Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD02-03053
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 6015 W OVERLAND RD Unit: 105
Project NameOVERLAND ROAD COMMERCIAL
Customer Number 
ePlanReviewNo
Description
(KAUFMAN & KAUFMAN INSURANCE) To finish a 2,680 sq. ft. office space within an existing shell building per approved plans and attachments. Shell permit is BLD02-03054
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/24/200212/24/20028/10/2004 DONE
FIRE-Final Inspection3/10/20043/11/20043/11/2004APASS
DetailsRick Jackson
Please call 30 mins prior to inspection///robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fire/life safety okay 3/11/2004 8:33:59 AM
First Notice 3/11/20043/11/2004 DONE
Permanent Occupancy 3/11/20043/11/2004 DONE
Details
Permanent occupancy  3/11/2004 DONE
Perm. Occ. Cert. # 10028 issued 3-11-04 to Kaufman and Kaufman.
FIRE-Final Inspection3/9/20043/10/20043/10/2004AFAIL
DetailsTroy Cobbley
Duct smoke detectors have been installed but they do not shut down the hvac units when activated 3/10/2004 9:57:06 AM
BLD-Framing/Rough-in2/10/20042/12/20042/12/2004ACANC
DetailsTom Arcoraci
Robbie; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Final Inspection2/10/20042/12/20042/12/2004AFAIL
DetailsTroy Cobbley
provide duct smoke detectors for unit shut down on both units 2/12/2004 10:23:23 AM
BLD-Final2/12/20042/12/20042/12/2004APART
DetailsTom Arcoraci
ok pending fire final
Office Staff conference/action  10/24/2003 DONE
Temp. Occ. Cert. extended thru 11-7-03 per Tim Hogland.
BLD-Final7/25/20037/25/20037/25/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 7/25/2003 at 11:14:25 AM. Contact: ###-####.Went to job card does not have all required signatures. 7/25/2003 3:27:21 PM
BLD-Final7/25/20037/25/20037/25/2003PPART
DetailsTom Arcoraci
Ok for temp. occ.
Temporary occupancy  7/25/2003 DONE
Temp. Occ. Cert. #4977 issued 7-25-03 to Kaufman and Kaufman Insurance.
BLD-Final7/16/20037/18/20037/18/2003ANR
DetailsTom Arcoraci
###-#### jed
FIRE-Final Inspection7/16/20037/17/20037/17/2003PFAIL
DetailsTroy Cobbley
###-#### jed Provide the second fire hydrant as per plan sheet C1.0. Provide automatic shutdown for the hvac units. Provide "No Parking-Fire Dept. Turn Around" sign on fence between builidings. Provide approved door hardware on doors for access to the common restrooms and conference room 7/17/2003 4:18:41 PM
FIRE-Final Inspection7/15/20037/16/20037/16/2003AFAIL
DetailsRick Jackson
jed - ###-#### shell permit not signed off; will need address and suite numbers 7/16/2003 8:35:59 AM
Print Occupancy Form  7/16/2003 DONE
BLD-Framing/Rough-in3/27/20033/27/20033/27/2003PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/27/2003 at 9:39:21 AM. Contact: ###-####. cn posted ok to insulate walls only 3/27/2003 3:43:08 PM
Issue PAID IN FULL permit  2/18/2003 DONE
(F) Reprint permit  2/18/2003 DONE
Inspection Record Card- Bld  1/31/2003 DONE
Plan assigned to (MLO)12/26/200212/26/20021/30/2003 PASS
DetailsMike Otto
1/30/2003 09:33:16 MLO - activity updated through activity BLDA022 from case BLD02-03053.
PLANS/APPL TAKEN TO FRONT DESK  1/30/2003 DONE
Routing - Erosion and Sediment1/23/2003 1/29/2003 PASS
ESC approved with conditions attached to plans.
Plan resubmittals received  1/24/2003 DONE
Received two copies of ESC plan and narrative. Put with plans. kmm
Routing - PLUMBING1/16/2003 1/22/2003 PASS
see shell for review comments
Routing - PLAN CHECK1/16/2003 1/16/2003 PASS
Routing - PLANNING1/9/2003 1/10/2003 PASS
Approved per DRH02-00006 Mod #1.
Routing - FIRE1/8/2003 1/9/2003 PASS
Routing - PLAN CHECK1/6/2003 1/8/2003 PEND
corrections on shell
Routing - PLUMBING1/3/2003 1/3/2003 FAIL
your fixture schedule doesn't show the urinals, use the 2000 upc to size the water system, show premise backflow protection, accessable location, show thermol expantion size and location, floor drains will need to be primed.
Routing - PLANNING1/2/2003 1/2/2003 PASS
Plans do not incorporate DR comments. Anna Powell of B&A Engineers has been notified.
Routing - Erosion and Sediment12/31/2002 1/2/2003 FAIL
Routed with building permit Bld02-03054

ESC does not meet requirements of BCC8-17 or Plan Designer Manual Appendix A & C.
Routing - PLANNING Land Div12/31/2002 12/31/2002 PASS
Approved, no land division as per building permit issued on 6013 Overland Avenue.
Routing - PUBLIC WORKS12/30/2002 12/31/2002 PASS
Routing - PLANNING Land Div12/30/2002 12/30/2002 FAIL
Need to see deed to verify legal land division.
Plans ACCEPTED BY PLAN TECH  12/26/2002 DONE
Plans incorporated in with the shell plans Bld02-03054. Okay per John Menard on 12/12/02.
Received (3) sets of plans, (3) extra sets of site civil with grading and drainage, (2) sets of structural calculations, (1) letter from United Water, (1) legal description, (1) O&M (some drainage calculations on plans), and (1) permit application.
Application received  12/24/2002  
Recd Pcfee & Taken To Pln CK  12/24/2002 DONE