Case Summary (BLD) | | | 8/23/2005 | | |
|
|
|
|
BLD-Framing/Rough-in | 11/12/2003 | 11/13/2003 | 11/13/2003 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 11/13/2003 | 11/13/2003 | 11/13/2003 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/13/2003 | 11/13/2003 | 11/13/2003 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 11/13/2003 10:11:23 AM
|
BLD-Framing/Rough-in | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | CANC |
Russ Owen
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Annette Mooreout of time 11/12/2003 12:21:23 AM
|
BLD-Final | 11/10/2003 | 11/10/2003 | 11/10/2003 | P | FAIL |
Jim Storey
|
|
|
###-#### les milburn building ok c/n for handrail on stairs the only isue to be resolved. 11/10/2003 2:02:06 PM
|
PostCard Mailed | | | 11/5/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Energy code compliance | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | PASS |
Jim Storey
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Plan Reviewer's activity | | | 3/24/2003 | | |
|
|
|
homeowner came in to ask about adding a code complying stair to the exterior of the unit to access the upper level storage rather than using the interior pull down ladder. I printd out the code sections for code complying exterior stairways. 3/24/2003 8:45a.m.
|
BLD-Framing/Rough-in | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | PASS |
Steven Webb
|
|
|
RE-INSP- ###-####- LES Corrections made--ok to insulate. 3/21/2003 3:05:11 PM
|
BLD-Framing/Rough-in | 3/18/2003 | 3/19/2003 | 3/19/2003 | P | NH |
Russ Owen
|
|
|
LES; Phone #: ###-#### Internet Inspection Request from: Annette Moore Locked out left note that I was here. 3/19/2003 2:01:57 PM
|
BLD-Framing/Rough-in | 3/11/2003 | 3/11/2003 | 3/11/2003 | P | FAIL |
Carl Dependahl
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Annette Moore...c/n, truss eng'g, bracing, nailing, attic vents... 3/11/2003 6:11:53 PM
|
Case Summary (BLD) | | | 2/7/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/7/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/7/2003 | | DONE |
|
|
|
permit ready and fees due
|
BLD-Conference | 1/28/2003 | 1/28/2003 | 1/28/2003 | P | PASS |
Carl Dependahl
|
|
|
foundation inplace, ok to move man door, minor change ok. w/ Owner 1/28/2003 3:53:31 PM
|
BLD-Foundation | 1/21/2003 | 1/23/2003 | 1/23/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/21/2003 at 18:41:39. Contact: .
|
BLD-Footing | 1/17/2003 | 1/21/2003 | 1/21/2003 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/17/2003 at 15:52:52. Contact: . setback ok...steel in ok; will need future scrutiny...not approved for ADU 1/21/2003 5:06:26 PM
|
BLD-Conference | 1/17/2003 | 1/17/2003 | 1/17/2003 | A | PASS |
Carl Dependahl
|
|
|
Met w/ adjacent property owner...referred to zoning as he stated that permitee actually wants to build apartment. There is a valid permit but the plan is not very detailed...regarding actual construction.
|
Application received | | | 1/6/2003 | | |
|
|
|
|
Plan assigned to (PEP) | 1/6/2003 | | 1/6/2003 | | PASS |
Perry Paine
|
|
|
1/6/2003 13:23:07 PEP - activity updated through activity BLDA022 from case BLD03-00010.
|
Print Pending Permit.LaserJet4 | | | 1/6/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/6/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/6/2003 | | |
|
|
|
|
CHANGE ISSUED DATE | | | 1/6/2003 | | |
|
|
|
|