Permit Information
Permit NumberBLD02-03102
StatusFinaled
Name STOEL RIVES LLP
Site Address 101 S CAPITOL BLVD Unit: 1900
Project NameUS BANK-19TH FLR
Customer Number 
ePlanReviewNo
Description
(STOEL RIVES LLP - 19TH FLOOR) This building is fire sprinklered because it is a high-rise. To install about 5,600 square feet of new suspended ceilings within an existing 11,830 square foot whole floor office tenant space. Selective demolition of the existing ceiling is covered under this permit. All new work shall comply with the approved drawings and the plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Fee Review-notes12/31/200212/31/20026/30/2004 DONE
DOC - Permit Finaled6/14/20046/14/20046/14/2004PPASS
DetailsDave Hannah
Finaled by inspector at 6/14/2004 12:41:34 PM
BLD-Aging Inspection6/10/20046/10/20046/10/2004 PASS
DetailsDave Hannah
FIRE-Final Inspection3/13/20033/13/20033/13/2003APASS
DetailsRick Jackson
BLD-Framing/Rough-in2/18/20032/19/20032/19/2003APART
DetailsCarl Dependahl
###-####...grid ok pend other trades
2/20/2003 11:15:31 AM
BLD-Framing/Rough-in2/6/20032/7/20032/7/2003ANR
DetailsCarl Dependahl
###-#### duane need elec, hvac will ok entire grid when ready... 2/7/2003 2:25:22 PM
BLD-Framing/Rough-in2/7/20032/7/20032/7/2003PPART
DetailsCarl Dependahl
Duane, grid at south 1/2...ok pend elec & hvac; work is phased. 2/7/2003 2:24:33 PM
BLD-Conference2/6/20032/6/20032/6/2003APASS
DetailsCarl Dependahl
w/ 350 re htg...will ok when done partial ok for w.i.p. at grid. 2/6/2003 11:23:08 AM
Issue PAID IN FULL permit  1/29/2003 DONE
Inspection Record Card- Bld  1/27/2003 DONE
Telephone call  1/27/2003 DONE
permit ready and fees due
Routing - PLAN CHECK1/24/2003 1/24/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/24/2003 PASS
Plan assigned to (CJW)1/10/2003 1/24/2003 PASS
DetailsCarl Westfall
1/24/2003 16:06:52 CJW - activity updated through activity BLDA022 from case BLD02-03102.
Routing - FIRE1/21/2003 1/23/2003 PASS
Routing - PLAN CHECK1/13/2003 1/21/2003 PASS
UBC plan review started January 21, 2003 and finished the same day. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS1/10/2003 1/13/2003 PASS
Plans ACCEPTED BY PLAN TECH  1/2/2003 DONE
Application received  12/31/2002  
Recd Pcfee & Taken To Pln CK  12/31/2002