BLD-Final | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PASS |
Tony Young
|
|
|
Tony; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 11/14/2003 1:39:16 PM
|
BLD-Final | 11/11/2003 | 11/12/2003 | 11/12/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/11/2003 at 8:29:42 AM. Contact: ###-####. c/n given to contractor on site. 11/11/2003 8:06:14 PM
|
BLD-Grading Inspection | 10/16/2003 | 10/16/2003 | 10/16/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Final | 10/6/2003 | 10/6/2003 | 10/6/2003 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/6/2003 at 11:04:53 AM. Contact: ###-####.
need trades 1st, and hillside signed off 10/6/2003 1:53:03 PM
|
BLD-Framing/Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 8:58:22 AM. Contact: ###-####.
garage fix is ok pending eng. approval 8/8/2003 3:18:31 PM
|
BLD-Energy code compliance | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 4:55:31 PM. Contact: ###-####.
ok to cover all except where fix is needed at garage/basement wall 7/11/2003 1:50:46 PM
|
BLD-Framing/Rough-in | 7/2/2003 | 7/3/2003 | 7/3/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/2/2003 at 4:40:45 PM. Contact: ###-####.
ok to insulate, c/n posted 7/3/2003 12:00:37 PM
|
BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 3:08:11 AM. Contact: ###-####.
c/n posted, also need eng. letter of ok on as built on conection of slab to wall, not per plan. 7/1/2003 3:38:35 PM
|
BLD-Framing/Rough-in | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PART |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Annette Moore shear all c/n items completed ok to cover ext 6/20/2003 6:16:26 PM
|
BLD-Framing/Rough-in | 6/15/2003 | 6/16/2003 | 6/16/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/15/2003 at 10:08:14 AM. Contact: ###-####.
c/n posted on shear straps 6/16/2003 1:21:16 PM
|
BLD-Foundation | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PART |
Tony Young
|
|
|
###-####
wip on tall walls 5/8/2003 11:21:35 AM
|
BLD-Foundation | 4/28/2003 | 4/29/2003 | 4/29/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 6:49:07 PM. Contact: ###-####.
wip, 4' walls in rear 4/29/2003 3:27:26 PM
|
BLD-Footing | 4/25/2003 | 4/28/2003 | 4/28/2003 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Footing | 4/28/2003 | 4/28/2003 | 4/28/2003 | P | PART |
Tony Young
|
|
|
wip on rear ftgs 4/28/2003 2:58:54 PM
|
BLD-Grading Inspection | 4/28/2003 | 4/28/2003 | 4/28/2003 | | DONE |
Rita DeYoung
|
|
|
the geotechnical engineer has approved the subgrade for the west and north footings.
|
BLD-Framing/Rough-in | 4/17/2003 | 4/17/2003 | 4/17/2003 | P | PART |
Steven Webb
|
|
|
joel; Phone #: ###-#### Internet Inspection Request from: Darla Downs--FOUNDATION not framing--retaining wall and south house wall--ok--rebar per or better than approved plans. 4/17/2003 3:59:12 PM
|
BLD-Grading Inspection | 4/16/2003 | 4/16/2003 | 4/16/2003 | | PASS |
Rita DeYoung
|
|
|
FOOTING SUBGRADE FOR DRIVEWAY RETAINING WALLS HAS BEEN APPROVED.
|
BLD-Footing | 4/14/2003 | 4/15/2003 | 4/15/2003 | A | PART |
Steven Webb
|
|
|
joel; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip--front retaining wall and lower downhill side. 4/15/2003 11:12:50 AM
|
BLD-Footing | 3/24/2003 | 3/24/2003 | 3/24/2003 | P | PART |
Alan Hauser
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
upper tall retaining walls, ok, wip 3/24/2003 1:23:58 PM
|
BLD-Footing | 3/18/2003 | 3/19/2003 | 3/19/2003 | A | PART |
Tony Young
|
|
|
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
front ftgs ok 3/19/2003 2:30:25 PM
|
BLD-Footing | 3/17/2003 | 3/18/2003 | 3/18/2003 | P | NR |
Tony Young
|
|
|
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Grading Inspection | 3/17/2003 | 3/17/2003 | 3/17/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
BLD-Footing | 3/10/2003 | 3/11/2003 | 3/11/2003 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/10/2003 at 12:04:20 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 3/5/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 2/13/2003 | | 2/25/2003 | | PASS |
Steve Munroe
|
|
|
2/25/2003 15:36:08 SAM - activity updated through activity BLDA022 from case BLD03-00008.
|
Routing - PLAN CHECK | 2/13/2003 | | 2/25/2003 | | DONE |
|
|
|
|
Routing - PLANNING | 2/25/2003 | | 2/25/2003 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 2/25/2003 | | |
|
|
|
|
Plan Review Report | | | 2/25/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/25/2003 | | DONE |
|
|
|
permit ready
|
Routing - Erosion and Sediment | 2/19/2003 | | 2/19/2003 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - FIRE | 2/12/2003 | | 2/13/2003 | | DONE |
|
|
|
No fire sprinklers required (Highlands Unit 15)
|
Routing - PLAN CHECK | 2/7/2003 | | 2/12/2003 | | HOLD |
|
|
|
Started review while waiting for P&Z approval. Routing plans on to ESC and fire.
|
Routing - Erosion and Sediment | 2/12/2003 | | 2/12/2003 | | FAIL |
|
|
|
|
Routing - PLANNING | 1/16/2003 | | 2/7/2003 | | PEND |
|
|
|
Pending P&Zhearing and approval. 1/23/2003 Returned to Plan Review until appeal period is up.
|
Pending Assignment by DJO | 1/6/2003 | | 2/7/2003 | | DONE |
Dan Overy
|
|
|
2/7/2003 13:33:59 SAM - activity updated through activity BLDA183 from case BLD03-00008.
|
Routing - PUBLIC WORKS | 1/16/2003 | | 1/16/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 1/16/2003 | | 1/16/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 2 with conditions of approval in letter from Boise Public Works attached to the plans.
|
Routing - PUBLIC WORKS GRADING | 1/6/2003 | | 1/8/2003 | | FAIL |
Rita DeYoung
|
|
|
ENGINEERING REPORTS MUST DE STAMPED
|
Application received | | | 1/6/2003 | | |
|
|
|
|