - STRUCTURAL | 1/2/2003 | | 1/27/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. kmm
|
Plan resubmittals requested | | | 1/27/2003 | | DONE |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 1/22/2003 | | 1/27/2003 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Routing - PLUMBING | 1/15/2003 | | 1/22/2003 | | FAIL |
|
|
|
1. floor drain vents cannot combine below slab, must be 6 inches above floord level rims-sht p-1b equipment room 2. reclaim tank #1 needs vent from outlet pipe and a cleanout. 3. cross sectional area venting of building sewer is not met with 2- 2 inch vnets-one needs to be a 3 inch vent though roof. 4. building reduced pressure backflow needs air gap and drain to floor drain 5. water supply to restroom needs a seperate backflow installed prior to building backflow. 6. vent for 1500 gal interceptor must be installed between tank and 4 inch branch 7. vent for 1500 gal tank must be 5 inch. 8. outlets from sediment boxes need santee with drop leg.
|
Routing - PLANNING | 1/9/2003 | | 1/15/2003 | | FAIL |
|
|
|
Approver per CUP02-00105, sent to design review 1/13/03 MAP
Failed for DR approval. Still awaiting updated site and landscape plans required per DR approval. Architect has been notified. SMS
|
Routing - Erosion and Sediment | 1/7/2003 | | 1/9/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 12/26/2002 | | 1/7/2003 | | FAIL |
|
|
|
Requires Drainage plan revision. kmm
|
Pending Assignment by MYS | 12/24/2002 | | 12/26/2002 | | DONE |
Marlene Southard
|
|
|
12/26/2002 09:40:58 DKL - activity updated through activity BLDA174 from case BLD02-03049.
|
Routing - PLANNING Land Div | 12/24/2002 | | 12/26/2002 | | PASS |
|
|
|
Approved, parcel has existing water treatment building with no land divisions since issuance of prior building permit.
|
Plans ACCEPTED BY PLAN TECH | | | 12/24/2002 | | DONE |
|
|
|
|
Application received | | | 12/23/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/23/2002 | | DONE |
|
|
|
|
First Notice | | 1/23/2010 | | | |
|
|
|
|