Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00062
StatusFinaled
Name INLAND CRANE INC.
Site Address 6931 SUPPLY WAY
Project NameInland Crane/shop building
Customer Number 
ePlanReviewNo
Description
Inland Crane Shop Building (Fabrication Shop with some Equipment Maintenance) - To construct a 14,500 square foot, one story, pre-engineered steel building. This is a pre-erected building (old Boise Cascade hanger) that is being disassembled and reconstructed on this site. This permit also includes the construction of a 1500 square foot mezzanine at the east end of the hanger building and to construct a new 3900 square foot metal building addition on the west end of the hanger building and to construct a 350 square foot breakroom/restroom at the southeast corner of the hanger building under the mezzanine. The addition is marked future on the plans but is part of this building permit. The total building area is 19,900 square feet. All construction per the approved plans and attached comment list. DRH02-00143/PC#012-03 Grading under sep. permit/plans BLD03-00027
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 7/27/20044/26/2005 DONE
Permanent occupancy UNPAID FEE  7/27/2004 DONE
Perm. Occ. Cert. # 10243 issued 7-27-04 to Inland Crane, Inc.
Permanent Occupancy 7/22/20047/22/2004 DONE
Details
FIRE-Final Inspection7/21/20047/22/20047/22/2004APASS
DetailsRick Jackson
BLD-Final7/22/20047/22/20047/22/2004APASS
DetailsJim Storey
BLD-Grading Inspection7/19/20047/20/20047/20/2004ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/19/2004 at 1:57:43 PM.
Code Occupancy Approval7/20/20047/20/20047/20/2004APASS
DetailsWm. Michael Meloy
Compliance met. 7/20/2004 10:00:09 AM
BLD-Final6/30/20047/1/20047/1/2004PPART
DetailsJim Storey
David; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes pending all other sign offs. recived and filed engineers and si final reports. 7/1/2004 3:08:33 PM
FIRE-Conference6/28/20046/28/20046/28/2004PPART
DetailsRick Jackson
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore The fire hydrant will be moved closer to curb and higher 6/28/2004 2:53:33 PM
BLD-Framing/Rough-in5/4/20045/4/20045/4/2004PPASS
DetailsJim Storey
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore shop resaroom framing ok. 5/4/2004 3:37:40 PM
BLD-Aging Inspection5/3/20045/3/20045/3/2004 PASS
DetailsJim Storey
wip 5/3/2004 8:21:17 AM
BLD-Conference3/1/20043/2/20043/2/2004APASS
DetailsJim Storey
DAVE ; Phone #: ###-#### Internet Inspection Request from: Annette Moore steel erection complet pending enginners review and special insp. report of welding. 3/2/2004 9:33:26 AM
BLD-Aging Inspection2/11/20042/11/20042/11/2004 PART
DetailsJim Storey
wip 2/11/2004 9:51:03 AM
BLD-Aging Inspection12/1/200312/1/200312/1/2003 PART
DetailsJim Storey
wip 12/1/2003 10:16:25 AM
BLD-Aging Inspection9/30/20039/30/20039/30/2003 PASS
DetailsJim Storey
wip. 9/30/2003 8:22:43 AM
BLD-Footing7/28/20037/29/20037/29/2003APART
DetailsJim Storey
todd; Phone #: ###-#### Internet Inspection Request from: Annette Moore spec\ial ins log pass wip on main bldg. ok. 7/29/2003 8:54:44 AM
BLD-Conference7/8/20037/9/20037/9/2003APASS
DetailsJim Storey
###-####
(F) Reprint permit  6/10/2003  
Issue PAID IN FULL permit  6/9/2003 DONE
Routing - PLAN CHECK6/3/2003 6/4/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/4/2003 PASS
Inspection Record Card- Bld  6/4/2003 DONE
Print Occupancy Form  6/4/2003 DONE
Telephone call  6/4/2003 DONE
left mess that permit is ready
Plan assigned to (JCM)1/17/2003 6/4/2003 PASS
DetailsJohn Menard
6/4/2003 09:01:52 JCM - activity updated through activity BLDA022 from case BLD03-00062.
Routing - PLAN CHECK6/3/2003 6/3/2003  
Routing - PLANNING Land Div6/3/2003 6/3/2003 PASS
Approved. New deed recorded with one legal description and new tax parcel #.
Plan resubmittals received  6/3/2003 DONE
received letter of transmittal from Leavitt & Assoc., Response letter to Sam R. Response letter to John M. two fire code review comments to Mr. Reese, two copies of EO-3,E4, M1.0, M3.0 and taken to John M.
Routing - FIRE5/22/2003 6/2/2003 PASS
Occupancy classification and additional information from architect acceptable.
Routing - PLAN CHECK5/22/2003 5/22/2003 PASS
Plan Reviewer's activity  5/22/2003 PASS
Reviewed and approved resubmittals as submitted. It was determined, with discussions with Sam Rogers & Dave Miller, that the occupancy group this shop building most closely resembled was an F-1 (fabrication & maintenance). JCM
Routing - PLANNING Land Div5/21/2003 5/21/2003 FAIL
Need to submit recorded deed with one metes and bounds description and one new tax parcel number.
