Permit Information
Permit NumberBLD02-03096
StatusFinaled
Name CLOVERDALE PLUMBING (OFFICE)
Site Address 11603 W FAIRVIEW AVE
Project NameCLOVERDALE PLUMBING
Customer Number 
ePlanReviewNo
Description
(CLOVERDALE PLUMBING - CONVERT HOUSE TO OFFICE) This building is not fire sprinklered. To convert a 1,619 square foot single family dwelling to an office building. The first floor has a floor area of 896 square feet and the basement has a floor area of 723 square feet. Work is to include 2 restrooms accessible to the disabled, an interior stairway serving the basement, an exterior concrete stairway with retaining walls serving the basement, new windows, new roofing, new siding, enclosure of the basement, interior walls, and guardrails all per approved drawings, engineering, and plan review conditions on file. DRH02-00049 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 3/16/20054/26/2005 DONE
Permanent occupancy UNPAID FEE  3/16/2005 DONE
Perm. Occ. Cert. # 10477 issued 3-16-05 to Cloverdale Plumbing.
Permanent Occupancy 3/10/20053/10/2005 DONE
Details
BLD-Final3/10/20053/10/20053/10/2005PPASS
DetailsJim Sly
Contact Randy Calkins; Phone #: ###-#### OK for Perm Occ. :) 3/10/2005 3:25:11 PM 3/10/2005 3:25:28 PM
BLD-Final2/14/20052/15/20052/15/2005APART
DetailsLane Manuel
For access, see Cloverdale Plumbing, next building to the West.; Phone #: ###-####
temp c of o ok.
c/n on site. 2/15/2005 9:55:40 AM
FIRE-Final Inspection2/11/20052/14/20052/14/2005APASS
DetailsTroy Cobbley
Fire life safety passed. Address to be mounted before structural sign off 2/14/2005 10:16:06 AM
Code Occupancy Approval  2/10/2005 PASS
ALL IN AS REQUIRED FINAL SIGNED OFF.
BLD-Conference7/22/20047/23/20047/23/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/22/2004 at 9:46:33 AM. Contact: ###-####. arch to address gauard rail at street 7/23/2004 9:43:55 AM
BLD-Energy code compliance3/30/20043/30/20043/30/2004PPASS
DetailsJim Sly
frank; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in3/9/20043/9/20043/9/2004PPASS
DetailsJim Sly
frank; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in2/12/20042/13/20042/13/2004ACANC
DetailsJim Sly
FRANK; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
PubWorks Occupancy Approval10/3/200310/3/200310/3/2003 DONE
Drainage project complete, signed permanent occupancy 10/3/03. S.Landaluce
BLD-Conference9/25/20039/25/20039/25/2003PPASS
DetailsJim Sly
frank ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Explain dampers req at bsmnt, 1hr walls........ 9/25/2003 12:56:04 PM
BLD-Foundation3/13/20033/13/20033/13/2003PPASS
DetailsRuss Owen
frank; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing3/11/20033/12/20033/12/2003APART
DetailsRuss Owen
frank; Phone #: ###-#### Internet Inspection Request from: Annette Moore rear retaining footing. 3/12/2003 10:04:04 AM
BLD-Conference3/3/20033/4/20033/4/2003APART
DetailsRuss Owen
frank; Phone #: ###-#### Internet Inspection Request from: Darla Downs. general questions. 3/4/2003 10:33:18 AM
Issue PAID IN FULL permit  2/21/2003 DONE
Plan assigned to (CJW)1/9/2003 2/20/2003 PASS
DetailsCarl Westfall
2/20/2003 08:36:50 CJW - activity updated through activity BLDA022 from case BLD02-03096.
Routing - PLAN CHECK2/19/2003 2/20/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/20/2003 PASS
Inspection Record Card- Bld  2/20/2003 DONE
Print Occupancy Form  2/20/2003 DONE
Telephone call  2/20/2003 DONE
permit ready and fees due
Routing - PUBLIC WORKS2/11/2003 2/19/2003 PASS
Routing - PLAN CHECK1/31/2003 2/11/2003 PASS
Drawings approved.
Plan resubmittals received  2/10/2003 DONE
Received two copies of resubmittal sheet A-1, (1) ACHD Letter, and (1) cover letter with transmittal. Routed to Carl Westfall.
Routing - PLUMBING1/30/2003 2/1/2003 PASS
provide an r.p. on the boiler make up water line.
Plan Review Completed(1st rev)  1/30/2003 DONE
Routing - FIRE1/29/2003 1/30/2003 PASS
NO CORRECTIONS REQUIRED
Routing - PLAN CHECK1/22/2003 1/29/2003  
Failed first UBC review. UBC plan review started January 27, 2003 and finished January 29, 2003. A response from the architect was required. See the conditions list.
Routing - PLANNING1/17/2003 1/22/2003 PASS
Approved per DRH02-49.
Routing - Erosion and Sediment1/14/2003 1/17/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS1/9/2003 1/14/2003  
Failed first Public Works review. Requires drainage plan revisiona and O&M plan, per Brian M. kmm
Plans ACCEPTED BY PLAN TECH  1/2/2003 DONE
Application received  12/31/2002  
Recd Pcfee & Taken To Pln CK  12/31/2002 DONE
Fee Review-notes12/31/200212/31/2002   
request contract on this job.....mec value is low