BLD-Final | 5/6/2005 | 5/6/2005 | 5/6/2005 | P | PASS |
Tom Arcoraci
|
|
|
This is the one we talked about ~
|
BLD-Aging Inspection | 5/6/2005 | 5/6/2005 | 5/6/2005 | | PASS |
Tom Arcoraci
|
|
|
talked to 310
|
DOC - Permit Finaled | 5/6/2005 | 5/6/2005 | 5/6/2005 | P | PASS |
Tom Arcoraci
|
|
|
This is the one we talked about ~
|
BLD-Framing/Rough-in | 2/10/2004 | 2/12/2004 | 2/12/2004 | A | CANC |
Tom Arcoraci
|
|
|
Robbie; Phone #: ###-#### please call first for access.thanks. Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 2/12/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Tom Arcoraci
|
|
|
ok pending fire final
|
Temporary occupancy | | | 7/25/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4977 issued 7-25-03 to Kaufman and Kaufman Insurance.
|
BLD-Final | 7/18/2003 | 7/18/2003 | 7/18/2003 | A | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 7/16/2003 | 7/17/2003 | 7/17/2003 | A | CANC |
Tom Arcoraci
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore out of time 7/18/2003 8:36:58 AM
|
Print Occupancy Form | | | 7/17/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover all but bath need plan reveiw app on ada shower 4/3/2003 10:26:30 AM
|
BLD-Framing/Rough-in | 3/27/2003 | 3/27/2003 | 3/27/2003 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 9:38:00 AM. Contact: ###-####. cn posted ok to insulate walls only 3/27/2003 3:43:30 PM
|
BLD-Wall cover | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 1:06:40 PM. Contact: ###-####. ok to side 3/12/2003 9:12:28 AM
|
BLD-Wall cover | 3/4/2003 | 3/4/2003 | 3/4/2003 | P | NH |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 9:07:45 AM. Contact: ###-####. no one at site or plans 3/4/2003 4:12:10 PM
|
BLD-Foundation | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Footing | 2/19/2003 | 2/20/2003 | 2/20/2003 | A | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Print Occupancy Form | | | 2/20/2003 | | DONE |
|
|
|
|
BLD-Footing | 2/19/2003 | 2/19/2003 | 2/19/2003 | P | CANC |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Inspection cancelled from web by: Rita DeYoung
|
(F) Reprint permit | | | 2/19/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/18/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/26/2002 | 12/26/2002 | 1/30/2003 | | PASS |
Mike Otto
|
|
|
1/30/2003 09:32:27 MLO - activity updated through activity BLDA022 from case BLD02-03054.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2003 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/23/2003 | | 1/29/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Plan resubmittals received | | | 1/24/2003 | | DONE |
|
|
|
Received two copies of ESC and Narrative. Put with plans. kmm
|
Routing - PLUMBING | 1/16/2003 | | 1/22/2003 | | PASS |
|
|
|
per ,plans and 2000 upc with thermol expantion and water heater pan drain
|
Routing - PLAN CHECK | 1/16/2003 | | 1/16/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/15/2003 | | DONE |
|
|
|
Received two copies of revised sheets A2, A3, A4, A5, A6, & A7. One copy of response letter and one copy of ESC narrative. Routed to Mike O. kmm
|
Routing - PLANNING | 1/9/2003 | | 1/10/2003 | | PASS |
|
|
|
Route to Sarah Schafer after fire.
1/10/03 - Approved per DRH02-00006 Mod #1.
|
Routing - FIRE | 1/8/2003 | | 1/9/2003 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/9/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 1/8/2003 | | DONE |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 1/6/2003 | | 1/8/2003 | | FAIL |
|
|
|
corrections faxed to architect
|
Plan resubmittals received | | | 1/6/2003 | | DONE |
|
|
|
Received two copies of revised sheets C1.0 & L1.0. C1.0 sheet not stamped or signed. Routed to Mike O. kmm
|
Routing - PLUMBING | 1/3/2003 | | 1/3/2003 | | FAIL |
|
|
|
|
Routing - PLANNING | 1/2/2003 | | 1/2/2003 | | PASS |
|
|
|
Plans do not incorporate DR requirements. Anna Powell of B&A Engineers has been notified.
|
Routing - Erosion and Sediment | 12/31/2002 | | 1/2/2003 | | FAIL |
|
|
|
ESC does not meet requirements of BCC 8-17 or Plan Designer Manual Appendix A & C.
|
Routing - PUBLIC WORKS | 12/30/2002 | | 12/31/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/31/2002 | | 12/31/2002 | | PASS |
|
|
|
Approved for land division on building permit issued to 6013 Overland Avenue.
|
Routing - PLANNING Land Div | 12/26/2002 | | 12/30/2002 | | FAIL |
|
|
|
Need to verify legal land division.
|
Plans ACCEPTED BY PLAN TECH | | | 12/26/2002 | | DONE |
|
|
|
1. Informed applicant that (2) sets of signed ESC prepared plans with (2) sets of narrative are required. Shell and TI plans submitted on same plans. Approved per John Menard on 12/12/02.
Received (3) sets of plans, (3) extra sets of site civil with grading and drainage, (2) sets of structural calculations, (1) letter from United Water, (1) legal description, (1) O&M (some drainage calculations on plans), and (1) permit application.
|
Pending Assignment by MYS | 12/26/2002 | | 12/26/2002 | | DONE |
Marlene Southard
|
|
|
12/26/2002 11:18:59 DKL - activity updated through activity BLDA174 from case BLD02-03054.
|
Application received | | | 12/24/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/24/2002 | | DONE |
|
|
|
|
Fee Review-notes | 12/24/2002 | 12/24/2002 | | | |
|
|
|
|