Case Summary (BLD) | | | 8/8/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/22/2013 | | DONE |
|
|
|
|
Fee Review-notes | 12/31/2002 | 12/31/2002 | 8/10/2004 | | DONE |
|
|
|
|
BLD-Final | 10/28/2003 | 10/28/2003 | 10/28/2003 | P | PASS |
Dave Hannah
|
|
|
Dan//late afternoon please.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for prem occ 10/28/2003 3:00:56 AM
|
First Notice | | 10/28/2003 | 10/28/2003 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 10/28/2003 | | DONE |
|
|
|
Perm. Occ. Cert. # 9858 issued 10-28-03 to the Daniel McDown Triplex.
|
PubWorks Occupancy Approval | 10/27/2003 | 10/27/2003 | 10/27/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 10/27/03. R.Rokovitz
|
Permanent Occupancy | | 10/27/2003 | 10/27/2003 | | DONE |
|
|
|
|
BLD-Final | 10/27/2003 | 10/27/2003 | 10/27/2003 | P | FAIL |
Dave Hannah
|
|
|
###-#### Dan handrails landings temp glass gaurdrail in garage 10/27/2003 5:18:03 AM
|
FIRE-Final Inspection | 10/22/2003 | 10/23/2003 | 10/23/2003 | A | PASS |
Rick Jackson
|
|
|
###-#### dan didn't have address or steps/landings at exterior doors but will have for sructural inspector 10/23/2003 10:38:45 AM
|
BLD-Wall cover | 9/3/2003 | 9/3/2003 | 9/3/2003 | P | PART |
Dave Hannah
|
|
|
###-#### dan 9/3/2003 1:10:31 PM ok to finish rocking down stairs two appartments 9/3/2003 1:13:34 PM
|
BLD-Framing/Rough-in | 8/26/2003 | 8/27/2003 | 8/26/2003 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/26/2003 | 8/26/2003 | 8/26/2003 | P | CANC |
Dave Hannah
|
|
|
###-#### dan
|
BLD-Framing/Rough-in | 8/19/2003 | 8/19/2003 | 8/19/2003 | P | PART |
Carl Dependahl
|
|
|
dan drywall spot check; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | PART |
Carl Dependahl
|
|
|
###-####--late please....ok to rock 1st fl, keep c/n re garage & chk 1hr lid fasteners. 8/15/2003 4:41:46 PM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PART |
Carl Dependahl
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...keep c/n, ok to cover 2nd fl front only 8/14/2003 3:57:41 PM
|
BLD-Framing/Rough-in | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Carl Dependahl
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...c/n attic trusses, fireblocks; ok to insulate front units only. advised to remove porch at west side per agreement. 8/13/2003 6:22:08 PM
|
CHANGE STATUS TO (ISS) | | | 8/13/2003 | | DONE |
|
|
|
per carl no fn yet
|
Case Summary (BLD) | | | 8/11/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | NR |
Carl Dependahl
|
|
|
Shear nailing at "main" house...ok to side & insulate/rock behind tubs 7/10/2003 9:42:12 AM
|
BLD-Footing | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | PART |
Carl Dependahl
|
|
|
garage/carport ftg. util rm area ftg ok 7/10/2003 9:43:14 AM
|
BLD-Framing/Rough-in | 7/9/2003 | 7/9/2003 | 7/9/2003 | P | NR |
Carl Dependahl
|
|
|
consultation only re draft stops, rated const, roof frame ( add pulins or? to support rafters as needed.) 7/9/2003 5:53:58 PM
|
DOC - Permit Finaled | 7/9/2003 | 7/9/2003 | 7/9/2003 | P | CANC |
Carl Dependahl
|
|
|
Finaled by inspector at 7/9/2003 5:54:58 PM This permit was finaled in error. 8-11-03 jlg.
