(F) Reprint permit | | | 3/16/2005 | | |
|
|
|
|
Fee Review-notes | 12/26/2002 | 12/26/2002 | 8/10/2004 | | DONE |
|
|
|
|
Fee Review-notes | 8/13/2003 | 8/13/2003 | 8/13/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
First Notice | | 6/19/2003 | 6/19/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | PASS |
Rick Jackson
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | PASS |
Jim Storey
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Permanent occupancy | | | 6/18/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9697 issued 6-18-03 to the Out Post Cafe at the Boise Airport.
|
Permanent Occupancy | | 6/17/2003 | 6/17/2003 | | DONE |
|
|
|
|
BLD-Final | 6/10/2003 | 6/10/2003 | 6/10/2003 | P | PART |
Jim Storey
|
|
|
MARK; Phone #: ###-#### Internet Inspection Request from: Darla Downs final ok pending shell bld sign off/ and perm occ load sign. 6/10/2003 2:56:47 PM
|
FIRE-Final Inspection | 6/10/2003 | 6/10/2003 | 6/10/2003 | P | FAIL |
Rick Jackson
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore awaiting testing of the fire alarms 6/10/2003 3:48:26 PM
|
BLD-Final | 5/19/2003 | 5/19/2003 | 5/19/2003 | P | PART |
Jim Storey
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore occ load sign,others sign offs. 5/19/2003 4:12:31 PM
|
BLD-Framing/Rough-in | 5/1/2003 | 5/2/2003 | 5/2/2003 | A | FAIL |
Jim Storey
|
|
|
ceiling= mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie missing fire proofing/ fire stopping at shaft not complet. 5/2/2003 9:16:56 AM
|
BLD-Other | 4/29/2003 | 4/30/2003 | 4/30/2003 | A | CANC |
Jim Storey
|
|
|
MARK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Conference | 4/30/2003 | 4/30/2003 | 4/30/2003 | P | FAIL |
Jim Storey
|
|
|
termanation at gyp shaft and tape on all joints not complet per listing access door not done. 4/30/2003 5:30:31 PM
|
BLD-Framing/Rough-in | 4/16/2003 | 4/17/2003 | 4/17/2003 | P | PART |
Jim Storey
|
|
|
MARK ; Phone #: ###-#### Internet Inspection Request from: Annette Moore shaft clearance ok to duct need fire stoping at lower penatations. 4/17/2003 3:22:04 PM
|
BLD-Framing/Rough-in | 3/24/2003 | 3/25/2003 | 3/25/2003 | P | PART |
Jim Storey
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Annette Moore floor sink penatrations complet. 3/25/2003 4:29:09 PM
|
BLD-Other | 3/21/2003 | 3/24/2003 | 3/24/2003 | A | NR |
Jim Storey
|
|
|
Mark, ###-####
|
BLD-Conference | 3/19/2003 | 3/20/2003 | 3/20/2003 | A | PART |
Jim Storey
|
|
|
###-#### ###-#### shaft review ok 3/20/2003 2:10:02 PM
|
BLD-Foundation | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | PART |
Jim Storey
|
|
|
###-#### ###-#### walls ok for cover pipe penatrations fier stopped/ floor sinks must be insp from bottom of floor for 2hr encapulation/ shaft and soffit supports pending insp ar later date. 3/11/2003 3:22:49 PM
|
BLD-Wall cover | 3/7/2003 | 3/10/2003 | 3/10/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 2:29:06 PM. Contact: ###-####.one side only ele panel/ plm pipe fire stopping 3/10/2003 4:07:42 PM
|
Issue PAID IN FULL permit | | | 2/19/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/12/2003 | | DONE |
|
|
|
CALLED 2-12-03
|
Print Pending Permit.LaserJet4 | | | 2/12/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/30/2003 | | 2/11/2003 | | PASS |
|
|
|
Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2003 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 1/6/2003 | | 2/11/2003 | | PASS |
Carl Westfall
|
|
|
2/11/2003 13:31:45 CJW - activity updated through activity BLDA022 from case BLD02-03062.
|
Plan resubmittals received | | | 2/6/2003 | | DONE |
|
|
|
Received two copies of revised sheets cover sheet, A1.0, A1.2, A2.0, A3.0, A3.1, A3.2, A3.3, EQ0.0 A4.0, P.01, P2.1. One copy of BLM design addendum 1-4 and one copy of City of Boise plan review and fire code review. Routed to Carl W. kmm
|
Routing - FIRE | 1/29/2003 | | 1/30/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/27/2003 | | 1/29/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/8/2003 | | 1/27/2003 | | |
|
|
|
Failed first UBC review. UBC plan review started January 23, 2003 and was finished January 27, 2003. A response was required from the architect. See the conditions list.
|
Routing - PUBLIC WORKS | 1/6/2003 | | 1/7/2003 | | |
|
|
|
Failed first review.
|
Routing - PLUMBING | 1/7/2003 | | 1/7/2003 | | PASS |
|
|
|
provide an additional FS-1 under the BP-1s to recieve full discharge, indirect waste from B2, 13, 19a into floor sink, provide a shutoff valve for this tenant, provide a drip pan for the water heater, pipe waste from 32 to GI.
|
Plans ACCEPTED BY PLAN TECH | | | 12/26/2002 | | DONE |
|
|
|
Plans not fully dimensioned.
(2) sets of plans with (2) sets of project manual submitted with (1) TI permit application.
|
Application received | | | 12/26/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/26/2002 | | DONE |
|
|
|
|