Permit Information
Permit NumberBLD02-03075
StatusFinaled
Name LIBERTY LAKES APARTMENTS
Site Address 1323 N LIBERTY RD
Project NameLiberty Lakes Apartments
Customer Number 
ePlanReviewNo
Description
(Phase II - Bldg. 1 - Section 1 of 2) * A two hour area separation wall will be constructed to divide this 16 unit apartment building into two separate buildings. This section is two story, 12 units, and is 10,100 sq.ft. in area. The first floor is 4,990 sq.ft. the second floor is 5,170 sq.ft. each unit is one bedroom and one bathroom. All construction per the approved plans and attached comment list. NOTE: This permit does not cover the installation of the free standing carports. Separate engineering required for the carports. Refer to BLD 03-01373 for other side of area separation wall. PC#814-02 DRH02-00140 CUP02-00075 CAR02-00029 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/9/2014 DONE
Fee Review-notes12/30/200212/30/20028/10/2004 DONE
First Notice 4/7/20044/7/2004 DONE
Permanent occupancy  4/7/2004 DONE
Perm. Occ. Cert. # 10078 issued 4-6-04 to Liberty Lake Apts.
Permanent Occupancy 4/6/20044/6/2004 DONE
Details
BLD-Final4/6/20044/6/20044/6/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/6/2004 at 10:54:50 AM. Contact: ###-####. OK FOR PERM OCC 4/6/2004 1:19:19 PM
Temporary occupancy  4/1/2004 PASS
FINAL SIGNED OFF & RELEASE OF BOND
BLD-Final3/11/20043/12/20043/12/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/11/2004 at 3:24:05 PM. Contact: ###-####. ok for perm when others sign perm 3/12/2004 9:29:49 AM
FIRE-Final Inspection3/2/20043/2/20043/2/2004APASS
DetailsTroy Cobbley
fire life safety finaled 3/2/2004 11:47:02 AM
BLD-Conference2/20/20042/20/20042/20/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/20/2004 at 7:30:17 AM. Contact: ###-####. hand rail ok 2/20/2004 10:05:28 AM
BLD-Energy code compliance1/12/20041/12/20041/12/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/12/2004 at 7:24:42 AM. Contact: ###-####. ok to cover 1/12/2004 8:48:30 AM
BLD-Framing/Rough-in1/8/20041/9/20041/9/2004APART
DetailsTom Arcoraci
1st floor need ok to insulate. 1/8/2004 2:14:05 PM ok to insul 1 st floor re check floor ceiling pents at drops 1/9/2004 9:21:15 AM
BLD-Framing/Rough-in1/8/20041/8/20041/8/2004PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/8/2004 at 11:23:32 AM. Contact: ###-####. called contractor told him that attic needs inspection will need to meet with a ladder. 1/8/2004 2:16:05 PM
BLD-Energy code compliance12/31/200312/31/200312/31/2003PPART
DetailsTom Arcoraci
Odie ok to cover 2nd floor need to check 2 hr wall pents at attic 12/31/2003 3:11:05 PM
BLD-Conference11/20/200311/21/200311/21/2003PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/20/2003 at 8:34:17 PM. Contact: ###-####. NEED TO FINISH FIRE CAULKING IN DROPS 11/21/2003 2:55:32 PM
BLD-Energy code compliance11/6/200311/7/200311/7/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/6/2003 at 4:46:58 PM. Contact: ###-####.
BLD-Energy code compliance11/4/200311/5/200311/5/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/4/2003 at 1:01:04 PM. Contact: ###-####.
BLD-Framing/Rough-in11/3/200311/3/200311/3/2003PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/3/2003 at 10:35:22 AM. Contact: ###-####.
