Permit Information
Permit NumberBLD02-03088
StatusFinaled
Name LAWRENZ DONALD R
Site Address 5200 W STATE ST
Project NamePetersen Staggs Architects LLP
Customer Number 
ePlanReviewNo
Description
Petersen - Staggs Architectural Office - To construct a new 6,600 square foot, two story, wood framed office building and related site improvements. First floor 5185 square feet, second floor 1415 square feet. All construction per the approved plans and attached comment list. PC#823-02 DRH02-00117
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 6/21/20044/26/2005 DONE
Fee Review-notes12/30/200212/30/20028/10/2004 DONE
Permanent occupancy  6/21/2004 DONE
Perm. Occ. Cert. # 10193 issued 6-21-04 to Petersen Staggs Architects.
Code Occupancy Approval6/24/20046/18/20046/18/2004PDONE
DetailsDena Gambrel
Inspection completed. Signed off. 6/24/2004 12:34:17 PM
Permanent Occupancy 6/18/20046/18/2004 DONE
Details
BLD-Final6/17/20046/18/20046/18/2004APASS
DetailsTony Young
john- ###-#### for perm occ
perm. occ. ok 6/18/2004 9:43:47 AM
Office Staff conference/action  5/17/2004 DONE
Extension letter of temp. occ. issued by Jenifer until June 18, 2004.
BLD-Final2/17/20042/19/20042/19/2004APART
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
temp. occ. ok 2/19/2004 12:33:48 PM
Temporary occupancy  2/19/2004 DONE
Temp. Occ. Cert. # 5075 issued 2-19-04 to Petersen Staggs Architects.
FIRE-Final Inspection2/17/20042/18/20042/18/2004APASS
DetailsTroy Cobbley
fire life safety finaled. Structural inspection please verify correct door hardware on the three exterior exits. 2/18/2004 9:34:03 AM
FIRE-Final Inspection2/17/20042/17/20042/17/2004PFAIL
DetailsTroy Cobbley
Need metal sample tubes in return air ducts since they exceed 1 1/2' in width. Third hvac unit that serves the 2nd story needs to have automatic shutdown per UMC since there is no separation between the 1st story and 2nd story systems 2/17/2004 4:00:03 PM
PubWorks Occupancy Approval2/3/20042/3/20042/3/2004 DONE
Drainage project complete, signed permanent occupancy 2/3/04. R.Rokovitz
Print Occupancy Form  2/2/2004 DONE
BLD-Energy code compliance11/10/200311/12/200311/12/2003APART
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
commercial project, energy code not reqd. on 2002 permit, no inspection done 11/12/2003 10:25:01 AM
BLD-Framing/Rough-in11/5/200311/5/200311/5/2003PPASS
DetailsTony Young
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in11/3/200311/4/200311/4/2003AFAIL
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need trades, seal, etc 1st 11/4/2003 10:40:31 AM
BLD-Foundation6/30/20037/1/20037/1/2003APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/30/2003 at 3:14:25 PM. Contact: ###-####.
wip, on walls, int. point loads, ok so far 7/1/2003 10:57:52 AM
BLD-Footing6/26/20036/27/20036/27/2003APASS
DetailsDave Hannah
DAVE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
(F) Reprint permit  6/23/2003  
Issue PAID IN FULL permit  6/20/2003  
Routing - PLAN CHECK5/21/2003 6/16/2003  
Routing - PLANNING Land Div6/16/2003 6/16/2003 PASS
Approved. Parcels re-combined by warranty deed recorded on 6/10/03. No other building permits for other structures will be issued until Mount Bennett Subdivision is recorded. David Abo, June 16, 2003.
PLANS/APPL TAKEN TO FRONT DESK  6/16/2003 PASS
Routing - PLAN CHECK6/16/2003 6/16/2003 PASS
Inspection Record Card- Bld  6/16/2003 DONE
Print Occupancy Form  6/16/2003 DONE
Telephone call  6/16/2003 DONE
LEFT MESS THAT PERMIT IS READY
Plan assigned to (JCM)1/2/2003 6/16/2003 PASS
DetailsJohn Menard
6/16/2003 10:44:58 JCM - activity updated through activity BLDA022 from case BLD02-03088.
Routing - PUBLIC WORKS5/14/2003 5/21/2003 PASS
Routing - PLANNING Land Div5/21/2003 5/21/2003 FAIL
Building site is proposed Lot 1 in Mount Bennet Subdivision. Final plat approved by City Council on November 12, 2002.
