BLD-Final | 12/2/2003 | 12/3/2003 | 12/3/2003 | A | PASS |
Dave Hannah
|
|
|
Jack; Phone #: ###-#### please call first for access. thanks.Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 12/3/2003 | 12/3/2003 | 12/3/2003 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 12/3/2003 10:05:03 AM
|
BLD - Request for Extension | 11/7/2003 | 11/7/2003 | 11/7/2003 | P | PASS |
Dave Hannah
|
|
|
###-#### virgil ###-#### cell phone ok to extend 11/7/2003 2:02:12 PM
|
PostCard Mailed | | | 11/5/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Conference | 4/14/2003 | 4/15/2003 | 4/15/2003 | A | PASS |
Dave Hannah
|
|
|
Dave: Per George: check side setbacks as we rec'd an inquiry from neighbor at 810 E. Bannock re 5' req'd setback. Please leave a note of findings at that address. Call George or Carl if questions. all set backs are ok checked lot line and set back with home owner at 810 4/15/2003 10:05:52 AM
|
BLD-Framing/Rough-in | 4/3/2003 | 4/4/2003 | 4/4/2003 | P | PASS |
Dave Hannah
|
|
|
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover int and ext 4/4/2003 12:59:42 PM
|
(F) Reprint permit | | | 2/10/2003 | | DONE |
|
|
|
|
BLD-Footing | 1/13/2003 | 1/13/2003 | 1/13/2003 | P | PASS |
Dave Hannah
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie owner pouring ftg and wall at same time 1/13/2003 12:58:30 PM
|
Application received | | | 1/3/2003 | | |
|
|
|
|
Plan assigned to (PEP) | 1/3/2003 | | 1/3/2003 | | PASS |
Perry Paine
|
|
|
1/3/2003 14:41:52 PEP - activity updated through activity BLDA022 from case BLD03-00006.
|
Print Pending Permit.LaserJet4 | | | 1/3/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/3/2003 | | DONE |
|
|
|
|