FIRE-Conference10/23/200310/24/200310/24/2003ADONE
DetailsTroy Cobbley
I spoke with Mike with Steed Construction about the placement of fire extinguishers. They need to be placed at each of the exit/entrances for a total of 6 extinguishers for each apartment block 10/24/2003 12:07:42 PM
BLD-Conference10/21/200310/22/200310/22/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/21/2003 at 5:12:41 PM. Contact: ###-####. wip ok 10/22/2003 1:17:09 PM
BLD-Conference10/20/200310/21/200310/21/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/20/2003 at 6:02:02 PM. Contact: ###-####.
BLD-Conference10/14/200310/14/200310/14/2003PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/14/2003 at 7:43:42 AM. Contact: ###-####. ok to side 10/14/2003 2:06:04 PM
BLD-Conference10/7/200310/8/200310/8/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/7/2003 at 5:44:23 PM. Contact: ###-####. 2 hr wall needs fix 10/8/2003 9:34:38 AM
BLD-Footing9/30/200310/1/200310/1/2003ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/30/2003 at 3:01:29 PM. Contact: ###-####.
BLD-Conference9/30/200310/1/200310/1/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/30/2003 at 3:02:06 PM. Contact: ###-####.
FIRE-Conference9/29/20039/30/20039/30/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/29/2003 at 1:00:07 PM. Contact: ###-####. Met with GC and electrician about smoke detectors; install in locations as shown on plans but they will be located close to the kitchen requiring silencing option; need 177 cd in ADA rooms 9/30/2003 12:35:54 PM
BLD-Conference9/17/20039/18/20039/18/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/17/2003 at 5:45:59 PM. Contact: ###-####. needs arch detail for floor 9/18/2003 10:36:02 AM
BLD-Conference9/10/20039/11/20039/11/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/10/2003 at 1:13:25 PM. Contact: ###-####.
BLD-Conference9/2/20039/3/20039/3/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/2/2003 at 11:19:12 AM. Contact: ###-####. out of time. 9/2/2003 6:04:04 PM
BLD-Framing/Rough-in9/3/20039/3/20039/3/2003PFAIL
DetailsRuss Owen
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Conference9/2/20039/3/20039/3/2003PFAIL
DetailsRuss Owen
2 hr wall at floor line not per plan met with contractor. build per plan or architect to supply new detail. 9/2/2003 10:14:13 PM
BLD-Foundation7/30/20037/30/20037/30/2003PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/30/2003 at 8:26:55 AM. Contact: ###-####. spec insp on site 7/30/2003 4:05:05 PM
BLD-Footing7/23/20037/23/20037/23/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/23/2003 at 7:15:30 AM. Contact: ###-####. pending strata 7/23/2003 9:00:06 AM
Issue PAID IN FULL permit  6/27/2003 DONE
Print Occupancy Form  6/18/2003 DONE
Telephone call  6/18/2003 DONE
permit ready
Plan assigned to (M_P)12/31/200212/31/20026/17/2003 PASS
DetailsMike Phillips
6/17/2003 14:33:45 M_P - activity updated through activity BLDA022 from case BLD02-03075.
Routing - PLANNING6/16/2003 6/17/2003 PASS
Approved per DRH02-140 and Modification.
Routing - PLAN CHECK6/17/2003 6/17/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/17/2003 DONE
Print Pending Permit.LaserJet4  6/17/2003 DONE
Case Summary (BLD)  6/17/2003 DONE
Routing - FIRE6/11/2003 6/13/2003 PASS
Comments revised to reflect plan modifications.
Print permit w/o conditions  6/11/2003  
Routing - PLAN CHECK5/8/2003 6/11/2003 PEND
Routing to fire.
Plan resubmittals received  5/29/2003 DONE
Response letter, transmittal letter from JUB, transmittal from Ikemire Arch, Revised certificates of value for bld02-03075,02-03076,3077, 2 copies of S2-6, S1-6, S6-6, S2-6, (2 of A2, A3, A4, A5, A6, A7, A8, A9, and taken to Mike P.
Routing - PLANNING5/1/2003 5/7/2003 PEND
Pending a Design Review modification application for site-landscape design. Met with Mark (with Steed Construction) on May 6 and discussed this issue with him.
