Case Summary (BLD) | | | 6/9/2014 | | DONE |
|
|
|
|
Fee Review-notes | 12/30/2002 | 12/30/2002 | 8/10/2004 | | DONE |
|
|
|
|
First Notice | | 4/7/2004 | 4/7/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/7/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10076 issued 4-6-04 to the Liberty Lakes Apts.
|
Permanent Occupancy | | 4/6/2004 | 4/6/2004 | | DONE |
|
|
|
|
BLD-Final | 4/6/2004 | 4/6/2004 | 4/6/2004 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm occ
|
Code Occupancy Approval | | | 4/1/2004 | | PASS |
|
|
|
FINAL SIGNED OFF AND RELEASED THE BOND
|
BLD-Aging Inspection | 3/10/2004 | 3/10/2004 | 3/10/2004 | | NR |
Tom Arcoraci
|
|
|
|
PubWorks Occupancy Approval | 2/2/2004 | 2/2/2004 | 2/2/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 2/2/04. D.Erskine
|
Temporary occupancy | | | 1/7/2004 | | DONE |
|
|
|
Temp. Occ. Cert. #5055 issued 1-7-04 to the Liberty Lakes Apartments.
|
BLD-Final | 1/6/2004 | 1/6/2004 | 1/6/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 10:44:26 AM. Contact: ###-####. ok for perm when others sign perm 1/6/2004 3:17:47 PM
|
FIRE-Final Inspection | 1/5/2004 | 1/5/2004 | 1/5/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 1/5/2004 2:25:33 PM
|
BLD-Conference | 12/19/2003 | 12/22/2003 | 12/22/2003 | A | NH |
Russ Owen
|
|
|
no one her knows what they need for insp. 12/22/2003 11:06:02 AM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | PART |
Russ Owen
|
|
|
areas \above droped ceiling ok except 1 west center unit left wal 3 in pipe posted c/n at this window 12/22/2003 4:05:25 PM
|
BLD-Conference | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/19/2003 at 9:16:12 AM. Contact: ###-####. out of time I cloned for monday. 12/19/2003 4:48:54 PM
|
BLD-Framing/Rough-in | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | CANC |
Tom Arcoraci
|
|
|
Rob - top floor; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Conference | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/30/2003 at 3:57:51 PM. Contact: ###-####. ok to cover shear with drywall 10/31/2003 8:54:17 AM
|
BLD-Aging Inspection | 9/26/2003 | 9/26/2003 | 9/26/2003 | | PASS |
Tom Arcoraci
|
|
|
wip 9/29/2003 9:08:24 AM
|
Issue PAID IN FULL permit | | | 6/27/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/18/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/18/2003 | | DONE |
|
|
|
permit ready
|
Plan assigned to (M_P) | 12/31/2002 | 12/31/2002 | 6/17/2003 | | PASS |
Mike Phillips
|
|
|
6/17/2003 14:48:10 M_P - activity updated through activity BLDA022 from case BLD02-03077.
|
Routing - PLANNING | 6/16/2003 | | 6/17/2003 | | PASS |
|
|
|
Approved per DRH02-140 and Modification.
|
Routing - PLAN CHECK | 6/17/2003 | | 6/17/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2003 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/17/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/17/2003 | | DONE |
|
|
|
|
Routing - FIRE | 6/11/2003 | | 6/13/2003 | | PASS |
|
|
|
Revised comments to reflect plan modifications
|
Routing - PLAN CHECK | 5/8/2003 | | 6/11/2003 | | PEND |
|
|
|
Routing to fire.
|
Print permit w/o conditions | | | 6/11/2003 | | |
|
|
|
|
Plan resubmittals received | | | 5/29/2003 | | DONE |
|
|
|
Response letter, transmittal letter from JUB, transmittal from Ikemire Arch, Revised certificates of value for bld02-03075,02-03076,3077, 2 copies of S2-6, S1-6, S6-6, S2-6, (2 of A2, A3, A4, A5, A6, A7, A8, A9, and taken to Mike P.
|
Routing - PLANNING | 5/1/2003 | | 5/7/2003 | | PEND |
|
|
|
Pending a Design Review modification application for site-landscape design. Met with Mark (with Steed Construction) on May 6 and discussed this issue with him.
