Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD02-03054
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 6015 W OVERLAND RD
Project NameOverland Road Commercial
Customer Number 
ePlanReviewNo
Description
(Shell)-To develop and build a 4,480 square foot one story Type VN , two tenant building for office use. Other work inlcudes all site improvements paving and landscaping per approved plans and attachments, DRH02-00006 No occupancy is authorized under this permit for a shell only. Separate plans and permits are required for occupancy. TI permit for space A - 2680 sq. ft. BLD02-03053. Space B 1800 sq. ft. is only part of the shell at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20055/6/20055/6/2005PPASS
DetailsTom Arcoraci
This is the one we talked about ~
BLD-Aging Inspection5/6/20055/6/20055/6/2005 PASS
DetailsTom Arcoraci
talked to 310
DOC - Permit Finaled5/6/20055/6/20055/6/2005PPASS
DetailsTom Arcoraci
This is the one we talked about ~
BLD-Framing/Rough-in2/10/20042/12/20042/12/2004ACANC
DetailsTom Arcoraci
Robbie; Phone #: ###-#### please call first for access.thanks. Internet Inspection Request from: Aimee Hughes
BLD-Final2/12/20042/12/20042/12/2004APART
DetailsTom Arcoraci
ok pending fire final
Temporary occupancy  7/25/2003 DONE
Temp. Occ. Cert. #4977 issued 7-25-03 to Kaufman and Kaufman Insurance.
BLD-Final7/18/20037/18/20037/18/2003ANR
DetailsTom Arcoraci
BLD-Final7/16/20037/17/20037/17/2003ACANC
DetailsTom Arcoraci
jed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore out of time 7/18/2003 8:36:58 AM
Print Occupancy Form  7/17/2003 DONE
Inspection Record Card- Bld  7/17/2003  
BLD-Framing/Rough-in7/16/20037/16/20037/16/2003PCANC
DetailsTom Arcoraci
BLD-Framing/Rough-in4/2/20034/3/20034/3/2003APART
DetailsTom Arcoraci
###-#### ok to cover all but bath need plan reveiw app on ada shower 4/3/2003 10:26:30 AM
BLD-Framing/Rough-in3/27/20033/27/20033/27/2003PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/27/2003 at 9:38:00 AM. Contact: ###-####. cn posted ok to insulate walls only 3/27/2003 3:43:30 PM
BLD-Wall cover3/11/20033/12/20033/12/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/11/2003 at 1:06:40 PM. Contact: ###-####. ok to side 3/12/2003 9:12:28 AM
BLD-Wall cover3/4/20033/4/20033/4/2003PNH
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/4/2003 at 9:07:45 AM. Contact: ###-####. no one at site or plans 3/4/2003 4:12:10 PM
BLD-Foundation2/20/20032/21/20032/21/2003APASS
DetailsTom Arcoraci
###-####
BLD-Footing2/19/20032/20/20032/20/2003APASS
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
Print Occupancy Form  2/20/2003 DONE
BLD-Footing2/19/20032/19/20032/19/2003PCANC
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Inspection cancelled from web by: Rita DeYoung
(F) Reprint permit  2/19/2003  
Issue PAID IN FULL permit  2/18/2003 DONE
Inspection Record Card- Bld  2/18/2003 DONE
Plan assigned to (MLO)12/26/200212/26/20021/30/2003 PASS
DetailsMike Otto
1/30/2003 09:32:27 MLO - activity updated through activity BLDA022 from case BLD02-03054.
PLANS/APPL TAKEN TO FRONT DESK  1/30/2003 DONE
Routing - Erosion and Sediment1/23/2003 1/29/2003 PASS
ESC approved with conditions attached to plans.
Plan resubmittals received  1/24/2003 DONE
Received two copies of ESC and Narrative. Put with plans. kmm
Routing - PLUMBING1/16/2003 1/22/2003 PASS
per ,plans and 2000 upc with thermol expantion and water heater pan drain
Routing - PLAN CHECK1/16/2003 1/16/2003 PASS
Plan resubmittals received  1/15/2003 DONE
Received two copies of revised sheets A2, A3, A4, A5, A6, & A7. One copy of response letter and one copy of ESC narrative. Routed to Mike O. kmm
Routing - PLANNING1/9/2003 1/10/2003 PASS
Route to Sarah Schafer after fire.
1/10/03 - Approved per DRH02-00006 Mod #1.
Routing - FIRE1/8/2003 1/9/2003 PASS
Plan Review Completed(1st rev)  1/9/2003 FAIL
Plan resubmittals requested  1/8/2003 DONE
UBC corrections
Routing - PLAN CHECK1/6/2003 1/8/2003 FAIL
corrections faxed to architect
Plan resubmittals received  1/6/2003 DONE
Received two copies of revised sheets C1.0 & L1.0. C1.0 sheet not stamped or signed. Routed to Mike O. kmm
Routing - PLUMBING1/3/2003 1/3/2003 FAIL
Routing - PLANNING1/2/2003 1/2/2003 PASS
Plans do not incorporate DR requirements. Anna Powell of B&A Engineers has been notified.
Routing - Erosion and Sediment12/31/2002 1/2/2003 FAIL
ESC does not meet requirements of BCC 8-17 or Plan Designer Manual Appendix A & C.
Routing - PUBLIC WORKS12/30/2002 12/31/2002 PASS
Routing - PLANNING Land Div12/31/2002 12/31/2002 PASS
Approved for land division on building permit issued to 6013 Overland Avenue.
Routing - PLANNING Land Div12/26/2002 12/30/2002 FAIL
Need to verify legal land division.
Plans ACCEPTED BY PLAN TECH  12/26/2002 DONE
1. Informed applicant that (2) sets of signed ESC prepared plans with (2) sets of narrative are required. Shell and TI plans submitted on same plans. Approved per John Menard on 12/12/02.
Received (3) sets of plans, (3) extra sets of site civil with grading and drainage, (2) sets of structural calculations, (1) letter from United Water, (1) legal description, (1) O&M (some drainage calculations on plans), and (1) permit application.
Pending Assignment by MYS12/26/2002 12/26/2002 DONE
DetailsMarlene Southard
12/26/2002 11:18:59 DKL - activity updated through activity BLDA174 from case BLD02-03054.
Application received  12/24/2002  
Recd Pcfee & Taken To Pln CK  12/24/2002 DONE
Fee Review-notes12/24/200212/24/2002