PubWorks Occupancy Approval | 7/20/2004 | 7/20/2004 | 7/20/2004 | | DONE |
|
|
|
Letter received from engineer. Per B.Murphy signed permanent occupancy 7/20/04. D.Erskine
|
BLD - Request for Extension | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PASS |
Jim Storey
|
|
|
David ###-#### wip ok 11/21/2003 3:02:20 PM
|
DOC-Permit Expired | 10/24/2003 | 10/24/2003 | 10/24/2003 | | DONE |
Jim Storey
|
|
|
Permit expired by limitations.
|
Reopen Permit (ISS) | | | 10/23/2003 | | DONE |
|
|
|
Per George Slane wants to get job done
|
DOC-Permit Expired | 8/19/2003 | 8/19/2003 | 8/19/2003 | | FAIL |
Jim Storey
|
|
|
Permit expired by limitations.work in progess. 8/19/2003 8:17:44 AM
|
BLD-Aging Inspection | 6/2/2003 | 6/2/2003 | 6/2/2003 | | PASS |
Jim Storey
|
|
|
work in progess. 6/2/2003 2:50:32 PM
|
Routing - FIRE | 2/25/2003 | | 3/3/2003 | | PASS |
|
|
|
approved by Dave Miller
|
Routing - PUBLIC WORKS | 2/27/2003 | | 3/3/2003 | | PASS |
|
|
|
send to PW as soon as possible per Brian Murphy. dkl
|
Routing - PLAN CHECK | 3/3/2003 | | 3/3/2003 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/3/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/3/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2003 | | DONE |
|
|
|
permit ready
|
Issue PAID IN FULL permit | | | 3/3/2003 | | DONE |
|
|
|
|
Routing - PLUMBING | 2/24/2003 | | 2/25/2003 | | PASS |
|
|
|
SEWER LINE FROM OFFICE BLDG IS A GRAVITY LINE NOT A PRESSURE SEWER LINE AS SHOWN ON RESUBMITTED PLANS.
|
Routing - PUBLIC WORKS | 2/13/2003 | | 2/24/2003 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian M. kmm
|
Routing - PLAN CHECK | 1/24/2003 | | 2/13/2003 | | |
|
|
|
Plans in hold box. kmm
|
Routing - FIRE | 1/22/2003 | | 1/24/2003 | | FAIL |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/24/2003 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 1/21/2003 | | 1/22/2003 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian M. kmm
|
Routing - PLUMBING | 1/21/2003 | | 1/22/2003 | | FAIL |
|
|
|
1. inlet and outlets of septic tank must have santee's with drop legs 2. storm drainage from shop shall discharge into sand and grease interceptor and to sanitary sewer. 3. wash rack shall be covered and also drain to sand and grease interceptor to sanitary sewer.
|
Routing - PLANNING | 1/17/2003 | | 1/17/2003 | | PASS |
|
|
|
Approved per DRH02-00143. Floodplain issues will be addressed through Public Works. Plans passed on to Planning.
|
Routing - Erosion and Sediment | 1/15/2003 | | 1/17/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 1/9/2003 | | 1/15/2003 | | FAIL |
|
|
|
Requires Drainage plan revisions per Brian M. Plans do not comply with requirements of CFH02-00029. 1) Floodplain in correct, 20 no site grading in flood zone. per JJ. kmm
|
Routing - PLANNING Land Div | 1/8/2003 | | 1/9/2003 | | PASS |
|
|
|
For grading only. Prior to issuance of building permit, need recorded deed with metes and bounds description and new tax parcel #.
|
Application received | | | 1/8/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/8/2003 | | DONE |
|
|
|
|