Routing - FIRE5/8/2003 5/20/2003 FAIL
review comments discussed with, and faxed to, Architect, Reese Leavitt
Plan resubmittals received  5/19/2003 DONE
received transmittal letter, letter of response from Leavitt & Assoc., letter of transmittal form Engineering Consultants Inc.,3 page Letter from Jon Rose., Product information from Fibrex. Two sets of 2 of 37, 3-37, 5-37, 15-37, 31-37, 32-37, 33-37, 34-37, 35-37, 36-37, 37-37 M1.0, M3.0, ES-2, E-4, EO-2, 3 ofA-1,
Plan Reviewer's activity  5/8/2003  
Spoke with Jim Wylie about the flood plain condition on this site. He indicated that this building was not in the flood plain area and would not require an elevation certificate. JCM
Plan resubmittals requested  5/7/2003  
Faxed the engineer a copy of the plan review comment list and a copy of the cover letter requesting revisions. JCM
Routing - PLAN CHECK4/21/2003 5/7/2003 FAIL
Routing Off Site - STRUCTURAL4/25/2003 5/5/2003 PASS
Contacted PDQ to take resubs of 4/24/03 to outside engineering. kmm Received letter from the consulting structural engineer approving the last resubmittals. No further review required. JCM
Plan resubmittals received  4/24/2003 DONE
Response letter, three structural calculations, two sets of 1 of 37 rev.2 thru.37of37 rev.2 routed to John M.
Routing - PUBLIC WORKS4/17/2003 4/21/2003 PASS
Routing - PUBLIC WORKS4/15/2003 4/16/2003 FAIL
No plumbing plans for wash pod and valve arangement. Additional perview requirred by Public Works Environmental. WBP.
Routing - PLUMBING4/11/2003 4/15/2003 PASS
oil and water interceptor for shop and wash area to meet criteria for flammable liquids. see attached drawing
Plan resubmittals requested  4/14/2003  
Faxed the project engineer a copy of he comment list from the consulting engineer requesting additional revised plans and calculations. JCM
Routing Off Site - STRUCTURAL4/7/2003 4/11/2003 FAIL
Received letter from consulting structural engineer requesting additional revisions. JCM
Routing - PLAN CHECK3/5/2003 4/11/2003  
Plan resubmittals received  4/7/2003 DONE
Received three sets of resubmittal sheets "1of 37, 2of 37, 3of 37, 4of 37, 5of 37, 6of 37, 7of 37, 8of 37, 9of 37, 10of 37, 11of 37, 12of 37, 13of 37, 14of 37, 15of 37, 16of 37, 17of 37, 18of 37, 18A of 37, 18B of 37, 19 of 37, 20 of 37, 21 of 37, 22 of 37, 23 of 37, 24 of 37, 25 of 37, 26 of 37, 27 of 37, 28 of 37, 29 of 37, 30 of 37, 31 of 37, 32 of 37, 33 of 37, 34 of 37, 35 of 37, 36 of 37, 37 of 37, EN1.0, EN2.0, EO-1, E0-2, E0-3, SE-1, E-4, E-5, ES-1, ES-2, ES-3, P1.0, P2.0, P3.0, M1.0, M2.0, M3.0, (1) Office HVAC Energy Loads, (1) Shop HVAC Energy Loads, (3) Volume 5 Structural Calculations, (3) Volume 4 Revised Structural Calculations, and comment letter. Routed to John Menard.
Plan resubmittals received  4/7/2003 DONE
Contacted Pdq to take revised plans of 4/4/03 to outside eng. kmm
Routing - FIRE2/28/2003 3/5/2003 FAIL
no review was written at this time. Awaiting resubmittal documents to John Menard before doing a thorough review.
Routing - PLAN CHECK1/24/2003 2/28/2003  
Routing - PUBLIC WORKS2/28/2003 2/28/2003 FAIL
no plumbing plans for wash pod and valve arrangement.
Routing Off Site - STRUCTURAL1/17/2003 2/25/2003 FAIL
contacted PDQ to take plans to outside eng. kmm Received letter from consulting structural engineer requesting revisions. JCM
Routing - PLUMBING1/23/2003 1/24/2003 FAIL
plans being revised per engineer for proper waste disposal.
Routing - PLANNING1/23/2003 1/23/2003 PASS
Approved per DRH02-143. Under BLD03-00027 there were some floodplain issues that were being addressed through Public Works.
Routing - PUBLIC WORKS1/21/2003 1/22/2003 FAIL
Requires drainage plans revisions per Brian M. kmm
Routing - Erosion and Sediment1/22/2003 1/22/2003 PASS
ESC plans approved under ESC03-00015 that was routed with the grading permit Bld03-00027. kmm
Plans ACCEPTED BY PLAN TECH  1/17/2003 DONE
Requires arch/eng. record form. We are routing both buildings under same plans/separate permits. kmm
Plan routing begun/NEW & ADDTN  1/17/2003 DONE
Routing - PLANNING Land Div1/17/2003 1/17/2003 FAIL
Need recorded deed with legal description of entire parcel and new tax parcel #.
Application received  1/16/2003  
Recd Pcfee & Taken To Pln CK  1/16/2003 DONE
Fee Review-notes1/16/20031/16/2003