Routing - PLAN CHECK4/4/2003 5/1/2003 FAIL
Third review failed. Need additional information submitted for review prior to issuing permit.
Routing - PLANNING4/1/2003 4/4/2003 FAIL
K. Gallagher - approved resubmitted plans.
M. Santoyo - Landscape plan changed from original approval. The applicant is required to submit a staff level Design Review modification application to address the changes, as well as the removal of approved trees per DRH02-140, condition of approval #21.
Routing - PLAN CHECK3/14/2003 4/1/2003  
Plan resubmittals received  4/1/2003 DONE
Received two copies of revised sheets, EL1, S2 of 6, S4 of 6, S5 of 6, Three copies of A2, two of A5, A7, A9, A10, A11, A11A. One response letter from JUB engineering, and one response letter from IKEMIRE Architects. Routed to Mike P. kmm
Routing - PLAN CHECK3/5/2003 3/14/2003 FAIL
Second review failed sent correction report to architect requesting additional informaiton to be submitted for further review prior to issuing permit.
Routing - PLANNING3/3/2003 3/4/2003 FAIL
Failed again - sent letter to developer, architect, and builder. kg
Routing - PLAN CHECK2/21/2003 3/3/2003  
Plan resubmittals received  2/28/2003 DONE
Received two sets of resubmittal sheets "Landscape Plans". Routed to Mike Phillips.
Plan resubmittals received  2/28/2003 DONE
Received two sets of resubmittal sheets A1, A3, A4, A5, A6, A6A, A7, A8, A9, A10, A11, A11A, A12, S1, S2, S3, S4, S5, with cover/comment letter and transmittal. Routed to Mike Phillips.
Routing - PLAN CHECK2/14/2003 2/21/2003  
Routing - FIRE2/21/2003 2/21/2003 PASS
Routing - PLAN CHECK2/21/2003 2/21/2003  
Routing - FIRE2/21/2003 2/21/2003  
Routing - PUBLIC WORKS2/13/2003 2/14/2003 PASS
Routing - FIRE2/11/2003 2/13/2003 FAIL
water supply quote
Routing - PLAN CHECK1/27/2003 2/11/2003 FAIL
Plan review completed, sent correction report to architect requesting additional informaiton for further review, prior to issuing permit.
Print permit w/o conditions  2/11/2003  
Routing - PLUMBING1/24/2003 1/27/2003 PASS
1. Idaho code requires a base of stack cleanout on all dwv stacks. 2. Water heater T&P drains must terminate to outside of the bldg 6-24 inches above ground. 3. The double check valves for each building need to be 11/2 inch not 11/4 inch per fixture schedule. 4. Each apartment needs a water shutoff valve in addition to the water heater shutoff valve. 5. ET-1 needs to be sized for the building thermal expansion.
Routing - PLANNING1/14/2003 1/24/2003 FAIL
Karen Gallagher - Failed. Not in compliance with CUP02-75. 1-16-03.
Marty Santoyo - Not in compliance with DRH02-140. 1-23-03.
Routing Off Site - STRUCTURAL1/2/2003 1/21/2003 PASS
contacted PDQ to take plans to outside eng. kmm
Approved no further review required by outside engineering firm.
Routing - Erosion and Sediment1/13/2003 1/14/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS12/31/2002 1/13/2003 FAIL
Requires Drainage plan and geotech revision. Per Brian M. kmm
Routing - PLANNING Land Div12/31/2002 12/31/2002 PASS
Approved by ROS 5887.
Plans ACCEPTED BY PLAN TECH  12/31/2002 DONE
Received (3) sets of plans, (3) extra sets of Grading/Drainage plans, (2) Geotech Reports, (2) sets of storm water O&M, (2) sets of drainage calculations, (2) sets of ESC plans with narrative, (3) sets of structural calculations, and (1) New commercial permit application with ESC permit application.
Application received  12/30/2002  
Recd Pcfee & Taken To Pln CK  12/30/2002 DONE