5/21/03 final plat not recorded. kmm
Additional plans submitted  5/19/2003  
Received three additional copies of revised civil sheets. Routed to Brian M. to put with plans. kmm
Plan resubmittals received  5/14/2003 DONE
Received three copies of revised sheets SD4, SD7 & SD8. Four copies of stormwater management clculations. Routed to John M. kmm
Routing - PLANNING5/12/2003 5/13/2003 PASS
Approved per DRH02-117.
Routing - PLAN CHECK4/25/2003 5/12/2003  
Plan resubmittals received  5/9/2003 DONE
received response letter, two copies of additional calculations, three copies of S4. routed to John M.
Plan Reviewer's activity  5/9/2003 PASS
Reviewed and approved resubmitted plans, including resubmitted structural plans and calculations. JCM
Plan resubmittals requested  5/1/2003  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting additional revisions. JCM
Plan resubmittals received  5/1/2003 DONE
letter of transmittal, response letter form Peterson Staggs, two sets of A1, A2, A6, A7, A8.1, A10,A12 taken to John M.
Routing Off Site - STRUCTURAL4/25/2003 4/30/2003 FAIL
Contacted PDQ to take resubs of 4/25/03 to outside engineering. kmm Received comment list from consulting engineer requesting additional revisions to be reviewed by plan reviewer. JCM
Routing Off Site - STRUCTURAL4/21/2003 4/30/2003 FAIL
Contacted PDQ to take revised sheets of 4/18/03 to outside engineering. kmm
Routing - PLANNING4/23/2003 4/25/2003 FAIL
Revised landscape plan and site plan have not been submitted. Also no copy of a Cross
Access Agreement has been submitted. Applicant has been notified. It will be required that the vegetation at the bottom of the retention ponds be relocated.
Plan resubmittals received  4/24/2003 DONE
Received letter of transmittal and three S-2 and three S-6 and taken to John M.
Routing - PLAN CHECK1/21/2003 4/23/2003  
Plan resubmittals received  4/21/2003 DONE
Received letter of transmittal and S1.1 plan.
Plan resubmittals received  4/18/2003 DONE
Received one respones letter to review commets, three revised sheets of SD1, SD5, for Sarah S. and received one response letter, two revised structural Calcs.and two sets of S1.1, A1, A2,A5,A6,A7,A9, A9.1, A10,A10.1, A11, A12, A13, A16.
Plan resubmittals requested  1/21/2003  
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Plan resubmittals requested  1/21/2003  
Faxed a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Plan Review Completed(1st rev)  1/21/2003 FAIL
Routing - PLAN CHECK1/15/2003 1/21/2003 FAIL
Routing - FIRE1/21/2003 1/21/2003 PASS
NO CRRECTIONS REQUIRED
Routing Off Site - STRUCTURAL1/2/2003 1/20/2003 FAIL
Contacted PDQ to take plans to outside eng. kmm
Routing - PLUMBING1/13/2003 1/13/2003 PASS
need expansion tank for thermal expansion
Routing - Erosion and Sediment1/7/2003 1/9/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS1/2/2003 1/7/2003 FAIL
Requires drainage plan revisions per Brian M. kmm
Pending Assignment by JCM12/31/2002 1/2/2003 DONE
DetailsJohn Menard
1/2/2003 08:28:46 JCM - activity updated through activity BLDA166 from case BLD02-03088.
Routing - PLANNING Land Div12/31/2002 1/2/2003 FAIL
Building site is proposed Lot 1 in Mount Bennet Subdivision. Final plat approved by City Council on November 12, 2002.
Plans ACCEPTED BY PLAN TECH  12/31/2002 DONE
Received (3) sets of plans, (3) Civil/Grading & Drainage, (2) sets of Geotech report, (2) sets of Structural Calculations, (2) Drainage Calculations, (2) Drainage O&M, (2) ESC narrative, (1) Legal Description, (2) Parcel Maps, (1) ESC permit application, (1) New Commercial Permit Application.
Application received  12/30/2002  
Recd Pcfee & Taken To Pln CK  12/30/2002 DONE
Routing - PLANNING1/9/2003 1/13/2002 FAIL
The site plan for the building permit differs slightly from that submitted for DR. The landscape plan differs greatly because of a retention pond placed along the street frontage. The applicant has been notified that these changes need to be worked out with DR staff before the Building Permit plans can be approved.