|
Routing - PLAN CHECK | 4/4/2003 | | 5/1/2003 | | FAIL |
|
|
|
Third review failed. Need additional information submitted for review prior to issuing permit.
|
Routing - PLANNING | 4/1/2003 | | 4/4/2003 | | FAIL |
|
|
|
K. Gallagher approved resubmitted plans.
M. Santoyo - Landscape plan changed from original approval. The applicant is required to submit a staff level Design Review modification application to address the changes, as well as the removal of approved trees per DRH02-140, condition of approval #21.
|
Routing - PLAN CHECK | 3/14/2003 | | 4/1/2003 | | |
|
|
|
|
Plan resubmittals received | | | 4/1/2003 | | DONE |
|
|
|
Received two copies of revised sheets, EL1, S2 of 6, S4 of 6, S5 of 6, Three copies of A2, two of A5, A7, A9, A10, A11, A11A. One response letter from JUB engineering, and one response letter from IKEMIRE Architects. Routed to Mike P. kmm
|
Routing - PLAN CHECK | 3/5/2003 | | 3/14/2003 | | FAIL |
|
|
|
Second review failed sent correction report to architect requesting additional informaiton to be submitted for further review prior to issuing permit.
|
Routing - PLANNING | 3/3/2003 | | 3/5/2003 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/21/2003 | | 3/3/2003 | | |
|
|
|
|
Plan resubmittals received | | | 2/28/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets "Landscape Plans". Routed to Mike Phillips.
|
Plan resubmittals received | | | 2/28/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets A1, A3, A4, A5, A6, A6A, A7, A8, A9, A10, A11, A11A, A12, S1, S2, S3, S4, S5, with cover/comment letter and transmittal. Routed to Mike Phillips.
|
Routing - PLAN CHECK | 2/14/2003 | | 2/21/2003 | | |
|
|
|
|
Routing - FIRE | 2/21/2003 | | 2/21/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/13/2003 | | 2/14/2003 | | PASS |
|
|
|
|
Routing - FIRE | 2/11/2003 | | 2/13/2003 | | FAIL |
|
|
|
|
Print permit w/o conditions | | | 2/11/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 1/27/2003 | | 2/11/2003 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional informaiton for further review, prior to issuing permit.
|
Routing - PLUMBING | 1/24/2003 | | 1/27/2003 | | PASS |
|
|
|
1. Idaho code requires a base of stack cleanout on all dwv stacks. 2. Water heater T&P drains must terminate to outside of the bldg 6-24 inches above ground. 3. The double check valves for each building need to be 11/2 inch not 11/4 inch per fixture schedule. 4. Each apartment needs a water shutoff valve in addition to the water heater shutoff valve. 5. ET-1 needs to be sized for the building thermal expansion.
|
Routing - PLANNING | 1/14/2003 | | 1/24/2003 | | FAIL |
|
|
|
Karen Gallagher - Failed. Not in compliance with CUP02-75. 1-16-03.
Marty Santoyo - Not in compliance with DRH02-140. 1-23-03.
|
Routing Off Site - STRUCTURAL | 1/2/2003 | | 1/21/2003 | | PASS |
|
|
|
contacted PDQ to take plans to outside eng. kmm
Approved no further review required by outside engineering firm.
|
Routing - Erosion and Sediment | 1/13/2003 | | 1/14/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 12/31/2002 | | 1/13/2003 | | FAIL |
|
|
|
Requires Drainage plan and geotech revision. Per Brian M. kmm
|
Routing - PLANNING Land Div | 12/31/2002 | | 12/31/2002 | | PASS |
|
|
|
Approved by ROS 5887.
|
Plans ACCEPTED BY PLAN TECH | | | 12/31/2002 | | DONE |
|
|
|
Received (3) sets of plans, (3) extra sets of Grading/Drainage plans, (2) Geotech Reports, (2) sets of storm water O&M, (2) sets of drainage calculations, (2) sets of ESC plans with narrative, (3) sets of structural calculations, and (1) New commercial permit application with ESC permit application.
|
Application received | | | 12/30/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/30/2002 | | DONE |
|
|
|
|