Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/16/2005 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/16/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10477 issued 3-16-05 to Cloverdale Plumbing.
|
Permanent Occupancy | | 3/10/2005 | 3/10/2005 | | DONE |
|
|
|
|
BLD-Final | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | PASS |
Jim Sly
|
|
|
Contact Randy Calkins; Phone #: ###-#### OK for Perm Occ. :) 3/10/2005 3:25:11 PM 3/10/2005 3:25:28 PM
|
BLD-Final | 2/14/2005 | 2/15/2005 | 2/15/2005 | A | PART |
Lane Manuel
|
|
|
For access, see Cloverdale Plumbing, next building to the West.; Phone #: ###-####
temp c of o ok.
c/n on site. 2/15/2005 9:55:40 AM
|
FIRE-Final Inspection | 2/11/2005 | 2/14/2005 | 2/14/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety passed. Address to be mounted before structural sign off 2/14/2005 10:16:06 AM
|
Code Occupancy Approval | | | 2/10/2005 | | PASS |
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF.
|
BLD-Conference | 7/22/2004 | 7/23/2004 | 7/23/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/22/2004 at 9:46:33 AM. Contact: ###-####. arch to address gauard rail at street 7/23/2004 9:43:55 AM
|
BLD-Energy code compliance | 3/30/2004 | 3/30/2004 | 3/30/2004 | P | PASS |
Jim Sly
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 3/9/2004 | 3/9/2004 | 3/9/2004 | P | PASS |
Jim Sly
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 2/12/2004 | 2/13/2004 | 2/13/2004 | A | CANC |
Jim Sly
|
|
|
FRANK; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
PubWorks Occupancy Approval | 10/3/2003 | 10/3/2003 | 10/3/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 10/3/03. S.Landaluce
|
BLD-Conference | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | PASS |
Jim Sly
|
|
|
frank ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Explain dampers req at bsmnt, 1hr walls........ 9/25/2003 12:56:04 PM
|
BLD-Foundation | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | PASS |
Russ Owen
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PART |
Russ Owen
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Annette Moore rear retaining footing. 3/12/2003 10:04:04 AM
|
BLD-Conference | 3/3/2003 | 3/4/2003 | 3/4/2003 | A | PART |
Russ Owen
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Darla Downs. general questions. 3/4/2003 10:33:18 AM
|
Issue PAID IN FULL permit | | | 2/21/2003 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/9/2003 | | 2/20/2003 | | PASS |
Carl Westfall
|
|
|
2/20/2003 08:36:50 CJW - activity updated through activity BLDA022 from case BLD02-03096.
|
Routing - PLAN CHECK | 2/19/2003 | | 2/20/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/20/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2003 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PUBLIC WORKS | 2/11/2003 | | 2/19/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/31/2003 | | 2/11/2003 | | PASS |
|
|
|
Drawings approved.
|
Plan resubmittals received | | | 2/10/2003 | | DONE |
|
|
|
Received two copies of resubmittal sheet A-1, (1) ACHD Letter, and (1) cover letter with transmittal. Routed to Carl Westfall.
|
Routing - PLUMBING | 1/30/2003 | | 2/1/2003 | | PASS |
|
|
|
provide an r.p. on the boiler make up water line.
|
Plan Review Completed(1st rev) | | | 1/30/2003 | | DONE |
|
|
|
|
Routing - FIRE | 1/29/2003 | | 1/30/2003 | | PASS |
|
|
|
NO CORRECTIONS REQUIRED
|
Routing - PLAN CHECK | 1/22/2003 | | 1/29/2003 | | |
|
|
|
Failed first UBC review. UBC plan review started January 27, 2003 and finished January 29, 2003. A response from the architect was required. See the conditions list.
|
Routing - PLANNING | 1/17/2003 | | 1/22/2003 | | PASS |
|
|
|
Approved per DRH02-49.
|
Routing - Erosion and Sediment | 1/14/2003 | | 1/17/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 1/9/2003 | | 1/14/2003 | | |
|
|
|
Failed first Public Works review. Requires drainage plan revisiona and O&M plan, per Brian M. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 1/2/2003 | | DONE |
|
|
|
|
Application received | | | 12/31/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/31/2002 | | DONE |
|
|
|
|
Fee Review-notes | 12/31/2002 | 12/31/2002 | | | |
|
|
|
request contract on this job.....mec value is low
|