|
BLD-Conference | 7/9/2003 | 7/9/2003 | 7/9/2003 | P | PASS |
Carl Dependahl
|
|
|
DAN ###-####...met owner...ok to install insul at rear wall behind tubs. 7/9/2003 4:21:19 PM
|
Override - Parcel Holds | | | 7/9/2003 | | |
|
|
|
|
BLD-Conference | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | PASS |
Tom Arcoraci
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip discussed fire blocking and general framing 6/13/2003 10:06:24 AM 6/13/2003 10:07:09 AM
|
Issue PAID IN FULL permit | | | 5/9/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/9/2003 | | |
|
|
|
|
Print Occupancy Form | | | 4/3/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2003 | | DONE |
|
|
|
permit ready and need ACHD
|
Routing - PLAN CHECK | 3/3/2003 | | 4/2/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2003 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/2/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/2/2003 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/7/2003 | | 4/2/2003 | | PASS |
Mike Phillips
|
|
|
4/2/2003 10:41:04 M_P - activity updated through activity BLDA022 from case BLD02-03098.
|
Plan resubmittals received | | | 3/13/2003 | | |
|
|
|
RECEIVED TWO SETS OF PLANS SHEETS 1,3,4,5,6, AND TWO SETS S.8, S.9
|
Routing - PLANNING | 3/4/2003 | | 3/4/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/3/2003 | | 3/3/2003 | | FAIL |
|
|
|
Second review failed sent correction report to designer. Requesting additional information to be submitted for further review prior to issuing permit.
|
Routing - Erosion and Sediment | 1/31/2003 | | 2/3/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 1/31/2003 | | 1/31/2003 | | PASS |
|
|
|
|
Routing - FIRE | 1/29/2003 | | 1/30/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/29/2003 | | |
|
|
|
Received fire flow and hydrant location information.
|
Routing - PLAN CHECK | 1/28/2003 | | 1/29/2003 | | |
|
|
|
Routing to Fire, received fire flow and hydrant location information.
|
Routing - PUBLIC WORKS | 1/23/2003 | | 1/28/2003 | | FAIL |
|
|
|
|
Routing - FIRE | 1/28/2003 | | 1/28/2003 | | FAIL |
|
|
|
resubmittal shows hydrant at excessive distance. No water flow quote.
|
Routing - PLAN CHECK | 1/21/2003 | | 1/23/2003 | | |
|
|
|
Routed to Public Works.
|
Routing - FIRE | 1/17/2003 | | 1/21/2003 | | FAIL |
|
|
|
HYDRANT LOCATION & WATER SUPPLY QUOTE
|
Plan Review Completed(1st rev) | | | 1/21/2003 | | FAIL |
|
|
|
|
Print permit w/o conditions | | | 1/17/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 1/14/2003 | | 1/17/2003 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information to be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 1/15/2003 | | DONE |
|
|
|
Received two copies of ESC plan, narative and application. One copy of letter to Brian M. one O&M plan and one soils report. Routed to Mike P. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 1/15/2003 | | DONE |
|
|
|
|
Routing - PLUMBING | 1/10/2003 | | 1/13/2003 | | CANC |
|
|
|
no plan no review
|
Routing - Erosion and Sediment | 1/9/2003 | | 1/10/2003 | | FAIL |
|
|
|
Waiver Letter
Waiver not approved. An ESC plan is required for this project. Discussed requirements with owner rep.
|
Routing - PUBLIC WORKS | 1/7/2003 | | 1/9/2003 | | FAIL |
|
|
|
Per Brian Murphy
|
Plan routing begun/NEW & ADDTN | | | 1/7/2003 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 1/7/2003 | | 1/7/2003 | | PASS |
|
|
|
Lot 1 of Neilley's Subdivision
|
Plans ACCEPTED BY PLAN TECH | | | 1/7/2003 | | PEND |
|
|
|
Requires three extra copies of civil sheets, O&M manual and drainage calcs. Arch/Eng. record form needs to be signed. Contacted Eric Anderson of these needs. kmm
|
Application received | | | 12/31/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/31/2002 | | DONE |
|
|
|
|